}

Tender For Excavation Of Trenches, Laying Plp & Blowing Of Cable With Associated Works: Rehabilitation And Patch Work On Ofc Routes In Bundi Oa, bundi-Rajasthan

Bharat Sanchar Nigam Limited-BSNL has published Tender For Excavation Of Trenches, Laying Plp & Blowing Of Cable With Associated Works: Rehabilitation And Patch Work On Ofc Routes In Bundi Oa. Submission Date for this Tender is 12-10-2023. PEB Tenders in bundi Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

39762810
Tender For Excavation Of Trenches, Laying Plp & Blowing Of Cable With Associated Works: Rehabilitation And Patch Work On Ofc Routes In Bundi Oa
Open Tender
Indian
Rajasthan
bundi
12-10-2023

Tender Details

Tender For Excavation Of Trenches, Laying Plp & Blowing Of Cable With Associated Works: Rehabilitation And Patch Work On Ofc Routes In Bundi Oa; 1 Excavation Of Trenches / Hdd 2 Excavation Trenches Upto A Depth Of 1.65 M And Back Filling The Excavated Trenches After Laying The Hdpe / Plb Pipe With Or Without Protection For All Kind Of Soils At Below Gp Locations As Per Tender Specification ( Oft ) 3 T Joint-Karondhi 4 Suwasa-Dehit 5 Te Bundi-Alod 6 Te Talera-Barundhan 7 Te Bundi-Gudanathawat 8 Ranipura-Dablana 9 Laying Of Plb Hdpe Pipe By Hdd Method At A Depth Of 1.65Cm Or More ( For Single Plb Pipe ) ( Ofh ) 10 The Bsnl Will Supply Only Plb Hdpe Pipes / Coil Pp Rope 11 Laying Of Single Plb Hdpe Pipes / Coil, Coupled With Coupler ( Lph ) 12 Each Additional Pipe 13 The Bsnl Will Supply Plb Pipe Plbsockets / Coupler, End Caps 14 Laying And Fixing Of Dwc Pipes ( As Per Existing Tec Gr No. With Latest Amendment ) Isi Specification In Trenches On Bridges, Culverts And Lead In At G.P.S With Plb Hdpe Pipes / Coils In Side ) . ( Dwctb ) 15 The Bsnl Will Supply G.I. Troughs Pipes In Length Of Approx. 6 M Clamps And Plb Hdpe Pipes / Coils 16 Laying Of Full Round Rcc ( Isi Mark ) / Dwc Pipe ( As Per Existing Tec Gr No. Gr / Dwc-34 / 01Sept2007 With Latest Amendment ) In Trenches Over Plb Hdpe Pipes / Coils, On Culverts / Bridges / Nullah And For Cases Where Cable Is Laid Less Depth ( Wherever Required ) 17 Bsnl Will Supply Only Rcc / Dwc Pipes And Plb Hdpe Pipe. All Other Material Shall Be Arranged By Contractor. 18 Providing Cement Concrete 1:2:4 Over The Plb Hdpe Pipe / Dwc Pipe / Gi Pipe In Roads, Bridges, Crossing And Culverts And For Low Depth Protection Or Wheel Guards Of Bridges As Specified In The Construction Practices Of Of Cable Construction Including Material ( Ccw ) 19 Plb Hdpe Ducts, G.I. Pipes.Will Be Supplied By The Bsnl. All Other Meterials Required For The Work Shall Be Arranged By Contractor Rates Include Cost Of Material And Standard Curring Shultering Etc . 20 Cable Laying By Pulling / Blowing 21 Laying Of Cable Upto 48F By Pulling / Blowing Method Including Openning Of Mamhole.Sealing Of Plb Hdpe Pipes ( Ofcp ) 22 Laying Of Cable Of 96Fby Pulling / Blowing Method Including Openning Of Mamhole.Sealing Of Plb Hdpe Pipes ( Ofcb ) 23 Bsnl Will Provide Only Of Cable. All Other Meterials Required For The Work Shall Be Arranged By The Contractor 24 Splicing Of Of Cable 25 Splicing Of Fibers Of 24F Of Cable In Existing / New Joint Chambers Or Atftb For Making Straight / Branch Joints On New Routes Or At Fpoi And End To End Testing Of All Fibers After Splicing.The Rates Specified Are Inclusive Of Installation Of And Splicing Of Splitters Also Whereever Applicable. ( Ssbj ) 26 Splicing Of Fibers Of 48F Of Cable In Existing / New Joint Chambers For Making Straight / Branch Joints On New Routes Or At Fpoi And End To End Testing Of All Fibers After Splicing.The Rates Specified Are Inclusive Of Installation Of And Splicing Of Splitters Also Whereever Applicable. ( Ssbj ) 27 Splicing Of All The Fibers Ofof Cable In The Fiber Termination Box At The Gram Panchyats And Testing All The Fibers For Continuity.This Will Also Include Installation / Mounting Of The Ftb And Spare Cable Chamber As Specified ( Sftb ) 28 Note:- All Tools Splicing Machine And Instruments Required For Above Work Shell Be Arranged By The Contractor 29 Jointing Chamber 30 Construction Of Pre Fabricated Rcc Joints Chamber As Per Specification As Specified In The Tender Document / Construction Practices ( Jcrc ) 31 All Materials Required For The Work Shall Be Arranged By The Contractor 32 Route Indicator 33 Supply And Fixing Of Rcc / Stone Route / Joint Indicator , Painting , Sign Writing As Per Tender Document. ( Risr ) 34 Restoration Of Road Surface 35 Boring / Cutting ( Morrum / Pucca Road ) / Black Top Or Concrete Road ( Depth 165Cm ) At Road Crossing And Any Other Anavoidable Hindrance ( Mbr ) 36 Road Restoration Work With Cement Concrete 1:4:8 Mix For Thickness Varying From 150Mm To 225Mm Including Supply Of Material To Evenly Matching The Road. ( Rrsc ) 37 All Materials Required For The Shall Be Arranged By Contractor 38 Route Index Diagram 39 Supply Of Route Index Diagram In 4 Hardcopiesas Well As 1 Soft Copy On Cd Containing Diagrams And All Details Including Lat / Long Of Each Joint / Route Indicator On Good Quality Paper For Complete Route Along With Videography Of Route ( Drid ) 40 The Contractor Shall Arrange All Materials Required For The Work 41 Laying Of Of Cable In Building ( Leading In Work ) 42 Laying Of Of Cable In In Existing Ducts ( Ofcd ) 43 Extra Pits For Picking Old Cables 44 Pvc / Tuflex Pipe Shall Be Provided By The Bsnl. All Other Materials Required For The Work Shall Be Arranged By The Contractor 45 Mouting Of Fdms At Bts / Exchange / Olt Locations 46 All Materials Required For The Work Shall Be Arrange By The Contractor 47 Recovery Of Store 48 Cost Of Recovery Cable Drum ( Recd )

Key Value

Document Fees
INR 590 /-
EMD
INR 48690.0 /-
Tender Value
INR 19.47 Lakhs /-

BOQ Items

Name of Work: Excavation of trenches, laying PLP & blowing of cable with associated works: Rehabilitation and Patch work on OFC routes in Bundi OA
Sl. No. Item Description
1Excavation of Trenches/HDD
2Excavation trenches upto a depth of 1.65 m and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection for all kind of soils at below GP Locations as per tender specification (OFT)
3T joint-Karondhi
4Suwasa-dehit
5TE Bundi-Alod
6TE Talera-Barundhan
7TE Bundi-Gudanathawat
8Ranipura-Dablana
9Laying of PLB HDPE Pipe by HDD method at a Depth of 1.65cm or more (for Single PLB Pipe) (OFH)
10The BSNL will supply only PLB HDPE Pipes/coil PP Rope
11Laying of single PLB HDPE Pipes /coil,coupled with coupler (LPH)
12Each additional Pipe
13The BSNL will supply PLB Pipe PLBSockets/coupler,End caps
14Laying and fixing of DWC Pipes ( as per existing TEC GR No. with latest amendment) ISI specification in trenches on bridges,Culverts and Lead in at G.P.s with PLB HDPE pipes/ coils in side).(DWCTB)
15The BSNL will supply G.I. troughs Pipes in length of approx. 6 M Clamps and PLB HDPE Pipes /coils
16Laying of full round RCC(ISI Mark)/DWC Pipe(as per existing TEC GR No. GR/DWC-34/01Sept2007 with latest amendment) in trenches over PLB HDPE Pipes/coils, on culverts/bridges/nullah and for cases where cable is laid less depth (Wherever required)
17BSNL will supply only RCC/DWC pipes and PLB HDPE pipe. All Other Material shall be arranged by contractor.
18Providing cement concrete 1:2:4 over the PLB HDPE Pipe/DWC Pipe/GI Pipe in roads, bridges, crossing and culverts and for low depth protection or wheel guards of bridges as specified in the construction practices of OF Cable construction including material(CCW)
19PLB HDPE ducts,G.I. Pipes.will be supplied by the BSNL. All other meterials required for the work shall be arranged by contractor Rates include cost of material and standard curring shultering etc .
20Cable laying by pulling/blowing
21Laying OF Cable upto 48F by pulling/blowing method including openning of Mamhole.Sealing of PLB HDPE Pipes (OFCP)
22Laying OF Cable of 96Fby pulling/blowing method including openning of Mamhole.Sealing of PLB HDPE Pipes (OFCB)
23BSNL will provide only OF cable. All Other meterials required for the work shall be arranged by the contractor
24Splicing of OF Cable
25Splicing of fibers of 24F OF Cable in existing/New joint Chambers Or atFTB for making Straight/Branch joints on new routes or at FPOI and end to end testing of all fibers after Splicing.The rates specified are inclusive of installation of and splicing of splitters also whereever applicable. (SSBJ)
26Splicing of fibers of 48F OF Cable in existing/New joint Chambers for making Straight/Branch joints on new routes or at FPOI and end to end testing of all fibers after Splicing.The rates specified are inclusive of installation of and splicing of splitters also whereever applicable. (SSBJ)
27Splicing of all the fibers ofOF Cable in the fiber Termination BOX at the Gram Panchyats and testing all the fibers for continuity.This will also include installation /mounting of the FTB and spare cable Chamber as specified (SFTB)
28Note:- All tools Splicing machine and instruments required for above work shell be arranged by the contractor
29Jointing Chamber
30Construction of pre fabricated RCC joints chamber as per specification as specified in the tender document/construction practices (JCRC)
31All materials required for the work shall be arranged by the contractor
32Route Indicator
33Supply and fixing of RCC/Stone route/joint indicator ,painting ,sign writing as per tender document.(RISR)
34Restoration of road surface
35Boring/Cutting (Morrum/Pucca Road)/ Black top or concrete road (Depth 165CM) at road crossing and any other anavoidable hindrance(MBR)
36Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm including supply of material to evenly matching the road. (RRSC)
37All materials required for the shall be arranged by contractor
38Route index Diagram
39Supply of route index diagram in 4 hardcopiesas well as 1 soft copy on cd containing diagrams and all details including Lat/Long of each Joint/Route Indicator on good quality paper for complete Route along with videography of route(DRID)
40The contractor shall arrange all materials required for the work
41Laying of OF Cable in building (Leading in work)
42Laying of OF Cable in In existing ducts(OFCD)
43Extra Pits for picking old cables
44PVC/Tuflex Pipe shall be provided by the BSNL. All other materials required for the work shall be arranged by the contractor
45Mouting of FDMS at BTS/Exchange/OLT Locations
46All Materials required for the work shall be arrange by the contractor
47Recovery of store
48Cost of recovery cable Drum (RECD)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail