}

Tender For Supply Of Material And Works Against System Augmentation/Strengthening Works In Different Districts Head On Semi Turn Key Basis In Eudd-Mayohall, Bamrauli And Tagore Town Under Eudc-Ii, Prayagraj, prayagraj-Uttar Pradesh

Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Supply Of Material And Works Against System Augmentation/Strengthening Works In Different Districts Head On Semi Turn Key Basis In Eudd-Mayohall, Bamrauli And Tagore Town Under Eudc-Ii, Prayagraj. Submission Date for this Tender is 25-09-2023. Cleaning Rags and Cloths Tenders in prayagraj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39712534
Tender For Supply Of Material And Works Against System Augmentation/Strengthening Works In Different Districts Head On Semi Turn Key Basis In Eudd-Mayohall, Bamrauli And Tagore Town Under Eudc-Ii, Prayagraj
Open Tender
Indian
Uttar Pradesh
prayagraj
25-09-2023

Tender Details

Supply Of Material And Works Against System Augmentation / Strengthening Works In Different Districts Head On Semi Turn Key Basis In Eudd-Mayohall, Bamrauli And Tagore Town Under Eudc-Ii, Prayagraj- 1 SUPPLY OF MATERIALS (Part-A) 2 Holding Clamp for Top Chanel (STP/PCC) 3 Clamp distribution Box LT 4 Suspension Clamp for ABC Cable 5 Dead End Clamp for ABC Cable 6 Stone Pad (300x300x75 MM) 7 Earth wire clamp with bolts & nuts 8 Bolts, Nut & Washer All size 9 Control Cable 4x2.5 sqmm sizes 10 Aluminium Crimping Lug 70sqmm 11 Aluminium Crimping Lug 120 sqmm 12 Aluminium Crimping Lug 240 sqmm 13 Aluminium Crimping Lug 400 sqmm 14 Aluminium Crimping Lug 630 sqmm 15 LT Shackle Insulator 16 Chemical Earthing Complete 17 I- Hook 18 PRC 120 Sqmm 19 DD Wire PVC 70 Sqmm 20 LT Cubical Box For Tailness Unit 21 Tailness Unit 500 Amp 22 Tailness Unit 300 Amp 23 Copper Strip 50x6sqmm 24 GI Strip 50x6 25 U-Bolt with Nuts 26 Copper L Piece 50x225x10 mm 27 GI Pipe 6 28 MOUNTING, FITTING & ERECTION OF WORK AS PER RESPO NORM. (Part-B) 29 Eerection, grouting, plinthing & earthings of 11 mtr double pole double support with fixing of necessary clamps and other accessories like channel,, angle iron etc.grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractor with one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.) 30 Laying of single 11 KV, 3x120 sq mm XLPE cable Hanging method with help of stay wire/ normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.) 31 Fixing ofHeat Shrink cable type end Terminations suitablefor 11 KV, 3x120 sq mm XLPE cable and 11 KV 3x185/3x120/3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules. 32 Outdoor/indoor jointing kit 33 Straight through jointing kit 34 Hoisting of 11 KV 3x120 sq mm XLPE cableproviding GI pipe of size 6” dia 3 M long on double pole including its jumpering, complete with providing all required material arrange by contractor with one year gauranty asper Resspo and Electrical safety rules. 35 Erection & commissioning of 11 KV VCBoutgoing/incoming/bus-coupler in the switch gear room, by grouting base channel 100 x 50 x 6 x 1000mm. Fixing of 11 KV switchgears rag bolt with proper connection, control cable provided by contractor. 11 KV VCB provided by Deptt. 36 Safely Removing & carriage of 11 KV VCBoutgoing/incoming/bus-coupler from the old switch gear room including opening all connection, 37 Laying of copper control cable form C.T. T/F to transformer control panel /protection Board. All control cable shall be supplied by the contractor. 38 Eerection, grouting, plinthing & earthings of 11 mtr single supportwith fixing of necessary clamps and other accessories like M.S.channel,angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractorwith one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.) 39 Spreading and stringing of 3 Phase 3 wire continuous conductor for 11 KV line including binding of insulator complete in all respect. The work includes jumpering/connecting of conductor at sectional poleas per Resspo and Electrical Safety rule 40 ACSR weasel conductor 41 Laying of single 11 KV, 3x70 sq mm XLPE cable Hanging method with help of stay wire/ normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.) 42 Fixing ofHeat Shrink cable type end Terminations suitable RAYCHEM RPG make for 11 KV, 3x70 sq mm XLPE cable and 11 KV 3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules. 43 Outdoor jointing kit 44 Construction of 11/0.4 KV Transformer plinth in size 1.5x1.5x 1.8 mtr. Height, including 0.6 mtr. below G.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. Thickness of 1st class brick work should be 0.35 mtr. below G.L. and above G.L. It should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, The space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. The two channels should be grouted as per direction of site in charge. All the sides of wall above G, L. should be plastered by 1:6 cement sand mortar having 12 mm thickness. 45 Providing and fixing of welded wire mesh fencing, around transformer plinth having one locking arrangements, Fencing should be provided by grouting MS angle 40x40x5 mm. length of 1.5 m. on all the sides as per standard practice and design. The painting of fencing should be done by good quality green paint with two coats after rubbing and cleaning and providing one coat red oxide primer. The fencing should be 2 M. above ground level. The rates should be inclusive of all materials required for completion of above work. 46 Erection & commissioningof T/F 400/250/100 on D.P. along with HT/LT connections with copper L-piece. Complete in all respect,as per Resspo and Electrical Safety rule 47 Earthing of transformer body and neutral by lowering of chemical pipe/Rod (earthing)connecting with GI Strip of size 50x6 mm with clamps, all material will be provided by contractor as per Resspo and Electrical Safety rule 48 Erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type D/P formounting of T/Fs with all accessories like 11 kv fuse set, TPMO, top channel, grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per Resspo and Electrical Safety rule 49 Eerection, grouting, plinthing & earthings of 11 mtr single supportwith fixing of necessary clamps and other accessories like M.S.channel,angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractorwith one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.) 50 Eerection, grouting, plinthing & earthings of 11 mtr double pole double support with fixing of necessary clamps and other accessories like channel,, angle iron etc.grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractor with one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.) 51 Earthing of support/Pannel complete with the help of M.S. rod 16 mm dia and 2.5 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. (All material will be arranged by the contractor as per Resspo and Electrical Safety rule) 52 Fixing & grouting of stay rod with cement, sand and bricks ballast in ratio !:4:8 and fasteniong the stay wire with pole and stay rod nozzling.(Grouting and all material will be arranged by the contractor with one year gauranty asper Resspo and Electrical safety rules.) 53 Laying of single 11 KV, 3x185/3x120 sq mm XLPE cable Hanging/normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.) 54 Fixing ofHeat Shrink cable type end Terminations suitable for 11 KV, 3x185/3x120/3x70 sq mm XLPE cable and 11 KV 3x185/3x120/3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules. 55 Outdoor 56 Laying/hanging of following LT cable of different sizes for main/distribution/connecting the main cable from T/F to tailless unit and for distribution, from tailless unit to LT section Pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 57 1x400/240 sq. mm. 58 3 ½ 400/240 sq. mm. 59 3 ½x150 sq. mm. 60 Erection and grouting of LT Cubical Box, Making platform for stepping, plastering the same with cement sand in raio 1:6 Fising the tailless nit 500/300 Amp making LT Bus Bar and its taping. 61 Errection andFixing the tailless unit 500/300 Amp in existing LT cubical Box/Double pole making LT Bus Bar and its taping. 62 500 Amp. 63 300 Amp. 64 Erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long STPfor LT line, including fixing of necessary clamps grouting in ratio1:4:8, cement, stone grit & coarse sand,plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long STPas per Resspo and Electrical Safety rule) 65 Errection&Commissioning of ACSR Weasl for neutral conductor in LT AB line with fixing of LT X-arm, LT shackle insulator, clamps etc. at existing LT pole as per Resspo and Electrical Safety rule 66 Errection&Commissioning of (3x120+1x195+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule 67 Errection & Commissioning of distribution boxes/kiosk on the LT poles including all clamps & materials required, connections & sealing its connection in between Distribution Box & ABC 1x35 sq. mm LT PVC cable (all required Local materialsincluding Distribution box arranged by the contractor as per Resspo and Electrical Safety rule) 68 Construction of 11/0.4 KV Transformer plinth in size 1.5x1.5x 1.8 mtr. Height, including 0.6 mtr. below G.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. Thickness of 1st class brick work should be 0.35 mtr. below G.L. and above G.L. It should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, The space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. The two channels should be grouted as per direction of site in charge. All the sides of wall above G, L. should be plastered by 1:6 cement sand mortar having 12 mm thickness. 69 Erection & commissioningof T/F 400/250/100/63 on D.P. along with HT/LT connections with copper L-piece. Complete in all respect,as per Resspo and Electrical Safety rule 70 Earthing of transformer body and neutral by lowering of chemical pipe/Rod (earthing)connecting with GI Strip of size 50x6 mm with clamps, all material will be provided by contractor as per Resspo and Electrical Safety rule 71 Erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type D/P formounting of T/Fs with all accessories like 11 kv fuse set, TPMO, top channel, grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per Resspo and Electrical Safety rule 72 All accessories like 11 kv fuse set, TPMO, top channel,on existing D/Pdone properly. all required material will be arranged by the contractor with one year gauranty as per Resspo and Electrical Safety rule, 73 Laying of single 11 KV, 3x185/3x120 sq mm XLPE cable Hanging/normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.) 74 Fixing ofHeat Shrink cable type end Terminations suitable for 11 KV, 3x185/3x120/3x70 sq mm XLPE cable and 11 KV 3x185/3x120/3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules. 75 Outdoor 76 Laying/hanging of following LT cable of different sizes for main/distribution/connecting the main cable from T/F to tailless unit and for distribution, from tailless unit to LT section Pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 77 1x400/240 sq. mm. 78 3 ½ 400/240 sq. mm. 79 3 ½x150 sq. mm. 80 Erection and grouting of LT Cubical Box, Making platform for stepping, plastering the same with cement sand in raio 1:6 Fising the tailless nit 500/300 Amp making LT Bus Bar and its taping. 81 Errection andFixing the tailless unit 500/300 Amp in existing LT cubical Box/Double pole making LT Bus Bar and its taping. 82 500 Amp. 83 300 Amp. 84 Errection&Commissioning of ACSR Weasl for neutral conductor in LT AB line with fixing of LT X-arm, LT shackle insulator, clamps etc. at existing LT pole as per Resspo and Electrical Safety rule 85 Errection&Commissioning of (3x120+1x195+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule 86 Dismantling of all the HT/LT line, connections & earthing of old 11/.4 kV,25/63/100/250/400/630 KVA transformer along with LT cubical box, cable GO set, DO set & T/F, safe loading carrage and unloading of dismentled item from site of work to center store Naini/Power House store/Dump site. 87 250 KVA 88 100 KVA 89 63 KVA 90 25 KVA 91 Laying/hanging of following LT cable of different sizes for main/distribution/connecting the main cable from T/F to tailless unit and for distribution, from tailless unit to LT section Pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil. 92 1x400/240 sq. mm. 93 3 ½ 400/240 sq. mm. 94 Errection andFixing the tailless unit 500 Amp in existing LT cubical Box/Double pole making LT Bus Bar and its taping. 95 Erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long STPfor LT line, including fixing of necessary clamps grouting in ratio1:4:8, cement, stone grit & coarse sand,plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long STPas per Resspo and Electrical Safety rule) 96 Errection & Commissioning of ACSR Weasl for neutral conductor in LT AB line with fixing of LT X-arm, LT shackle insulator, clamps etc. at existing LT pole as per Resspo and Electrical Safety rule 97 Errection&Commissioning of (3x120+1x195+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule 98 Errection & Commissioning of distribution boxes/kiosk on the LT poles including all clamps & materials required, connections & sealing its connection in between Distribution Box & ABC 1x35 sq. mm LT PVC cable (all required Local materialsincluding Distribution box arranged by the contractor as per Resspo and Electrical Safety rule) 99 Opeing from old line & Reconnection with New LT Line of Consumers service cable of three phase /single phase 100 Single Phase 101 Three Phase 102 Cartage of 11/9 Mtr STP from Store to dump store/work Site Including loading and unloading 103 Cartage of 400/250/100/63/25 kva Transformer from Store to dump store/work Site Including loading andunloading 104 Cartage of LT 1x400, 1x240, 3.5x400, 3.5x240 sqmm from Store to dump store/work Site Including loading and unloading 105 Cartage of 3X185, 3x120, 3x70 SQ MM xlpe 11 KV XPLE CABLE from Store to dump store/work Site Including loading and unloading 106 Cartage of LT ABC from Store to dump store/work Site Including loading and unloading 107 Cartage of ACSR Weasel conductor from Store to dump store/work Site Including loading and unloading 108 Other petty materials as conductor, cross arms, channels, angles, D.O. fuse set, TPMO, LT cubical box, clamps etc. 109 Cartage of 11 KV VCB from Store to dump store/work Site Including loading and unloading

Key Value

Document Fees
INR 10644 /-
EMD
INR 180400.0 /-
Tender Value
INR 90.20 Lakhs /-

BOQ Items

Name of Work:Supply of Material and works against system augmentation/strengthening works in different Districts Head on Semi Turn Key Basis in EUDD-Mayohall, Bamrauli & Tagore Town Under EUDC-II, Prayagraj.
Sl. No. Item Description
1SUPPLY OF MATERIALS (Part-A)
2Holding Clamp for Top Chanel (STP/PCC)
3Clamp distribution Box LT
4Suspension Clamp for ABC Cable
5Dead End Clamp for ABC Cable
6Stone Pad (300x300x75 MM)
7Earth wire clamp with bolts & nuts
8Bolts, Nut & Washer All size
9Control Cable 4x2.5 sqmm sizes
10Aluminium Crimping Lug 70sqmm
11Aluminium Crimping Lug 120 sqmm
12Aluminium Crimping Lug 240 sqmm
13Aluminium Crimping Lug 400 sqmm
14Aluminium Crimping Lug 630 sqmm
15LT Shackle Insulator
16Chemical Earthing Complete
17I- Hook
18PRC 120 Sqmm
19DD Wire PVC 70 Sqmm
20LT Cubical Box For Tailness Unit
21Tailness Unit 500 Amp
22Tailness Unit 300 Amp
23Copper Strip 50x6sqmm
24GI Strip 50x6
25U-Bolt with Nuts
26Copper L Piece 50x225x10 mm
27GI Pipe 6"
28MOUNTING, FITTING & ERECTION OF WORK AS PER RESPO NORM. (Part-B)
29Eerection, grouting, plinthing & earthings of 11 mtr double pole double support with fixing of necessary clamps and other accessories like channel,, angle iron etc.grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractor with one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.)
30Laying of single 11 KV, 3x120 sq mm XLPE cable Hanging method with help of stay wire/ normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.)
31Fixing ofHeat Shrink cable type end Terminations suitablefor 11 KV, 3x120 sq mm XLPE cable and 11 KV 3x185/3x120/3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules.
32Outdoor/indoor jointing kit
33Straight through jointing kit
34Hoisting of 11 KV 3x120 sq mm XLPE cableproviding GI pipe of size 6” dia 3 M long on double pole including its jumpering, complete with providing all required material arrange by contractor with one year gauranty asper Resspo and Electrical safety rules.
35Erection & commissioning of 11 KV VCBoutgoing/incoming/bus-coupler in the switch gear room, by grouting base channel 100 x 50 x 6 x 1000mm. Fixing of 11 KV switchgears rag bolt with proper connection, control cable provided by contractor. 11 KV VCB provided by Deptt.
36Safely Removing & carriage of 11 KV VCBoutgoing/incoming/bus-coupler from the old switch gear room including opening all connection,
37Laying of copper control cable form C.T. T/F to transformer control panel /protection Board. All control cable shall be supplied by the contractor.
38Eerection, grouting, plinthing & earthings of 11 mtr single supportwith fixing of necessary clamps and other accessories like M.S.channel,angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractorwith one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.)
39Spreading and stringing of 3 Phase 3 wire continuous conductor for 11 KV line including binding of insulator complete in all respect. The work includes jumpering/connecting of conductor at sectional poleas per Resspo and Electrical Safety rule
40ACSR weasel conductor
41Laying of single 11 KV, 3x70 sq mm XLPE cable Hanging method with help of stay wire/ normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.)
42Fixing ofHeat Shrink cable type end Terminations suitable RAYCHEM RPG make for 11 KV, 3x70 sq mm XLPE cable and 11 KV 3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules.
43Outdoor jointing kit
44Construction of 11/0.4 KV Transformer plinth in size 1.5x1.5x 1.8 mtr. Height, including 0.6 mtr. below G.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. Thickness of 1st class brick work should be 0.35 mtr. below G.L. and above G.L. It should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, The space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. The two channels should be grouted as per direction of site in charge. All the sides of wall above G, L. should be plastered by 1:6 cement sand mortar having 12 mm thickness.
45Providing and fixing of welded wire mesh fencing, around transformer plinth having one locking arrangements, Fencing should be provided by grouting MS angle 40x40x5 mm. length of 1.5 m. on all the sides as per standard practice and design. The painting of fencing should be done by good quality green paint with two coats after rubbing and cleaning and providing one coat red oxide primer. The fencing should be 2 M. above ground level. The rates should be inclusive of all materials required for completion of above work.
46Erection & commissioningof T/F 400/250/100 on D.P. along with HT/LT connections with copper L-piece. Complete in all respect,as per Resspo and Electrical Safety rule
47Earthing of transformer body and neutral by lowering of chemical pipe/Rod (earthing)connecting with GI Strip of size 50x6 mm with clamps, all material will be provided by contractor as per Resspo and Electrical Safety rule
48Erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type D/P formounting of T/Fs with all accessories like 11 kv fuse set, TPMO, top channel, grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per Resspo and Electrical Safety rule
49Eerection, grouting, plinthing & earthings of 11 mtr single supportwith fixing of necessary clamps and other accessories like M.S.channel,angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractorwith one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.)
50Eerection, grouting, plinthing & earthings of 11 mtr double pole double support with fixing of necessary clamps and other accessories like channel,, angle iron etc.grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing and all required material will be arranged by the contractor with one year gauranty as per Resspo and Electrical Safety rule,only S.T.Pole provided by Deptt.)
51Earthing of support/Pannel complete with the help of M.S. rod 16 mm dia and 2.5 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. (All material will be arranged by the contractor as per Resspo and Electrical Safety rule)
52Fixing & grouting of stay rod with cement, sand and bricks ballast in ratio !:4:8 and fasteniong the stay wire with pole and stay rod nozzling.(Grouting and all material will be arranged by the contractor with one year gauranty asper Resspo and Electrical safety rules.)
53Laying of single 11 KV, 3x185/3x120 sq mm XLPE cable Hanging/normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.)
54Fixing ofHeat Shrink cable type end Terminations suitable for 11 KV, 3x185/3x120/3x70 sq mm XLPE cable and 11 KV 3x185/3x120/3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules.
55Outdoor
56Laying/hanging of following LT cable of different sizes for main/distribution/connecting the main cable from T/F to tailless unit and for distribution, from tailless unit to LT section Pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil.
571x400/240 sq. mm.
583 ½ 400/240 sq. mm.
593 ½x150 sq. mm.
60Erection and grouting of LT Cubical Box, Making platform for stepping, plastering the same with cement sand in raio 1:6 Fising the tailless nit 500/300 Amp making LT Bus Bar and its taping.
61Errection andFixing the tailless unit 500/300 Amp in existing LT cubical Box/Double pole making LT Bus Bar and its taping.
62500 Amp.
63300 Amp.
64Erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long STPfor LT line, including fixing of necessary clamps grouting in ratio1:4:8, cement, stone grit & coarse sand,plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long STPas per Resspo and Electrical Safety rule)
65Errection&Commissioning of ACSR Weasl for neutral conductor in LT AB line with fixing of LT X-arm, LT shackle insulator, clamps etc. at existing LT pole as per Resspo and Electrical Safety rule
66Errection&Commissioning of (3x120+1x195+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule
67Errection & Commissioning of distribution boxes/kiosk on the LT poles including all clamps & materials required, connections & sealing its connection in between Distribution Box & ABC 1x35 sq. mm LT PVC cable (all required Local materialsincluding Distribution box arranged by the contractor as per Resspo and Electrical Safety rule)
68Construction of 11/0.4 KV Transformer plinth in size 1.5x1.5x 1.8 mtr. Height, including 0.6 mtr. below G.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. Thickness of 1st class brick work should be 0.35 mtr. below G.L. and above G.L. It should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, The space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. The two channels should be grouted as per direction of site in charge. All the sides of wall above G, L. should be plastered by 1:6 cement sand mortar having 12 mm thickness.
69Erection & commissioningof T/F 400/250/100/63 on D.P. along with HT/LT connections with copper L-piece. Complete in all respect,as per Resspo and Electrical Safety rule
70Earthing of transformer body and neutral by lowering of chemical pipe/Rod (earthing)connecting with GI Strip of size 50x6 mm with clamps, all material will be provided by contractor as per Resspo and Electrical Safety rule
71Erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type D/P formounting of T/Fs with all accessories like 11 kv fuse set, TPMO, top channel, grouting in ratio1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per Resspo and Electrical Safety rule
72All accessories like 11 kv fuse set, TPMO, top channel,on existing D/Pdone properly. all required material will be arranged by the contractor with one year gauranty as per Resspo and Electrical Safety rule,
73Laying of single 11 KV, 3x185/3x120 sq mm XLPE cable Hanging/normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.)
74Fixing ofHeat Shrink cable type end Terminations suitable for 11 KV, 3x185/3x120/3x70 sq mm XLPE cable and 11 KV 3x185/3x120/3x70 sq mmISI mark jointing kit will be arrange by the contractor with one year gauranty asper Resspo and Electrical safety rules.
75Outdoor
76Laying/hanging of following LT cable of different sizes for main/distribution/connecting the main cable from T/F to tailless unit and for distribution, from tailless unit to LT section Pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil.
771x400/240 sq. mm.
783 ½ 400/240 sq. mm.
793 ½x150 sq. mm.
80Erection and grouting of LT Cubical Box, Making platform for stepping, plastering the same with cement sand in raio 1:6 Fising the tailless nit 500/300 Amp making LT Bus Bar and its taping.
81Errection andFixing the tailless unit 500/300 Amp in existing LT cubical Box/Double pole making LT Bus Bar and its taping.
82500 Amp.
83300 Amp.
84Errection&Commissioning of ACSR Weasl for neutral conductor in LT AB line with fixing of LT X-arm, LT shackle insulator, clamps etc. at existing LT pole as per Resspo and Electrical Safety rule
85Errection&Commissioning of (3x120+1x195+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule
86Dismantling of all the HT/LT line, connections & earthing of old 11/.4 kV,25/63/100/250/400/630 KVA transformer along with LT cubical box, cable GO set, DO set & T/F, safe loading carrage and unloading of dismentled item from site of work to center store Naini/Power House store/Dump site.
87250 KVA
88100 KVA
8963 KVA
9025 KVA
91Laying/hanging of following LT cable of different sizes for main/distribution/connecting the main cable from T/F to tailless unit and for distribution, from tailless unit to LT section Pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil.
921x400/240 sq. mm.
933 ½ 400/240 sq. mm.
94Errection andFixing the tailless unit 500 Amp in existing LT cubical Box/Double pole making LT Bus Bar and its taping.
95Erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long STPfor LT line, including fixing of necessary clamps grouting in ratio1:4:8, cement, stone grit & coarse sand,plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long STPas per Resspo and Electrical Safety rule)
96Errection & Commissioning of ACSR Weasl for neutral conductor in LT AB line with fixing of LT X-arm, LT shackle insulator, clamps etc. at existing LT pole as per Resspo and Electrical Safety rule
97Errection&Commissioning of (3x120+1x195+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule
98Errection & Commissioning of distribution boxes/kiosk on the LT poles including all clamps & materials required, connections & sealing its connection in between Distribution Box & ABC 1x35 sq. mm LT PVC cable (all required Local materialsincluding Distribution box arranged by the contractor as per Resspo and Electrical Safety rule)
99Opeing from old line & Reconnection with New LT Line of Consumers service cable of three phase /single phase
100Single Phase
101Three Phase
102Cartage of 11/9 Mtr STP from Store to dump store/work Site Including loading and unloading
103Cartage of 400/250/100/63/25 kva Transformer from Store to dump store/work Site Including loading and unloading
104Cartage of LT 1x400, 1x240, 3.5x400, 3.5x240 sqmm from Store to dump store/work Site Including loading and unloading
105Cartage of 3X185, 3x120, 3x70 SQ MM xlpe 11 KV XPLE CABLE from Store to dump store/work Site Including loading and unloading
106Cartage of LT ABC from Store to dump store/work Site Including loading and unloading
107Cartage of ACSR Weasel conductor from Store to dump store/work Site Including loading and unloading
108Other petty materials as conductor, cross arms, channels, angles, D.O. fuse set, TPMO, LT cubical box, clamps etc.
109Cartage of 11 KV VCB from Store to dump store/work Site Including loading and unloading
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail