| 1 | The Work for verious system improvement / strengthening works in municipal area under UEDD-V, Varanasi |
| 2 | Stay clamp for ST Pole with N&B |
| 3 | LT. clamp for STP/PCC with N&B |
| 4 | LT Shackle Insulator |
| 5 | Loop/Stay Insulator |
| 6 | MS X-arm Clamp for STP 9/11 mtr |
| 7 | Eye bolt |
| 8 | T/F base clamp with N&B |
| 9 | P.G. Clamp for Panther |
| 10 | Isolator clamp for Panther |
| 11 | Cable holding clamp |
| 12 | holding clamp for GI Pipe |
| 13 | HDPE pipe 110mm |
| 14 | GI pipe 100mm |
| 15 | M.S. Nut & Bolts off size |
| 16 | Dead end clamp with eye hook |
| 17 | Suspension clamp with eye hook |
| 18 | clamp for Eye hook with N&B |
| 19 | LT Cable S/C 1x35 sq mm |
| 20 | LT Distribution Box with clamp and N&B |
| 21 | LT Insulated piercing clamp for enagiging D/B |
| 22 | LT bare netural connector ( P.G. Clamp) |
| 23 | Allu Lug for 95 sq.mm |
| 24 | Allu. Lugs for 400 sq mm |
| 25 | Allu. Lugs for 630 sq mm |
| 26 | Allu. Lugs for 50 sq mm |
| 27 | Allu. Lugs for 1000 sq mm |
| 28 | Cost of copper Z clamp for 250 KVA T/F with nut bolt & washer |
| 29 | Cost of copper Z clamp for 400 KVA T/F with nut bolt & washer |
| 30 | Cost of copper Z clamp for 630 KVA T/F with nut bolt & washer |
| 31 | 4x2.5 mm sq copper control cable |
| 32 | 2x2.5 mm sq copper control cable |
| 33 | 6x2.5 mm sq copper control cable |
| 34 | Supply and errection of LT MCCB 800 Amp. |
| 35 | Supply and errection of LT MCCB 400 Amp. |
| 36 | Supply and errection of LT MCCB 250 Amp. |
| 37 | Supply and errection of LT MCCB 100 Amp. |
| 38 | Supply and errection of LT Distribution paneel type A-2 |
| 39 | Supply and errection of LT Feeder Piller |
| 40 | Supply and errection of LT Service Piller |
| 41 | Replacement/addition of LT Poles in Line |
| 42 | Carriage of S.T. Pole 9 mtr / PCC pole 8.5 mtr fromstore to site with loading & unloading |
| 43 | Dismantling of Old & Damaged pole 9/PCC pole 8.5 meter long after dismentling of cond. & accessories from line and its proper steking . |
| 44 | Erection grouting & plinthing of New 9/PCC pole 8.5meter long including fixing of accessories and resagging & stringing of old conductor on re-errected pole. |
| 45 | Fitting of Earthing rod |
| 46 | Carriage of Damaged / dismentilled pole from dumping store to Raja Talab store with loading & Unloading |
| 47 | Grouting of Stay, nozelling & fixing of stay wire etc. |
| 48 | Guarding of HT Lines |
| 49 | Labour charge for Laying and stringing of two nos GI wire with Lacing and binding |
| 50 | Fabrication and fixing of fitting |
| 51 | Carriage of material from store to work site including loading and unloading. |
| 52 | A. Replacement/addition of Poles in H.T Line 33KV or 11KV |
| 53 | Carriage of S.T. Pole 11 mtrfromstore to site with loading & unloading |
| 54 | Dismantling of Old & Damaged pole 11 meter long after dismentling of cond. & accessories from line and its proper steking . |
| 55 | Erection grouting & plinthing of New 11 meter long including fixing of accessories and resagging & stringing of old conductor on re-errected pole. |
| 56 | Fitting of Earthing rod |
| 57 | Carriage of Damaged / dismentilled pole from dumping store to Raja Talab store with loading & Unloading |
| 58 | Grouting of Stay, nozelling & fixing of stay wire etc. |
| 59 | Bifurcation of 11 KV overloaded feeders* |
| 60 | Loading unloading & carriage ofConductor, Earth rod, Stay set, G.I. wire, Angle, Channel etcfrom Raja Talab central store to site |
| 61 | Loading unloading & carriage of STP 11 Mtr longfrom Raja Talab central store to site |
| 62 | Loading unloading & carriage of 11 KV Cable, from Raja Talab central store to site |
| 63 | Erection grouting of 11 mtr D/P with fitting of all accessories including in cost of grouting material |
| 64 | Grouting & Nozzling of Stay including cost of Grouting material. |
| 65 | Laying & Dressing of U/G11 KV 3x185 sq mm XLPE cableD/C after digging of roadincluding in cost of brick, Patiya & sand and C.I. Pipe required of Road X-ing as per NORMS |
| 66 | Laying & Dressing of U/G11 KV 3x185 sq mm XLPE cable through HDD Methode required of Road X-ing as per NORMS |
| 67 | Laying, testing & commissioning of 11 KV 3x185sq mm XLPE cable D/C (2X100Mtr) inHDPE Pipe after supply & laying of d/c HDPE pipe (2x50mtr) of 200 mm dai by Horrizontal drilling mathod with drilling machine the pipe shall be leid at the2.5 mtr deep below railway track. Sp. Earthing of D/P on Both side as per NORMS .G.I.Pipe of size 4\" dia 3 mtr long, suitable clamp & Nut Bolts fixing of all accessoriesandearthing material etc. |
| 68 | Documentation charge for Railway X-ing |
| 69 | Earthing of Pole by earthing rod |
| 70 | Fitting of Cable Marker with cost of Cable Marker |
| 71 | Jointing of 11 KV O/D H.S. J. Kit for 3x185 sq mm XLPE cable |
| 72 | Jointing of 11 KV S/T H.S. J. Kit for 3x185 sq mm XLPE cable |
| 73 | Hoisting of 11 KV 3x185 sq mm cable on Double Pole through G.I.Pipe of size 6\" dia, 3 mtr long including its jumpring complete |
| 74 | Painting of STP 11 Mtr & fitting with 01 coat red oxide & 02 coat Allu. Paints after prepartion of sulface including cost of material |
| 75 | Additional LT Circuits* |
| 76 | Cartage of following material from Raja ka Talab Storeto site including loading & unloading |
| 77 | Cartage of ABC Size(3x120+1x95+1x16)sqmm and Other material as per estimate |
| 78 | Cartage of S T Pole 9 meterlong from Storeto site including loading & unloading |
| 79 | Errection, grouting & plinthing of STP 9 Mtr including cost of grouting material |
| 80 | Erection & commissioning of (3x120) and 3x95 sq mm XLPE ABC with All accessories Dead end clamps, Suspension clamps, LT Cable S/C, Connector such as Clamp for pole and Eye Hook etc |
| 81 | Grouting of stay it nozelling fixing of stay wire complete including cost of grauting Material |
| 82 | Fixing of Dist. Boxes on LT Pole including all clamps and material for mounting, connection & sealing |
| 83 | Connection of Consumer service cable hrough distribution boxes after commissioning of ABC line. |
| 84 | Earthing of pole by earth rod |
| 85 | Painting of STP 11 mtr & fitting with one coat of Red-Oxide Post Man colour & two coat Al. Paints including cost of materials |
| 86 | Increasing Capacity of Distribution Transformers from 63/100 to 250 KVA |
| 87 | Loading unloading & carriage of 250 KVA T/F from Raja Talab central store to site |
| 88 | Loading unloading & carriage of Other Material from Raja Talab central store to site |
| 89 | Dismentaling of old 100 KVA T/F and shuifting from work site to store including loading and unloadiung. |
| 90 | Errection & mounting of new 250 KVA T/F on existing D/P and making connection and jumpring by Laying of LT Cable |
| 91 | Sp. Earthing of 250 KVA T/F Netural or Body sepertaly Chemical pipe and connection with G.I. Strip off size 30x5 mm including cost of material |
| 92 | Increasing Capacity of Distribution Transformers from 250 to 400 KVA |
| 93 | Loading unloading & carriage of 400 KVA T/Fand other material from Raja Talab central store to site |
| 94 | Dismentaling of old 250 KVA T/F and shuifting from work site to store including loading and unloadiung. |
| 95 | Errection & mounting of new 400 KVA T/F on existing D/P and making connection and jumpring by Laying of LT Cable |
| 96 | Sp. Earthing of 400 KVA T/F Netural or Body sepertaly Chemical pipe and connection with G.I. Strip off size 30x5 mm including cost of material |
| 97 | Increasing Capacity of Distribution Transformers from 400/630 to Add. 250KVA |
| 98 | Loading unloading & carriage of 250 KVA T/F from Raja Talab central store to site |
| 99 | Loading unloading & carriage of 9/11 Mtr ST Pole from Raja Talab central store to site |
| 100 | Loading unloading & carriage of condusctor, ABC Size (3x120+1x95+1x16) sq mm ,MS Channel, Angle, Disc, Pin, Earthing & Decentralised Materials from Raja Talab central store to site |
| 101 | Erection of D.P including grouting and plinthing of pole fitting fixing of S/S Base of M.S. Angle/Channel, fixing of all accessories |
| 102 | Laying and sagging of weasel for 11Kv line |
| 103 | Errection & mounting of250 KVA T/F on D/P and making connection and jumpring. |
| 104 | Erection & commissioning of (3x120+1x95+1x16)sq mm XLPE ABC with All accessories Dead end clamps, Fixing of Dist. Boxes Suspension clamps, such as Clamp for pole and Eye Hook etc. |
| 105 | Errection of earthing rod |
| 106 | Fitting & fixing of LT bus bar |
| 107 | Painting of STP 9/11 mtr & fitting with one coat of Red-Oxide Post Man colour & two coat Al. Paints including cost of materials |
| 108 | Sp. Earthing of 250 KVA T/F Netural & Body sepertaly with Chemical pipe and connection with G.I. Strip off size 30x5 mm including cost of material |
| 109 | Replacement of Components in 33/11 kV SS |
| 110 | Loading unloading & carriage of all required materials includingCT, Isolators,CRP,33kv vcb & Decentralised material etc. fromstore to site |
| 111 | Erection,connection,Fitting and testing of 33 KV Isolator |
| 112 | Erection,connection,Fitting and testing of 33 KV lightening Arresters |
| 113 | Erection,connection,Fitting and testing of 33 kv CT |
| 114 | Erection,connection,Fitting and testing of 33KV PT |
| 115 | Erection,connection,Fitting and testing of 33 KV VCB 800A ,750MVA WITH STRUCTURE |
| 116 | Errection of 24 Volt battery and charger including all connection |
| 117 | Laying of control cable in switch yard and making all connections |
| 118 | Earthing of all equipment with earth strip |
| 119 | Earthing of DistributionTransfomers (chemical earthing) |
| 120 | Sp. Type earthing of Distribution transformer for Neutral or Body of diffrent capacity by Providing ans fixing of Chemical pipe and connectiom with the help of GI Strip 30x5 mm duly galvanized shall be used. Every DT shall have to such earthing one earthing for T/F Body and Second for Neutral both these points shall be connected to earth through GI strip (30x5 mm) separately. All required materials shall be supplied by the contractor. |
| 121 | Requirement of Mobile Distribution Transformer with Trolley* |
| 122 | Providing and fixing of movable trolly for 630 KVA Distribution transformer complete in all respect |
| 123 | Loading unloading & carriage of 630 KVA T/F from Raja Talab central store to site |
| 124 | Errection & mounting of 630 KVA T/F on new trolly and making connection and jumpring by Laying of LT Cable |
| 125 | Strengthening of L.T Line |
| 126 | Loading unloading & carriage of all materialfrom Raja Talab central store to dump store anddump store to site |
| 127 | Fabrication of LT Bus Bar and fixing on existing DP then Bus Bar with ACSR Dog conductor |
| 128 | Fabrication of Areal Fuse unit and fixing on Bus Bar then making all LT circuit connection complete |
| 129 | Errection of LT Distribution Piller, Feeder Piller and Service piller alog with grouting and connection |
| 130 | Earthing of all LT Pannel |
| 131 | Strengthening of 33KV U/G Line |
| 132 | Loading unloading & carriage of 33 KV Cable, from Raja Talab central store to site |
| 133 | Laying & Dressing of U/G 33 KV 3x300 sq mm XLPE cable after digging of roadincluding in cost of brick, Patiya & sand and C.I. Pipe required of Road X-ing as per NORMS |
| 134 | Jointing of 33 KV O/D H.S. J. Kit for 3x300 sq mm XLPE cable |
| 135 | Hoisting of 33 KV 3x300 sq mm cable on Double Pole through G.I.Pipe of size 6\" dia, 3 mtr long including its jumpring complete |
| 136 | Inc. Capacity of 33/11KV S/S - 1 nos |
| 137 | Loading unloading & carriage of all required materials includingCT, Isolators,Structures, M.S. Channel, Angle, CRP,11kv vcb,33kv vcb & Decentralised material etc. from Raja Talab central store to dump store anddump store to site |
| 138 | Grouting, Errection of following structure and fitting with mounting of equipments. Complete in all respect. |
| 139 | 33 KV Isolator |
| 140 | 33 KV lightening Arresters |
| 141 | 33 KV Post Insulator |
| 142 | 33 kv CT |
| 143 | Errection of plinth & foundation of power T/F Plinth including cost of material 3.5x3.5x1.5 m as per standred. |
| 144 | Errection and commissioning of 10MVA transformer on plinth and fixing of all accessories along with Top up of transformer oil complete in all respect. |
| 145 | Plinth & foundation of 33 KV VCB/ Pannel and plinth of operation in S.yard with material |
| 146 | Laying and connection of control cable 4x2.5 sq mm, 2x2.5 sq mm & 6x2.5 sq mm from switchyard to control Pannel in Control Room including construction of trench and providing stone cover with materail |
| 147 | Laying of 11 KV cable 3x300 sq mm XLPE cable with brick, stone & sandincluding hanging of cable. |
| 148 | Installation of 11 KV switch gear & control panel in control Room complete work including |
| 149 | Jointing ofOut Door/ In Door 11 KV 3x300 XLPE cable box. Including cost of jointing box |
| 150 | Febrication & Fitting fixing and grouting of cable stand with grouting material etc |
| 151 | Earthing of indoor equipment including cost of material complete as per desing prescribed by RESSPO. |
| 152 | Earthing of Outdoor equipment including cost of material complete as per desing prescribed by RESSPO. |
| 153 | Errection of Rail Double pole along with grouting and plinthing for Bus Bar |
| 154 | Dismentling of existing Bus bar and Shifting to new Double pole after fabrication and fixing of fitting |
| 155 | Construction Pakka cable trench of 2\"x2\" with cover for 11KV existing cable Laying |
| 156 | Excavation of earth and removal of existing cable then Laying of cable into pakka cable trench |
| 157 | Painting of All structure 01 Coat red-Oxide & 2 Coat Paint of good quality including material. |
| 158 | Leveling of switchyard & laying of stone blast in S-yard As Per Norms |
| 159 | Construction of Path way & lighting of Switchyard complete with cost of material |
| 160 | Febracation & fixing of fire stand with 04 No fire bucket |
| 161 | Sp. Pipe earthing of Power T/F Nutral & Body Seperatewith 60\" deep G.I. pipe 40 mm dia including material |