}

Tender For Work Of Summation Metering And Control Cable Of Adani C 20 1A 10 Sector 62 Under Eudd Vii Noida, noida-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Work Of Summation Metering And Control Cable Of Adani C 20 1A 10 Sector 62 Under Eudd Vii Noida. Submission Date for this Tender is 09-10-2023. Control Cable Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39708867
Corrigendum : Tender For Work Of Summation Metering And Control Cable Of Adani C 20 1A 10 Sector 62 Under Eudd Vii Noida
Tender
Indian
Uttar Pradesh
Noida
09-10-2023

Tender Details

Carrying Out The Work Of Summation Meter ( 02 Nos. ) And 02 Core 2.5 Sq.Mm. Sheated Control Cable ( 700 Mtrs. ) And Other Related Work ( Supply & Installation ) For Electricity Connection Of Consumer M / S Adani Enterprises Ltd., C-20 / 1A / 10, Sector-62, Noida ( Total Load 81000 Kva ) ( First Phase 25 Mva To Be Release Till Month December 2023 ) In Full Deposit Scheme In Area Of Eudsd-Xiii, Noida Under Eudd-Vii, Noida In The Juridiction Of Eudc-I, Noida ( All Type Labour And Material Will Be Providing By The Contractor At His Own Cost On Time ) .

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 04-10-2023 Date Extension 9 Date 09-10-2023
2 21-09-2023 Date Extension 7 Date 26-09-2023
3 26-09-2023 Date Extension 8 Date 04-10-2023

Key Value

Document Fees
INR 3540 /-
EMD
INR 42480.0 /-
Tender Value
INR 36 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail