Tata Memorial Centre has published Tender For Biennial Contract For Operation And Comprehensive Maintenance Of 180Kld Sewage Treatment Plant (Stp) And 30 Kld Effluent Treatment Plant (Etp) And Associated Works In Homi Bhabha Cancer Hospital And Research Centre Aganumpudi, Visakhapatna. Submission Date for this Tender is 29-09-2023. Effluent Treatment Plant Tenders in visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Sep-2023 | Corrigendum - 1 | Other | 29-09-2023 |
Sl. No. | Item Description |
1 | PART - A : PLANT OPERATION & ASSOCIATED WORK |
2 | Operation of 180 KLD MBBR technology based sewage treatment plant (STP), 30 KLD Effluent Treatment Plant along with Delay Tanks & Collection wells at Homi bhabha cancer hospital & research center visakhapatnam in daily three shifts i.e 24x7x730 days basis for twelve months as per schedule. The Item Includes Manpower (2 Mechanic+3 Operator+1 Helper cum Safiawala with suitable avaliable of reliver) Chemicals etc.Please refer the Clause no-1 of Schedule I of technical Specifications for detailed scope of the Item. |
3 | PART - B : COMPREHENSIVE MAINTENANCE & ASSOCIATED WORKS |
4 | Comprehensive maintenance of pump sets as per clause no. 3 of schedule I of Specifications. |
5 | STP - Raw sewage transfer pumps (2 Nos x 4 times in one year ) |
6 | STP - Anoxic tank recirculation pumps (2 Nos x 4 times in one year ) |
7 | STP - Sludge transfer pump (2 Nos x 4 times in one year ) |
8 | STP - Filter press Feedpumps (Screw Pump) (2 Nos x 4 times in one year ) |
9 | STP - poly Dosing pump (2Nos x 4 times in one year ) |
10 | STP - Hypo Dosing pump (2Nos x4 times in one year ) |
11 | STP - Filter feed pumps (2Nos x 4 times in one year ) |
12 | STP - Treated Water pumps (Gardening) (3Nos x 4 times in one year ) |
13 | STP - Dewatering pump (1Nos x 4 times in one year ) |
14 | ETP - SMFT Feed pumps (2 Nos x4 times in one year ) |
15 | ETP - Sludge Transfer pumps (2 Nos x4 times in one year ) |
16 | ETP - Filter press Feedpumps (Screw Pump) (2 Nos x 4 times in one year ) |
17 | ETP - Treated effluent transfer pump (2 Nos x 4 times in one year ) |
18 | ETP - NAOH Dosing pump (2 Nos x4 times in one year ) |
19 | ETP - Alum Dosing pump (2 Nos x4 times in one year ) |
20 | ETP - Poly Dosing pump (4 Nos x4 times in one year ) |
21 | Transfer pumps for delay tank (2 Nos x4 times in one year) |
22 | Raw effluent transfer pumps at collection Well (4 Nos x 4 times in one year) |
23 | Comprehensive maintenance of Air Blowers as per clause no. 4 of schedule I of Specifications. |
24 | Air blowers for Equalization tank, FAB reactor tank and Sludge Holding Tank(2Nos x 4 times in one year ) - STP |
25 | Air blowers for Equilisation tank & Sludge holding tanks (2Nos x 4 times in one year) - ETP |
26 | Comprehensive maintenance of Air Diffusion system of Different Capacitiesas per clause no. 5 of schedule I of Specifications. (Tank cleaning will be measured & paid seperately). |
27 | Air Diffsuion system for Equilization Tank & sludge Holding Tank (Type of diffuser: Coarse type & Air flow rate : 6 - 8 m3 / hr, Pressure Rating : HDPE/UPVC - 10 kg / cm2 , size of diffuser : 90 mm dia MOC : EPDM)(1No x 4 times in one year) - STP |
28 | Air Diffsuion system for FAB Reactor Tank (Type of diffuser: Fine Bubble type & Air flow rate : 10 - 12 m3 / hr, Pressure Rating : HDPE/UPVC-10 kg / cm2 , size of diffuser : 90 mm dia & MOC : EPDM)(1No x 4 times in one year) -STP |
29 | Air Diffsuion system for Equilization Tank & sludge Holding Tank (1No x 4 times in one year) ( Coarse type & Air flow rate : 4 - 6 m3 / hr, Pressure Rating : HDPE/UPVC - 10 kg / cm2 , size of diffuser : 90 mm dia & MOC : EPDM) - ETP |
30 | Comprehensive maintenance of Filter Press as per clause no. 6 of schedule I of Specifications. |
31 | Filter press (1No x 4 times in one year) - STP |
32 | Filter press (1No x 4 times in one year ) - ETP |
33 | Comprehensive maintenance of Ozonator as per clause no. 7 of schedule I of Specifications. |
34 | Ozonator System and its accessories (1Nos x 4 times in one year) |
35 | Comprehensive maintenance of (UV) Ultraviolet light as per clause no. 8 of schedule I of Specifications. |
36 | Ultraviolet light (1Nos x 4 times in one year) |
37 | Multi Grade Filter & Activated carbon filter and associated works as per clause no. 9 of schedule I of Specifications. |
38 | Multi Grade filter (1Nos x 4 times in one year ) |
39 | Activated carbon filter (1Nos x 4 times in one year ) |
40 | Comprehensive maintenance of Agitators (Including Motors and all its accessories & Fittings) of different Capacities. |
41 | Anoxic Tank Agitator (1No x 4 times in one year)- STP |
42 | NaOH Dosing system Agitator (1No x 4 times in one year)- ETP |
43 | Alum Dosing system Agitator (1No x 4 times in one year) - ETP |
44 | Poly Dosing system Agitator (2No x 4 times in one year) - ETP |
45 | Poly Dosing system Agitator (2No x 4 times in one year) - ETP |
46 | Comprehensive maintenance of Filtration Unit of Armas VH-070 (1No x 4 times in one year) |
47 | Comprehensive maintenance of ELECTROMAGNETIC ONLINE DIGITAL FLOW METER of Flowtech Make with model FMIPL-EMFM-F-C-PL-EL1-AC1-M-I-040. (3Nos x 4 times in one year). Which includes Calibiration, Repair/Replacement. |
48 | Comprehensive maintenance of ONLINE PH ELECTRODE WITH DIGITAL INDICATOR of Forbes Marshall Make. (3Nos x 4 times in one year). Which includes Calibiration, Repair/Replacement. |
49 | PART - C : ASSOCIATED WORKS |
50 | Carring out calibration of various pressure gauges through accredited laboratory including making proper setting for with in range indication if required & submitting its original calibration certificate having one year"s validity before due date complete as per site requirment |
51 | Collection of Samples (Total 5 Samples - STP Inlet & Outlet, ETP Inlet & Outlet & at Delay tank/or as specified by EIC) from site on monthly basis, delivery and testing of same at NABL accredited lab. Sample testing includes the parameters like PH, COD, BOD,TSS Oil & grease, Dissolved oxygen (D.O), Chloride & Sulphate. Submission of its originaltest report before 1st week each next month as per instruction and as directed by engineer in charge. Note: Sealed container for sample collection is in scope of contractor. |
52 | Carrying out complete cleaning of followingRCC Tanks by removing all existing excretal, Sewage, Sludge debries muddy water etc. Complete by mechanical /manual means and disposal of the same including making required pumping arrangement, lifting, loading, unloading transportation traking all safety precautions removing and refixing of bar screens carrying out all related works etc. complete as per site requirment and as directed by engineer in charge. |
53 | STP - Bar screen Chamber (RCC Chamber - 1.5x0.5x3.3M) - Quarterly |
54 | STP - Oil and grease trap (RCC Chamber - 5.3x1.5x3.3M) - Quaterly |
55 | STP - Equalization Tank (RCC Chamber - 6.0x4.2x5.25M) - Half Yearly |
56 | STP - Anoxic Tank (RCC Chamber - 2.8x2.5x2.5M) - Half Yearly |
57 | STP - FAB reactor Tank (RCC chamber - 2.8x2.8x5.0M) - Half Yearly |
58 | STP - Tube settler Tank (RCC Chamber -2.8x2.4x3.20M) - Half Yearly |
59 | STP - Chlorine Contact Tank (RCC Chamber - 2.8x1.1x1.7M) - Quarterly |
60 | STP - Filter Feed Tank (RCC Chamber - 2.8x1.3x1.7M &5.5x2.6x2.5M) - Quaterly |
61 | STP - Treated Water Tank (RCC Chamber - 5.5x7.4x2.5M) - Trimester |
62 | STP - Sludge Holding Tank (RCC Chamber - 2.8x2.0x2.5M) - Trimester |
63 | ETP - Bar screen Chamber (RCC Chamber - 1.5x0.5x0.5M) - Quaterly |
64 | ETP - Equalization Tank (RCC Chamber - 1.7x1.5x2.0M) - Half Yearly |
65 | ETP - Treated Water Tank (RCC Chamber - 2.8x2.0x2.5M) - Trimester |
66 | ETP - Sludge Holding Tank (RCC Chamber - 2.8x2.0x2.5M) - Trimester |
67 | Collection wells at RT Block (RCC Chamber - 1.5x1.5x1.55M) - Half Yearly |
68 | Collection well at Hosp Block (RCC Chamber - 6.4x2.6x3.5M) - Quaterly |
69 | Delay Tanks (RCC Chamber - 2.5x2.0x1.8M) - Trimester |
70 | Carrying out complete comprehensive maintainance including cleaning of lamella clarfier with flocculator & Tube settler with inclined plate mechanism and attending all noticed issues/deficiencies in all respect including supply & fixing of all required materials/spares/hardwares, carrying out repair or replacement of all worn out / damaged parts /inclined FRP plates, carrying out all related works etc. complete as per site requirement. This work includes to carry out complete cleaning of tank to replace damaged FRP plates by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical manual means and disposal of the same including making required pumping arrangement, lifting, loading, unloading, transportation. taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C.(Half Yearly) |
71 | Supply, installation, testing & commissioning of following items for Ultra voilet light system (1 No) as directed & as per instruction of EIC. (Make: - M/s Alpha UV make , model no. HF6-HD |
72 | Ballast-270104006 |
73 | UV lamp-270134027 |
74 | Quartz Sleeve |
75 | Supply, filling, setting, testing & commissioning of all required medias in appropriate quantum in Activated Carbon Filter of size 1.6m (D) x 1.875 (H) of STP adopting standard practices / OEM recommendations including removal of all old medias, cleaning, supply & fixing of all required hardwares / spares, disposal of all old medias, carrying out all related works etc. complete as per site requirement. Please refer clause no. 10 of schdule I of specifications for details. (Yearly Once) |
76 | Supply, filling, setting, testing & commissioning of all required medias in appropriate quantum in Multi Grade Filter of size 1.2m (D) x 1.875 (H) of STP adopting standard practices / OEM recommendations including removal of all old medias, cleaning, supply & fixing of all required hardwares / spares, disposal of all old medias, carrying out all related works etc, complete as per site requirement. Please refer clause no. 11 of schdule I of specifications for details. (Yearly Once) |
77 | Preparing & Submitting the Half-yearly Compliance Report as per the Conditions (Which include as Quaterly Testing of Ambient Air Quality Monitoring (PM10,PM2.5,SO2,Nox etc.,), Stack Emissions of DG Set (2 Nos) (SPM,SO2,Nox, Metals, etc), Noise Monitoring (Day & Night), Inlet & Outlet Parameters of STP&ETP, Bio Assay Test (90% survival of fish after 96 hours in 100% effluent) etc.,) as per Consent for Establishment (CFE), Consent for operation (CFO) and Environmental Clearance (EC) to Andhra Pradesh Pollution Control Board (APPCB)/CPCB through offline/online. The Bidder Should Submit the Compliance reports audited by through NABL accredited third party. |
78 | Fabrication of Sign Board made up of structural steel sections of Box sections for Legs, Angles for Supports & Plate for Display Board of 6" x 4" with indicating the products, effluent discharge standards, air emission standards, hazardous waste quantities and validity of CFO etc., including the scope of Civil works such as excavation, concreting, finishing & Painting etc., complete in all respect. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy