Tender For Construction Of P.C.C Road From P.Wd. Road Upto The Railway Station In Karanpura Village And G.P. Block - Taljhari , Dist- Sbg
Tender Value
24.72 Lakhs
Estimated cost
Bid Submission
20 Sep 2023
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
karanpura → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Construction Of P.C.C Road From P.Wd. Road Upto The Railway Station In Karanpura Village And G.P. Block - Taljhari , Dist- Sbg
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Sep-2023 | BID OPENING DATE AND DOCUMENT DOWNLOAD AND SALE DATE CAHNGE | Date | 21-Sep-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | EARTHWORK IN EXCAVATION IN FOUNDATION TRENCHESIN ORDINARY SOIL ( VIDE CLASSIFICATION OF SOIL ITEM _ A ) AND DISPOSAL OF EXCAVATED EARTH AS ABTAINED TO A DISTANCE UPTO 50 M. INCLUDING ALL LIFTS, LEVELLING, RAMMING THE FOUNDATION TRENCHES , REMOVING ROOTS OF TREES, SHURBS ALL COMPLETE AS PER APPROVED DESIGN . BUILDING SPECIFICATION AND DIRECTION OF E/I OREXTRA OF EARTHWORK IN HARD SOIL AS PER SPECIFICATIONAND DIRECTION OF ( VIDE CLASSIFICATION OF SOIL ITEM _ B) |
| 2 | PROVIDING COARSE CLEAN SAND IN FILLING IN FOUNDATION TRENCHES OR IN PLINTH INCLUDING RAMMING AND WATERING IN LAYERS NOT EXCEEDING 150MM THICK WITH ALL LEADS AND LIFTS INCLUDING COST OF ALL MATERIALS , LABOUR , ROYALTY AND TAXES ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I (MODE OF MEASUREMENT COMPLETED VOLUME ) |
| 3 | SUPPLYING AND LAYING ( PROPERLY AS PER DESIGN AND DRAWING ) RIP RAP WITH GOOD QUALITY OF BOULDERS DULY PACKED INCLUDING THE COST OF MATERIALS ROYLTY ALL TAXES ETC. BUT EXCLUDING THE COST OF CARRIAGE ALL COMPLETE AS PER SPECIFICATION AND DRIECTION OF E/I. |
| 4 | PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------ |
| 5 | PROVIDING RANDOM RUBBLE STONE MASONRY IN C.M (1:4) IN FOUNDATIONAND PLINTH WITH HAMMER DRESSED STONE OF LESS THAN 0.03 M3 IN VOLUME AND CLEAN COARESE SAND OF F.M 2 TO 2.5INCLUDING COST OF SCREENING , RAKING OUT JOINTS TO 20MM DEPTH CURING TAXES AND ROYALY ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I |
| 6 | PROVIDING RANDOM RUBBLE STONE MASONRY IN CEMENT MORTAR (1:4) IN SUPERSTRUCTUR - DO -- INCLUDING COST OF SCREENING OF MATERIALS SCAFFOLDING , RAKING OUT JOINTS TO 20MM DEPTH - DO -- |
| 7 | REINFORCED CEMENT CONCRETE WORK IN WALLS. (ANY THICKNESS) INCLUDING ATTACHED PILASTERS, BUTTERSSES ,PLINTH AND STRING COURSES ,FILLETS, COLUMNS, PILLARS ,PIERS, ABUTMENTS , POSTS, AND STRUTS ETC ABOUT PLINTH LEVEL UP TO FLOOR FIVE LEVEL EXCLUDING COST OF CENTRING SHUTTERING FINISHING AND REINFORCEMENT |
| 8 | PROVIDING P.C.C.M 200 IN NOMINAL MIX OF (1:1.5:3) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------ |
| 9 | PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------ |
| 10 | PROVIDING TOR STELL REINFORCEMENT OF 20MM,25MM,28MM,32MM, DIA BARS AS PER APPROVED DESIGN AND DRAWING -DO - |
| 11 | PROVIDING 25 MM THEEK CEMENT PLASTER (1:4) RED CLEAN COURSE SEND AAP FM 1.5 INCLUDING SCREENING CURING WITH ALL LEADS AND LIFTS OF WATER SCAFFOLDING TAXES AND ROYALTY ALL COMPLETE AS PER BUILDINGS SPECIFICATIONS AND DIRECTION OF E/I |
| 12 | DEWATING DURING CONST |
| 13 | CARRIAGE COST OF CEMENT LEAD FROM 6+1 KM |
| 14 | CARRIAGE COST OF STONE CHIPS LEAD FROM 7+1KM |
| 15 | CARRIAGE COST OF STONE BOULDER LEAD FROM 7+1 KM |
| 16 | CARRIAGE COST OF SAND LEAD FROM 44+1 KM |
| 17 | CARRIAGE COST OFROD LEAD FROM 6+1 KM |
| 18 | SITE CLERANCE |
| 19 | STONE CRUSHER DUST FINER THAN 3MM WITH NOT MORE THAN 10% PASSING 0.075 SIEVE QUARRY |
| 20 | SUPPLYING AND LAYING ( PROPERLY AS PER DESIGN AND DRAWING ) RIP RAP WITH GOOD QUALITY OF BOULDERS DULY PACKED INCLUDING THE COST OF MATERIALS ROYLTY ALL TAXES ETC. BUT EXCLUDING THE COST OF CARRIAGE ALL COMPLETE AS PER SPECIFICATION AND DRIECTION OF E/I. |
| 21 | PROVIDING P.C.C.M 200 IN NOMINAL MIX OF (1:1.5:3) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ----- |
| 22 | FILLING IN FOUNDATION TRENCHES AND PLENTH IN LAYERS NOT EXCEEDING 150MM . THICK WELL WATYERED RAMMED FULLY COMPACTED AND FINE DRESSED WITH EARTH OBTAINED FROM EXCAVATION OF FOUNDATION TRENCHES WITHIN A LEAD OF 50M AND LIFT OF 1.5M ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I (MODE OF MEASUREMENT COMPACTED VOLUME) |
| 23 | CARRIAGE COST OF CEMENT LEAD FROM 6+1 KM |
| 24 | CARRIAGE COST OF STONE CHIPS LEAD FROM 7+1KM |
| 25 | CARRIAGE COST OF STONE BOULDER LEAD FROM 7+1 KM |
| 26 | CARRIAGE COSTOF SAND LEAD FROM 44+1 KM |
| 27 | CARRIAGE COST OF DUST LEAD FROM 7+1 KM |
| 28 | add 18 % GST |
| 29 | add S/B & PHOTOGRAPHY |
| 30 | add 1 % labour cess |
AI Tender Summary
Tender Timeline
Sep 13, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedSep 20, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 23, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer