Tender For Special Repairs To 6 Mva Power Transformer In 33/11 Kv Sub Station At Rangapahar Mil Stn, Shillong-Meghalaya

Military Engineer Services-MES has published Tender For Special Repairs To 6 Mva Power Transformer In 33/11 Kv Sub Station At Rangapahar Mil Stn. Submission Date for this Tender is 01-11-2023. Transformer Repair Tenders in Shillong Meghalaya. Bidders can get complete Tender details and download the document.




Tender Notice

39787938
Corrigendum : Tender For Special Repairs To 6 Mva Power Transformer In 33/11 Kv Sub Station At Rangapahar Mil Stn
Open Tender
Indian
Meghalaya
Shillong
01-11-2023

Tender Details

Special Repairs To 6 Mva Power Transformer In 33 / 11 Kv Sub Station At Rangapahar Mil Stn

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-Oct-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 27-10-2023
2 27-Oct-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 01-11-2023

Key Value

Document Fees
INR 1000 /-
EMD
INR 119500.0 /-
Tender Value
INR 63 Lakhs /-

BOQ Items

Name of Work: SPECIAL REPAIR TO 6 MVA POWER TRANSFORMER IN 33/11 KV SUB STATION AT RANGAPAHAR MIL STN.
Sl. No. Item Description
1Taking down carefully the existing 6 MVA power transformer rating 33/11 KV(Ser No 21940, customer ref No RMS/MES/RANG/2011-12/004 dt 09 Jan 2012, Make : VOLTAMP, ONAN type) from plinth with the help of hydraulic crane of suitable capacity for shifting oftransformer from 33 KV substation (MRS) to OEMs workshop and return after complete repair/ rectification & testing to the substation and refixing the transformer at its original position as indicated including connection of controlling cable/ wire from transformer to VCB and control panel, connection of 33 KV HV and 11KV LV side lines to the transformer including commissioning & testing complete all as specified and directed by Engr-in-Charge. Note:-(i)To and fro transportation of transformer including transit insurance charges are deemed to be included in quoted rate. (ii) Charges for Loading/ unloading of power transformer at substation and workshop are deemed to be included in quoted rate. (iii) Charges for commissioning and testing at site are deemed to be included in quoted rate.
2Material and Labour for removing complete transformer oil, dismantling of radiator, explosion vent, conservator tank,breather, buchholz relay, thermometer and bushing including lifting of core winding assembly by hydra/ crane of suitable capacity, cleaning, shot blasting & painting of transformer body, reassembleall parts and core winding assembly after replacement/ rectification,including performance and thermal testing at OEM"s workshop complete all as specified and directed by Engr-in-Charge. Note:- (i) The rectification & testing of power transformer shall be done at OEMs service centre/ workshop only. (ii) Performance/ thermal testing at OEMs workshop shall be done in presence of Rep of the Accepting officer.
3Material and labour for complete HV winding with new super enamelled copper conductor of existing gauge including replacement of all minor accessories (Paper covering, brazing rods, creep paper roll, copper lugs, gaskets, insulation materials etc) of 6 MVA Power Transformer (33/11 KV)and dehydration of core coil assembly through heat chamberfor 72 hrs completeall as specified and directed by Engr-in-charge. Note:-Cost of keeping the HV winding with care in electric oven for 72 Hrs to improve the insulation is deemed to be included in the quoted rate.
4Material and labour for complete LV winding with new super enamelled copper conductor of existing gauge including replacement of all minor accessories (Paper covering, brazing rods, creep paper roll, copper lugs, gaskets, insulation materials etc) of 6 MVA Power Transformer (33/11 KV)and dehydration of core coil assembly through heat chamberfor 72 hrs complete all as specified and directed by Engr-in-charge. Note:-Cost of keeping the LV winding with care in electric oven for 72 Hrs to improve the insulation is deemed to be included in the quoted rate.
5Material and labour for assembly of new insulation (Pressboard insulation, paper insulation, Nomex insulation and Epoxy insulation etc.) for all three phases, insulation material suitable for maximum operating temp, thermal cycling requirement, electrical stress, moisture and chemical resistance as per IEC-60076-1 for power transformer complete all as specified and directed by Engr-in-charge.
6Supply and filling of fresh new EHV grade transformer oil as per IS 2026/1977 oil including dehydration of oil as per IS -335 for 6 MVA power transformer complete all as specified and directed by Engr-in-charge. Note: Testing of BDV value of transformer oil at workshop and MRS site is deemed to be included in quoted rate.
7Notes for serial Item No. 1 to 6:- (a) Cost for all routine testas per IS 2026-2000shall deemed to be included in the quoted rate (b) Any minor item not specified above but required for proper functioning of transformer, cost of the same is deemed to be included in the quoted rate. (c) Charges for commissioning of power transformer at sub staion in presence of Engineer of OEMs also deemed in quoted rate.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail