Water Resources Department-WRD has published Tender For Construction Of Cabin For Security Guard Near Head Regulator And Entrance Gate At Gavnem Dam In V.P. Gaondongrem In Canacona Taluka. Submission Date for this Tender is 10-10-2023. Cabin Tenders in South Goa Goa. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Sep-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 02-10-2023 |
2 | 02-Oct-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 07-10-2023 |
3 | 07-Oct-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 10-10-2023 |
Sl. No. | Item Description |
1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq. m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in a)All kinds of soil. |
2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in : a)All works upto plinth level |
4 | Exposed decorative laterite masonry using Patradevi stone of size as specified and laid as directed by architect in cement mortar 1:4 (1 cement : 4 coarse sand). |
5 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge |
6 | Centering & shuttering including Strutting, Propping & removal of forms for :i)Foundations, Footings, Bases for columns. |
7 | iv) Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth. |
8 | xiii)Suspended floors, roofs landings, shelves & their supports |
9 | Centering & shuttering including Strutting, Propping & removal of forms for sloping or battering surface (slabs, beams, louvers, etc) including folded plates.iii) Columns, Pillars, Posts & struts (circular or curved in plan) |
10 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size)a)All works upto plinth level |
11 | b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level |
12 | Reinforced cement concrete work 1:11/2:3 (1 cement: 11/2 coarse sand: 3 granitic or basaltic stone aggregate 20mm nominal size excluding plastering and cost of centering, shuttering & reinforcement, in sloping or battering surface (slabs, beams, louvers, etc) i)Where inclination to the horizontal does not exceed 30° |
13 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) )(Confirming to IS 1786 of 1986)for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floorsalongwith the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. |
14 | Applying cement slurry on RCC slab on cement concrete work using 2.75kgs of cement per sq. m for receiving cement concrete floor including roughening, cleaning, etc complete. |
15 | Providing and fixing M.S. grill of required pattern in wooden frames of Windows etc. with M.S. flats square or round bars with round headed bolts and nuts or byscrews .a)Plain grill |
16 | Providing woodwork in frames of doors, windows, clerestory windows trusses & other frames wrought framed and fixed in position. b)Second class Indian teak wood |
17 | Providing and fixing 35 mm thick panelled glazed or panelled and glazed shutters for doors, windows and clerestory window including anodized aluminium butt hinges with necessary screws: ( b)Second class Indian teak wood |
18 | Providing flat iron hold fast 40 cm including fixing to frame with 10 mm dia bolts, nuts and wooden plugs and embeded in cement concrete block 30 x 10 x 15 cm 1:3:6 mix (1 cement: 3 coarse sand: 6 stone aggregate 20 mm nominal size.A)40 x 3 mm flat iron hold fast, 15 cm long. |
19 | 6mm cement plaster to ceiling 1: 4 (1 cement : 4 fine sand) |
20 | Providing and and laying vitrified floor tiles in different sizes of Johnson, So many, Kajaria(thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approvedmake in colours and shades as specified laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand) including grouting the joints with white cement and matching pigment etc., complete a)600x 600 mm Dark Shades |
21 | Providing and fixing vitrified antiskid tiles (320x320) and 10mm thick tiles in floor, treads of steps, landing on 25mm thick bed ofcement mortar 1:3 and jointed with cement slurry complete. |
22 | Providing and applying white cement based putty of average thickness 1.00mm of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete |
23 | Applying priming coat with ready mixed primer of approved brand and manufacture on steel work. |
24 | Polishing on wood work with ready made superior quality wax polish of approved brand and manufacture on new work. |
25 | Painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade. |
26 | Providing and fixing anodized aluminum shutters in accordance with the specification annexed with Goa schedule of Rates (2004) Vol & II including all taxes, transportation, scaffolding and handling etc. complete as per direction of the Engineer-in-charge: windows with two sliding shutters using 18 mm series shutters section.A)Plain glass Extra for powder coating with pure polyster powder of shade of required colour on the alluminium section. |
27 | Applying one coat of distemper primer of approved brand and manufacture on wall surface. |
28 | Wall painting (two or more coats) with plastic emulsion paint of approved brand and manufacture on new work to give an even shade. |
29 | Varnishing (two or more coats) with copal varnish of approved brand and manufacture on new work including an under coat Bees waxing on wood work with local made wax polish in proportion of 2:1 5:1 0.5 (2 wax: 1.5 linseed oil: a)With glue sizing |
30 | Providing and fixing bright finished brass tower bolts (barrel type) with screws etc. complete a)250 x 10 mm |
31 | Providing and fixing bright finished brass handles with necessary screws etc complete. a)125mm |
32 | Providing and fixing bright finished brass door latch with necessary screws etc complete.A)300x 16 x 5 mm |
33 | Providing and fixing chromium plated brass sliding door bolt with bolts, nuts and screws etc. complete.A)300 x 16 mm |
34 | Providing and fixing chromium plated brass butt hinges with necessary screws etc. complete. A)125 x 70 x 4.0mm (ordinary type) |
35 | Providing and fixing 150 mm. bright finished brass floor door stopper with rubber cushion screws etc. to suit shutter thickness complete. |
36 | Providing and fixing in position S.S. hand rail in main stair case, and landing as per approved design shown in the drawing including bending handrail pipe to proper shape in curves with specials, etc. complete. |
37 | Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineer, of approved brand and manufacture, diluted with solvent mineral Turpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the exposed laterite masonry surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer. (The rate is inclusive of all materials & labours). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy