| 1 | Detail of Work |
| 2 | Safely cartage ofPCC Pole 8.5 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 25 KM.) |
| 3 | Erection of single support on PCC poles up to 8.5 MtrLong with complete fitting of all accessories of11 KV Line as per RESPO specification |
| 4 | Safely carriage of Line Material (Except PCC Pole)ESC SRE to site of works through privet vehicle including loading and unloading at both ends. (Distance 0 to 25 K.M.) |
| 5 | Fabrication and Erection of D/P on PCC poles 8.5 Mtr. Long with complete fitting including concreting in block of 450x450x1500mm. in ratio 1:4:8 with cement, sand and brick ballast size 1”x1.5” as per RESPO specification. |
| 6 | Safe cartage of 100 KVA T/F from ESC,SRE to site of work including loading & unloading at both ends. (Dist. Upto 25 km.) |
| 7 | Safe installation of 100 KVA T/F on the D/P with complete fittings including making connections and commissioning. |
| 8 | Removal of 100 KVA T/F from the existing D/P after opening HT & LT connection and with shifting the T/F from the site to ESC, SRE/JE store with loading & unloading at both ends. |
| 9 | Safe cartage of 250 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 25 km.) |
| 10 | Constriction of plinth for installation of 250 kv T/F of size 1.5x1.5x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 11 | Safe installation of 250 KVA T/F on the Plinth with complete fittings including making connections and commissioning. |
| 12 | Fencing of 250 KVA Transformer as per RESPO Specification. |
| 13 | Grouting of stay rods by digging of pits in block 600x600x300 MM & cementconcreting in ratio 1:4:8 with cement, sand and brick ballast and nozzling of stay wire 7/10 SWG and fitting the same on the pole including fixing of stay insulator in stay wire. |
| 14 | Fixing of 3 phase Distribution Box properly. |
| 15 | Providing and fixing of Lug. |
| 16 | Laying, lifting, stringing, sagging jump ring & binding of ACSR weasel conductor for HT/LT Line. |
| 17 | Laying, lifting, stringing, sagging jump ring & binding of Dog weasel conductor for HT/LT Line. |
| 18 | Laying, lifting, Stringing, proper sagging ABC cable of size 3x95 sq.mm. including fixing of all type clamps and connector providing all accessories. |
| 19 | Pipe/Chemmical Earthing of 250 KVA T/F as per REPSO Specification |
| 20 | Providing and fixing of all type clamp with nut & bolt . |
| 21 | Earthing of pole by Earthing rod. |
| 22 | Laying of LT/XLPE cable 1*240 sq. mm as per respo specification. |