Rajasthan State Road Development And Construction Corporation Limited has published Tender For Supply, Installation, Testing, Commissioning Of Sub-Station Work At New Pg Hostel Building (For Increase In Pg Seats) At Umaid Hospital Campus, Jodhpur.. Submission Date for this Tender is 21-09-2023. Substation Tenders in jodhpur Rajasthan. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply installation testing & Commissioning of Copper wound distribution Transformerof following ratingand % Impedance, 11/0.433KV Delta-Star Connected, Vector Group Dyn 11, ONAN Cooledlosses as per IS 1180 part I 2014 (Fourth Revision) Level-1, with boltless core designincluding standardaccessories like conservator with prismaticoillevelgauge , silica gel breather,Bucholz relay,pressed steel radiator fins, Radiator Valve(above 800 Kva) Suitable size HT cable box,LT cable box with Busbar connection for outgoing cables, Off -LTC (+/- 2.5%, +/- 5% to - 7.5% ),temperature rise of 40 degree C in oil / 45 degree C in winding , drain valve, Air release device,Dial type Oil & Winding Temperature gauge with alarm & trip contacts, first filling of transformer oil as per IS :335-1953 , Epoxy primer and PU based paint as Top coat, Unidirectional rollers for rating upto 800 kva & bi- directionalabove 800 Kva rollers with locking arrangement etc. as required. The Transformer shall be subjected to routine factory tests (as per IS:2026 and IS:1180) including Temperature rise test inOEM"s own lab shall be witnessed by Department engineer Physically. |
2 | Transformer shall be tested from CTLof discombefore charging of transformer & complete installaion must be certified from Electrical Inspectorate office as per Indian Electricity rule, (CTL testing charges and Electrical Inspection charges shall be reimbursed by the department to the contractor)Following tests shall be carried out on each transformer at site by OEM enginer in presence of department authorised representative:- a) Ratio test on each tapping.b) Resistance of windings at principal and all tapings.c) Insulation resistance of the winding between HV to earth / HV to LV / LV to earth.d) Vector group test.e) Magnetic Balance test. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR . |
3 | 1000 KVA with % Impedance 5.0 |
4 | SITC of 11kV 630 Amps 21KA for 3 Sec. SF6 insulated, outdoor duty (IP54) , Extensible / Non extensible typeRing main unit (RMU)manually operated in combination ofVCB modules andLoad Break switch consisting of Copper busbar in SF6 insulated 304 (Non-Ferrite Non-Magnetic Grade) stainless steel enclosure of thickness 2.5mm with manometer.The HV switchgear and control gear should be confirming to IEC-62271-100, IEC-62271-200-2003 & IEC-60694-1996. The RMU should be internal arc tested for 21KA for 1Second with IAC-AFL classification for gas tank. Vacum Interrupter of VCB should be RMU Manufacturer’s own make.Each feeder of RMU should have voltage presence indicator. . and compring offollowings:- 1 no. microprocessor based Self powered numerical relay with over Current/ earth fault & short circuit protection with each VCB feeder. - 3 Nos. Protection CT shall be of Burden 2.5VA, ratio 50/1A, Class of Accuracy class 5P10for O/C and E/F protection for each VCB.- 1 No. Manometer for each tank,- 1 nos. Fault Passage indicator,-Right angle boots for all the feeder ModulesAll the type test certificates as per IEC from Third partyNABL / CPRI / ERDA accrediated lab to be submitted. (Cost of RCC Foundation / Steel Structure to be paid Extra) All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR |
5 | Non Extensible 3 way RMU with 1 no. VCB & 2 No. Load Break Switch |
6 | SITC of Radiator Cooled and Turbo charged Silent DG Set (As per latest CPCB emissionnorms) havingspecifications as per A, B, C, D, E, F,G,H & I |
7 | A) 1500 RPM Diesel Engine conforming to BS:649/5514 of suitable BHP(up to 82.5 kVA 6 cylinder or Below required, 125 kVA & Above ratings 6 cylinder or aboverequired ) capable of taking 10% over loading for one hour after 12 hours of continuous operation.,Dry exhaust mainfold with Hospital grade silencer and catalytic convertor(isolated from main DG chamber),up to 3 M exhaust piping (with LRB insulation & Alum. cladding ) as required . |
8 | B)AC Brush less SPDP Alternator conform to BS 5000 (part 99) or IS/IEC 60034-1. . Alternator shall be self regulated with standard Alternator Protection( Over voltage , over speed & under voltage, under speed warning & shutdown).Engine & Alternator mounted on a common base Frame & coupled through a flexible coupling or close coupled |
9 | C) CPCB / ARAI approved Standard canopy with Weatherproof, powdercoated Accoustic enclosure for DG set for sound attenuation fabricated from 1.6 mm CRCA sheet steel (structure) with sidewall fabricated from 1.6 mm CRCA sheet & filled with glasswool (96Kg/m3) / Foam. as per IS8183 the doors of 28/40/50/85mm thick as perrating and fabricated from 1.6mm CRCA sheet packed with accoustic material, All doors/opening are sealed with neoprene /EPDNgaskets. The DG Set has Inbuilt / External in fuel tank to run 6 to 8 Hrs as per OEM standard, with protection and tripping of DG set against temperature of more than 50 degree centigrade. |
10 | D) Electronic / Mechanical governor, Manual & electric Start ,Batteries with battry charger,Engine instruments panel,AVM pads All controls for operation of DG set are from outside the enclosure with DG control panel having Microprocessor based Genset monitoring like Running Hour, RPM, Low Lube Oil tripping & control system, Panel mounted MCCB/ACB of suitable rating, Ammeter, Voltmeter, PF meter, frequency meter, KWH meter,digital fuel display meter, Ind.lamps etc. mounted inside enclosure , visible and accessible from outside. The enclosure should be suitable for following capacity DG sets and alternator. Noise level shall be less than 75 dB at a distance of 1 Mtrs. duly certified by authorised agency etc. complete in all respect of following capacity : |
11 | E) (i) Accoustic glass wool wall thickness should not be less then 40mm and not less then 20mm PU foam upto rating 100 KVA. (ii).Accoustic glass wool wall thickness should not be less then 65mm and not less then 50mm PU foam upto rating 250 KVA. (iii)Accoustic glass wool wall thickness should not be less then 100mm forrating above 250 KVA. |
12 | F) First filling of the fuel tank shall be done by contractor and the prevailing fuel cost at that time shall be reimbursed to the contactor by department. |
13 | G) Servicing Contract of DG Set from OEM"s Authorised Service Dealer as per OEM guidelines during the DLP period shall be done by contractor including all consumables, actual charges shall be reimbursed to the contractor by End User Department. |
14 | H) Manufacturer / OEM must have its authorized service dealer in Rajasthan. Which can provide service within 6 Hours of compalint registration. |
15 | I) DG set will be offered for Inspection and Testing at Manufacturer"s Works in presence of Departmental Engineers. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR . |
16 | 160 KVA at 0.8 pf 415V 50Hz 3-? |
17 | Providing & Laying XLPE insulated three core ArmouredAluminiumcable for working voltage 11 K.V.(E) confirming IS :7098 P - 2withH4- Grade electrolyticaluminium conductor confirming to IS: 8130 class-2 of purity >99.6 %, Insulation Screening: Extruded Semiconducting Compound followed by helically wrapped Copper Tape, round / flat strip armouring of cables , Inner / outer sheath PVC type ST-2 confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray includingtesting etc. as required of following size. OEM must have it"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810 All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR . |
18 | 3 core 300.0 Sq.mm |
19 | Providing & making heat shrinkable type indoor/outdoor/straight through terminations/ joint kitsuitable for11 KV / 33 KV (Earthed) cable with required components, prepration of cable ends. Type test report should be as per IS13573:2011 which covered all sequence for table 2 for termination kit and table 3 for streightthrough joint inclusive thermal & dynamic short circuit test, humidity test, soil fog test. Crosslinking shall be done out side factory with E- beam/ peroxide technology. Extrusion process shall be in house OEM within same vicinity. includingtesting etc. as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR . |
20 | 11 KV End Termination Kit Indoor type |
21 | 3 core 240/300 Sq.mm |
22 | 11 KV End Termination Kit Outdoor type |
23 | 3 core 240/300 Sq.mm |
24 | Providing & Fixing of Vertical(BEE 5 star rated) / Horizontal( BEE 3 star rated) storage water heater with outer casing made of Engineering Plastic sheet (Upto 25 Ltr) / Metal rust proof Body (35 & 50 Ltr), Glass - line / Titanium Enamel coated Pressure Pump Compatible 8 bar pressure Inner tank, Glass Line Coated , mineral filled heating element, stem type, snap actionadjustable thermostat , Dual indicating lampsInjected PUF insulation, Multi Function Valve etc. as required held in position with 2/4 no. 10/12 mm anchor Fastener, duly wired with 3 core 2.5/4.0 Sqmm PVC insulated & sheathed copper conductor and 16 A/25A three pin plug top with Portable Residual Current Device ( PRCD ) , including making inlet, outlet Flexible alloyconnection, testing etc. as required. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure "A" attached with this BSR . |
25 | 15 Ltr. |
26 | 25 Ltr. |