Tender For Supply Of Equipment/ Material, Design, Erection, Testing & Commissioning For Sop To Executive Officer Municipal Council Nurpur For Prov. 11/0.4 Kv 100 Kva S/Stn A/W Ht & Lt Line For Solid Waste Management Processing Site At Chinwan In (E) Secti, nurpur-Himachal Pradesh

Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Of Equipment/ Material, Design, Erection, Testing & Commissioning For Sop To Executive Officer Municipal Council Nurpur For Prov. 11/0.4 Kv 100 Kva S/Stn A/W Ht & Lt Line For Solid Waste Management Processing Site At Chinwan In (E) Secti. Submission Date for this Tender is 26-09-2023. Electrification Work Tenders in nurpur Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39740966
Tender For Supply Of Equipment/ Material, Design, Erection, Testing & Commissioning For Sop To Executive Officer Municipal Council Nurpur For Prov. 11/0.4 Kv 100 Kva S/Stn A/W Ht & Lt Line For Solid Waste Management Processing Site At Chinwan In (E) Secti
Open Tender
Indian
Himachal Pradesh
nurpur
26-09-2023

Tender Details

Tender For Supply Of Equipment / Material, Design, Erection, Testing & Commissioning For Sop To Executive Officer Municipal Council Nurpur For Prov. 11 / 0.4 Kv 100 Kva S / Stn A / W Ht & Lt Line For Solid Waste Management Processing Site At Chinwan In ( E ) Section Nurpur Under Esd Nurpur--11 Kv Ht Line 2 Prov. Aaac ( 7 / 3.81 80Mm² ) { Neutral Conductor Including 1% ( Sag, Jumpering And Wastage } . 3 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) . . 4 Prov. Muffs With Concerete Filling. 5 Prov. Gi Wire 8 Swg. 6 Prov. Disc Insulator Set Cleave & Tounge Halicaly Formed Fitting 7 Prov. Pin Insulator With Gi Pin 8 Prov. Cross Arm: [ Channel Iron ( 100X50x6 Mm ) , Length: 2340 Mm 9 Prov. X-Arm ( Horizontal ) - Ms Channel Iron: 100X50x6, Length: 1500 Mm 10 Prov. Angle Iron ( 50X50x6 Mm ) , Length: 750 Mm X 2 No. For S / P Str. 11 Prov. & Fabrication Of Top Hamper Set - Ms Angle Iron: 50X50x6, 12 Prov.Stay Set Complete Ht I / C Egg.Pole Top Bracket [ Msci:100X50x6 Mm- 100 Mm ] . 13 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 7.0 Kg Per Stay Set ) 14 Prov. Go Ab Switch Unit ( 11Kv, 400A, ) O / D Type 15 Prov. 11Kv Earthing Set Complete In All Respect. 16 Prov.Earth Cross Arms Of Angle Iron ( 50X50x6mm ) Length: 3000 Mm 17 Prov. Danger Plate ( 250X200x1.6 Mm ) 18 Prov. C.I. ( 75X40x6mm ) Length 2400Mm For Road / Khad Crossing. 19 Prov. 11Kv Do Fuse Complete In All Respect. 20 .Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 21 Prov. Barbed Wire 22 Prov. Aluminium Paint 23 Erection Of 9 Mtr. St Pole Singlestructure I.E. Digging Of Pit, Fixing Of Insulator, X-Arms, K.B. Set, Top Clamp, Barbed Wire, Danger Plate, Drilling Of Holes And Filling Of Pit + Rammingcomplete In All Respect. 24 Erection Of Stay Set Ht I.E. Digging Of Pit, Fixing Of Stay Road, Filling Of Pit, Nozzeling & Tightning 25 Erection Of G.O. Switch 400 Amp. Comp. 26 Fixing Of Jumper 27 Sagging Of Conductor I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 28 Sagging Of Gi Wire I.E. Laying, Stringing And Sagging & Binding ( Single Wire Per Km ) . 29 Transportation Charges @10060 / - Per Km 30 Mannual Carriage Of Material 1 Km Ht Line Considering Average Distance From Road To Site Of Work ( 0.500 Km ) 31 100 Kva Trsanformer 32 Prov. Distribution Transformer ( Ordinary ) , 11 / 0.4 Kv, 100 Kva . 33 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) . 34 Prov. Muffs With Concerete Filling 35 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Incomer Line 36 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length: ( 2800 Mm ) X1 Nos For LaS 37 Prov. X-Arm: [ Channel Iron ( 75X40x6 Mm ) , Length : ( 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 38 Prov. Transformer Bed, Belting & Knee Bracing 39 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Transformer Bed 40 Prov. X-Arm [ Channel Iron ( 100X50x6 Mm ) , Length : ( 460Mm ) X 2 Nos For Supporting Main Channel Of Transformer ] 41 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 42 Prov. Ms Angle Iron ( 35X35x5 Mm ) , Length : ( 460 ) X 2 Nos 43 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 950 Mm ) X 2 Nos For Bed Knee Bracing 44 Prov. Transformer Lt Distribution Box And Go Switch Fixing Assembly 45 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 46 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 450 Mm ) X 1 Nos 47 Prov. Go Switch Handle Supporting: [ Channel Iron ( 75X40x6 Mm ) , Length : 460 Mm 48 Prov. Go Ab Switch Unit ( 11Kv, 400A, 25 Ka ) Tripple Pole O / D Type 49 Prov. D.O Fuse Unit 50 Prov. Lighting Arrester, 9 Kv Station Class ( Porcelain Type ) 51 Prov. Discs Insulator Sets ( Comprising 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamps Etc. ) 52 Prov. Stay Set Complete 53 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) 54 Prov. Pipe Earthing Set 55 Prov. Lt Distribution Panel Box With Mccb ( 160A, 10Ka, 4P, 1No ) & Sfu ( 32A, 5No, Rewirable ) 56 Prov. Half Clamp ( M.S. Flat 50X6 Mm ) 57 Prov. Full Clamps ( M.S. Flat 50X6 Mm ) 58 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 59 Prov. Aluminium Thimble 60 Prov. Aluminium Thimble 61 Prov. Danger Plate 62 Prov. Barbed Wire 63 Prov. Lt Cable ( 3.5 Core ) 120 Mm² 64 Prov. Energy Meter 3-?, 4 Wire Ct Operated Static Tri-Vector Meter With Box ( Ct-100-200 / 5A ) 65 Prov. Aluminum Paint. 66 Prov. 6 / 1 / 3.35, 50Mm². 67 Prov. Transformer Fencing , Angle Iron , Gate Etc & Protection Plinth ( Civil Work As Per Hpsr ) . 68 Erection Of 100 Kva S / Stn. I.E. Digging Of Pit For Pole & Earthing Two No. Poles & 3 Nos. For Earthdrilling Of Holes In X-Arms, Preparation Of Plateform Str. Members C.I., A.L. I.E. X-Arms & K.B. Set, Errection Of D / P, Concreating Of Rcc Muff Errection Of Plateform, Errection Of X-Arms, D.O., L.A., Mccb, Switch Lt Box, Energy Meter, Errection Of Transformer, Earthing Connection To G.O. Switch, Transformer L.A. Etc., Errection Of Stay Set, Jumper, Pipe Earthing 3 Nos Set, L.T. Cable, Barbed Wire And Painting Complete In All Respect. 69 Transportation Charges @10060 / - 70 Prov. Transportation Charges & Mannual Carriage Of 100 Kva Pole Mounted Distribution S / Stn. 71 Lt Line 72 Prov. Aaac ( 7 / 3.15 50Mm² ) { Neutral Conductor Including 1% ( Sag, Jumpering And Wastage } . 73 Prov. Steel Tubular Poles ( 8 M, Working Load > 200 Kgf / M² ) . . 74 Prov. Muffs With Concerete Filling. 75 Prov. Shackle Insulator With D-Iron 76 Prov. Lt Stay Set I / C Egg Insulator. 77 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 78 Prov. Stay Wire 79 Erection Of 8 Mtr. St Pole Singlestructure I.E. Digging Of Pit, Fixing Of Insulator, X-Arms, K.B. Set, Top Clamp, Barbed Wire, Danger Plate, Drilling Of Holes And Filling Of Pit + Rammingcomplete In All Respect. 80 Erection Of Stay Set Lt I.E. Digging Of Pit, Fixing Of Stay Road, Filling Of Pit, Nozzeling & Tightning 81 Sagging Of Conductor I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 82 Transportation Charges @10060 / - 83 Mannual Carriage Of Material 1 Km Lt Line Considering Average Distance From Road To Site Of Work ( 0.500 Km ) 84 Quantities Are Mentioned Above Are Tentative And Actual Quantity Shall Be Worked Out After Check Survey To Be Carried Out By The Successful Tender And Detailed Engineering And Finalization Of Tower Location Chart.Payment Shall Be Made As Per Approved Bill Of Material / Actual Quantities Measured At Site.

Key Value

Document Fees
INR 590 /-
EMD
INR 6000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Tender for supply of equipment/ Material, design, erection, testing & commissioning for SOP to Executive Officer Municipal Council Nurpur for prov. 11/0.4 KV 100 KVA s/stn a/w HT & LT Line for solid waste management processing site at Chinwan in (E) section Nurpur under ESD Nurpur (T.S No 65/2023-24 Sanctioned Amount Rs. 712480/-)
Sl. No. Item Description
111 KV HT Line
2Prov. AAAC (7/3.81 80mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage}.
3Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²). .
4Prov. Muffs with concerete filling.
5Prov. GI Wire 8 SWG.
6Prov. Disc Insulator Set cleave & Tounge halicaly formed fitting
7Prov. Pin Insulator with GI Pin
8Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length: 2340 mm
9Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 1500 mm
10Prov. Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. for S/P Str.
11Prov. & fabrication of top hamper Set - MS Angle Iron: 50x50x6,
12Prov.Stay set complete HT i/c Egg.Pole Top Bracket [MSCI:100x50x6 mm- 100 mm].
13Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
14Prov. GO AB Switch Unit (11kV, 400A,)O/D type
15Prov. 11KV Earthing Set Complete in all respect.
16Prov.Earth Cross arms of angle Iron (50x50x6mm)Length: 3000 mm
17Prov. Danger Plate (250X200X1.6 mm)
18Prov. C.I. (75x40x6mm) Length 2400mm for Road/Khad Crossing.
19Prov. 11Kv DO Fuse complete in all respect.
20.Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
21Prov. Barbed Wire
22Prov. Aluminium Paint
23Erection of 9 Mtr. ST pole singlestructure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect.
24Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning
25Erection of G.O. switch 400 Amp. Comp.
26Fixing of jumper
27Sagging of conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
28Sagging of GI Wire i.e. laying, stringing and sagging & binding(Single wire per KM).
29Transportation charges @10060/- per Km
30Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.500 Km)
31100 KVA Trsanformer
32Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA .
33Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) .
34Prov. Muffs with concerete filling
35Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
36Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA"s
37Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
38Prov. Transformer Bed, Belting & Knee Bracing
39Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
40Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer]
41Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
42Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
43Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
44Prov. Transformer LT Distribution Box and GO Switch fixing Assembly
45Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
46Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
47Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
48Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
49Prov. D.O Fuse Unit
50Prov. Lighting Arrester, 9 kV Station Class(Porcelain Type)
51Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
52Prov. Stay set complete
53Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
54Prov. Pipe Earthing Set
55Prov. LT Distribution Panel Box With MCCB(160A, 10KA, 4P, 1No) & SFU(32A, 5No, rewirable)
56Prov. Half Clamp (M.S. Flat 50X6 mm)
57Prov. Full Clamps (M.S. Flat 50X6 mm)
58Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
59Prov. Aluminium Thimble
60Prov. Aluminium Thimble
61Prov. Danger Plate
62Prov. Barbed Wire
63Prov. LT Cable (3.5 Core) 120 mm²
64Prov. Energy Meter 3-?, 4 wire CT operated Static Tri-Vector meter with Box(CT-100-200/5A)
65Prov. Aluminum Paint.
66Prov. 6/1/3.35, 50mm².
67Prov. Transformer fencing , Angle Iron ,Gate etc & Protection plinth (Civil Work as per HPSR) .
68Erection of 100 KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earthdrilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect.
69Transportation charges @10060/-
70Prov. Transportation charges & Mannual carriage of 100 KVA pole mounted distribution S/Stn.
71LT Line
72Prov. AAAC (7/3.15 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage}.
73Prov. Steel Tubular Poles (8 m, Working Load > 200 kgf/m²). .
74Prov. Muffs with concerete filling.
75Prov. Shackle Insulator with D-Iron
76Prov. LT Stay Set I/c Egg Insulator.
77Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
78Prov. Stay Wire
79Erection of 8 Mtr. ST pole singlestructure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect.
80Erection of Stay set LT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning
81Sagging of conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
82Transportation charges @10060/-
83Mannual carriage of material 1 KM LT line considering average distance from road to site of work (0.500 Km)
84Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail