Assam Electricity Grid Corporation Limited-AEGC has published Ngfw Based Sdwan Solution And Related Services At Assam Electricity Grid Corporation Limited Design, Supply, Installation, Testing, Commissioning And Support Post Installation For Ngfw Based Sd-Wan Solution And Related Services At Assam Electricity Grid C. Submission Date for this Tender is 12-10-2023. Electrification Work Tenders in guwahati Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Sep-2023 | Corrigendum1 | Technical Bid | 06-10-2023 |
2 | 03-Oct-2023 | CORRIGENDUM 2 | Technical Bid | 12-10-2023 |
3 | 03-Oct-2023 | TIME EXTENSION 1 | Date | 12-10-2023 |
4 | 04-Oct-2023 | QUERYRESPONSE | Other | 12-10-2023 |
5 | 06-Oct-2023 | CORRIGENDUM_III | Technical Bid | 12-10-2023 |
Sl. No. | Item Description |
1 | Item Description |
2 | SD-WAN Firewall Appliance at DC-DR in High Availibity mode with 3 Years UTP Subscription, Warranty, Support Contractand Licensing- Type 1 |
3 | SD-WAN Firewall Appliance @ Branch with 3 Years UTP Subscription, Warranty, Support Contractand Licensing - Type 2 |
4 | SD-WAN Firewall Appliance @ very Small branch with 3 Years UTP Subscription, Warranty, Support Contractand Licensing, Type - 3 |
5 | SD-WAN Virtual Firewall Appliance @ DC & DR with 3 Years Subscription, Warranty, Support Contract and Licensing (for Secure ERP Access), Type – 4 |
6 | On premise SD-WAN Management and Logging with 3 Years Warranty, Support Contractand Licensing with all necessary Server hardware and Software’s High Availability. |
7 | VPN Server and VPN Client License for 100 Users with 3 Years support |
8 | Server with MS Windows Server 2022 - Standard (for active directory implementation) |
9 | 27 U Floor Mount Server Rack for DR |
10 | 6 U Wall mount Rack for Branches |
11 | 2 Mtr. Cat 6 UTP Cable |
12 | 600 VA Line-Interactive UPS - 1 year Warranty on both UPS and Battery |
13 | 5 KVA Online UPS with 30 min. battery backup |
14 | Basic Electrification at Site (Electrical Cable Laying from the MCB to Rack UPS - 30 Mtr. Max Distance from MCB to Rack) |
15 | Electrical Earthing for DC and DR |
16 | Electrical Earthing Branch |
17 | Training for AEGCL Officials |
18 | One time Installation, Configuration and commissioning of complete SD-WAN Solution and Active Directory Implementation and Documentation and Project management |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail