Public Health Engineering Department-PHED has published Construction Of Rcc Pipe Channel, Const. Of S/S Tank, Rcc Suction Well For Raw Water And Clear Water, Pump Chamber, 2 Nos. High Level Tank, 4 Nos. Filter Beds, 2 Nos. Clear Water Tank, Boundary Wall, Pipe Line. Submission Date for this Tender is 09-10-2023. Concrete Pipe Tenders in kheri Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | N.S. Item |
2 | Supply erection testing of reputed make LED light 100watt |
3 | Supply ereetion, testing of light fittings including wire in the Pump Chamber with material upto 10 points including switch, button, plug, PVC conduit pipe and copper wire etc. as per approved specifications 20 |
4 | Supplying erection, testing of ISI marked copper wire for motors with under ground system in PVC and flexible pipes copper wirecomplete in all respects with accessories like thimble etc. complete in respects. 6 SQM |
5 | Supplying erection, testing of ISI marked copper wire for motors with under ground system in PVC and flexible pipes copper wire 10 SQM complete in all respects with accessories like thimble etc. complete in respects |
6 | Supply and erection of Horizontal spindle split casing type pumping sets minimum Four Star rating duties coupled to AC squirrel cage induction type motor with 1440 RPM 3 phase 50 Hz and accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame 1400 LPM X 12 Mtrs HEAD |
7 | Lowering of sub-soil water level upto bottom of the foundation concrete of the Structures by providing well point system on both side of the trench including cost of 100 mm dia boring. Providing and installing pipes 100 mm dia for the bore developing for a successful bore, providing and installation of pumping machinery, suction/delivery pipes, disposal of water 20 mtr away from bore point including cost of repair maintenance, running cost machinery, and diesel oil charges, consumable items, pay of the operational staff, and dismantling of the pumping machinery, and filling the bores with sand after use and reinstallation the same to the next site for repeating of the above process of well point system, if required complete construction/testing of the structures. under dry condition Nothing extra will be paid for any difficulties met with during execution/construction, This, item is only payable for after Completion of Structures and notihing shall be payable if the water table is lowered and construction work is delayed or not done due to any reason what so far. |
8 | Operation and Maintenance of water works and Pumping Machinery ( disinfection material supplied by the Dept.) as per schedule IV for a period of 6 Years including 1 year defect lability period after 3 moths trial run period including Distribution as per DNIT.(72 months) ( will be charged to A/mtc estimates) 1st year Operation and Maintenance. |
9 | 2nd year Operation and Maintenance. |
10 | 3rd year Operation and Maintenance. |
11 | 4th year Operation and Maintenance. |
12 | 5th year Operation and Maintenance. |
13 | 6 th year Operation and Maintenance. |
14 | Less Credit for Old material Brick Taking 60% Bricks and 40% Bricks bats |
15 | Credit Less Credit for Old material Brick Taking 60% Bricks and 40% Bricks bats |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail