Rural Development-RD has published Supply & Repairing Work Of H.T Transformers Rating 250 - 630 Kva Installed In 33/0.4 Kva Sub-Station At District Combined Hospital Amroha.. Submission Date for this Tender is 25-09-2023. Electrification Work Tenders in amroha Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Repairing Work of 250 KVA/ 33/0.4 KV Transformer. |
2 | New copper coil. |
3 | Return old copper coil. |
4 | Oil dehydration Work of transformer. |
5 | Providing and filling of transformer oil. |
6 | providing and replacement of damaged LT bushing. |
7 | providing and replacement of damaged HT bushing. |
8 | Repairing work of oil tank. |
9 | Oil tank will repair at Site (in case miner Leakage). |
10 | Oil tank will repair in workshop (in case major Leakage). |
11 | Replacement of new oil tank. |
12 | Providing and filling of 250 gm silika gel box. |
13 | Providing and filling of 500 gm silika gel box. |
14 | Providing and filling of 1000 gm silika gel box. |
15 | Replacement of new radiator. |
16 | Replacement of new tape changer. |
17 | Replacement of damaged M.S or C.I LT box. |
18 | Replacement of damaged analogue temperature gauge size-200 mm. |
19 | Replacement of damagedtemperature probe. |
20 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing |
21 | Repairing Work of 400 KVA/ 33/0.4 KV Transformer |
22 | New copper coil. |
23 | Return old copper coil. |
24 | Oil dehydration Work of transformer. |
25 | Providing and filling of transformer oil. |
26 | providing and replacement of damaged LT bushing. |
27 | providing and replacement of damaged HT bushing. |
28 | Repairing work of oil tank. |
29 | Oil tank will repair at Site (in case miner Leakage). |
30 | Oil tank will repair in workshop (in case major Leakage). |
31 | Replacement of new oil tank. |
32 | Providing and filling of 250 gm silika gel box. |
33 | Providing and filling of 500 gm silika gel box. |
34 | Providing and filling of 1000 gm silika gel box. |
35 | Replacement of new radiator. |
36 | Replacement of new tape changer. |
37 | Replacement of damaged M.S or C.I LT box. |
38 | Replacement of damaged analogue temperature gauge size-200 mm. |
39 | Replacement of damagedtemperature probe. |
40 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing for Each Unit of Hospitals in Moradabad Division) |
41 | Repairing Work of 630 KVA/ 33/0.4 KV Transformer |
42 | New copper coil. |
43 | Return old copper coil. |
44 | Oil dehydration Work of transformer. |
45 | Providing and filling of transformer oil. |
46 | providing and replacement of damaged LT bushing. |
47 | providing and replacement of damaged HT bushing. |
48 | Repairing work of oil tank. |
49 | Oil tank will repair at Site (in case miner Leakage). |
50 | Oil tank will repair in workshop (in case major Leakage). |
51 | Replacement of new oil tank. |
52 | Providing and filling of 250 gm silika gel box. |
53 | Providing and filling of 500 gm silika gel box. |
54 | Providing and filling of 1000 gm silika gel box. |
55 | Replacement of new radiator. |
56 | Replacement of new tape changer. |
57 | Replacement of damaged M.S or C.I LT box. |
58 | Replacement of damaged analogue temperature gauge size-200 mm. |
59 | Replacement of damagedtemperature probe. |
60 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing for Each Unit of Hospitals in Moradabad Division) |
61 | Providing & Fixing of New Transformers. |
62 | Supply of new 250 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES |
63 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. |
64 | Supply of new 400 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES |
65 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. |
66 | Supply of new 630 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES |
67 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. |