Work Of 11 Kv / Lt Line/ Vcb/ Transformer Construction/Installation In Edsd – I Prahupark In The Edd,Kasganj Under The Juridiction Of Edc, Kasganj On Semi Turn-Key Basis., kasganj-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Work Of 11 Kv / Lt Line/ Vcb/ Transformer Construction/Installation In Edsd – I Prahupark In The Edd,Kasganj Under The Juridiction Of Edc, Kasganj On Semi Turn-Key Basis.. Submission Date for this Tender is 22-09-2023. Electrification Work Tenders in kasganj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39618319
Corrigendum : Work Of 11 Kv / Lt Line/ Vcb/ Transformer Construction/Installation In Edsd – I Prahupark In The Edd,Kasganj Under The Juridiction Of Edc, Kasganj On Semi Turn-Key Basis.
Open Tender
Indian
Uttar Pradesh
kasganj
22-09-2023

Tender Details

Work Of 11 Kv / Lt Line / Vcb / Transformer Construction / Installation In Edsd – I Prahupark In The Edd, Kasganj Under The Juridiction Of Edc, Kasganj On Semi Turn-Key Basis.- 1 Supply Of Material 2 Stone Pad 3 Stay Rod Complete 4 Earthing Rod Complete 5 Holding Clamp 6 F Clamp For Stp 7 Concreating Of Stay 8 Clamp With N & B For Guarding 9 Danger Board With Clamp 10 Gi Pipe 6 Dia 11 T Off Channel 12 Cross Brassing Set For Section Pole 13 M.S. Guarding Angel 14 G.I. Wire 8 Swg / 06 Swg 15 Stay Wire 16 Ms Top Channel 17 Cabel Jointing Kit 11 Kv 3X120 Sqmm I / D 18 Cabel Jointing Kit 11 Kv 3X120 Sqmm O / D 19 Cabel Jointing Kit 11 Kv 3X300 Sqmm I / D 20 Cabel Jointing Kit 11 Kv 3X300 Sqmm O / D 21 4 Core L.T. Mcb With Box L.S. 22 140 Mm O / D Pn 4 Pe 80 Grade Uvstblised Hdpe Pipe In 6 Mtr 23 Number Of Plate 24 Red Oxide Paint 25 Alluminimum Paint 26 Barbed Wire G.I. 27 Nut & Bolt Off Size 28 Irag Bolt 29 Ms Dropper Channel 30 Lt Pvc Cable 3.5X150 / 70 Sqmm. 31 Copper I-Piece 50X225x10mm 32 Copper L-Piece62x225x12mm 33 Lt Pvc Cable Al. 3.5X400sqmm. 34 Lt Pvc Cable Al.1X400sqmm. 35 Lt Pvc Cable Al.1X240sqmm. 36 Al Leg Long Barrel Off Size L.S. 37 Erection Of Material 38 Fabrication Of Structure With All Materialof Plinth & Foundation Of10 Mva Transformer In All Respect At VendorS Cost. 39 Laying Of 140 Mm O / D Pn 4 Pe 80 Grade Uvstblised Hdpe Pipe In 6 Mtr 40 Erection & Installation Of 11 Kv Vcb Outgoing Ctr 200 / 100 / 5A , 350 Mva 41 Installation Of 11 Kv / 33 / 11 Kv Jointing Kit Indoor / Outdoors 3X120 / 185 / 3X300 Sq Mm. 42 Laying & Fixing Of 11 Kv Xlpe Cable 3X120 Sqmm. ( Spare Also ) 43 Laying & Fixing Of 11 / 33 Kv Xlpe Cable 3X300 Sqmm. 44 Fixing Of Guarding Angel 45 Laying / Fixing Of Copper I-Piece 50X225x10mm 46 Laying / Fixing Of Copper L-Piece62x225x12mm 47 Laying / Fixing Of Lt Pvc Cable Al. 3.5X400sqmm. 48 Laying / Fixing Of Lt Pvc Cable Al.1X400sqmm. 49 Laying / Fixing Oflt Pvc Cable Al.1X240sqmm. 50 Laying / Fixing Of Al Leg Long Barrel Off Size L.S. 51 Laying / Fixing Of 4 Core L.T. Mcb With Box L.S. 52 Erection Of Single Support Including Complete H.T / L.T Fittings S.T. Pole 11 Mtr. Sp-55 Including Earthing, Grouting & Muffing Of Pole. 53 Fixing Of Danger Board 54 Erection Of Stay Set Complete Including The Work Of Nuzzling Etc. 55 Laying Sagging Stringing, Binding And Jumpering Acsr Weasel Conductor 56 Laying & Fixing Of Lt Pvc Cable Al. 3.5X150 / 70 Sqmm. 57 Painting Of St Pole With Red Oxide & Ailunimum Paintas Per Respo Norms 58 Fixing Of Barbed Wire G.I. 59 Fixing Of G.I. Wire 8 Swg / 06 Swg 60 Connecting Ht Cabel Connection From 33 Kv Side & 11 Kv Side Of 10 Mva Power Transformer 61 Water Level Earthing By Boring And Lowering Of G.I. Pipe Size 40 Mm Dia & Thickness 2 Mm Into The Ground At 20 Mtr Depth Or Upto The Water Level With The Lower End Of Solid Copper Cone Approx 225 Mm Long And 750 Gm In Weight Shall Be Provided And Screwed In Pipe As Well As Bringing Out A Continuous Copper Wire 6 Swg From The Cone Up To The Ground Surface Where It Will Be Bolted To The M.S. Earth Strip For Transformer Body & Neutral Connection, The Earth Strip Will Be Welded To The G.I. Pipe And Neutral Earthing Support. All Required Material Provided / Supply By The Contractor Own His Cost. 62 Making Of M.S. Angle Ladder Type Frame Of Angle ( 75X75x8mm ) & Gi Strip ( 50X6mm ) Near Power Transformer For Power Cable With Concreting Of The Same In The Ground And Proper Clamping ( 50X6mm ) Of The Same With Transformer Cable. 63 Making Of M.S. Angle Frame Of ( 75X75x8mm ) In L Shape To Connect T / F Neutral By Flexible Copper Strip Including Cost Of Copper Strip & Wll Be Connected To Newly Constructed Well Type Earthing For Power T / F Neutral As Per Respo Norms. 64 Dismentaling & Shifting Of 5 Mva Power Transformer Switchyard To Out Side Boundary 65 Underground Railway Crossing Permission Fees

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Sep-2023 Date Extension Date 20-09-2023
2 20-Sep-2023 DATE EXTENSION(2) Date 22-09-2023

Key Value

Document Fees
INR 3540 /-
EMD
INR 100000.0 /-
Tender Value
Refer document

BOQ Items

Name of Works :The Work of 11 KV / LT Line/ VCB/ T/F Construction/Installation in EDSD – I Prahupark in the EDD,kasganj under the juridiction of EDC, Kasganj on Semi Turn-Key Basis.
Sl. No. Item Description
1Supply Of Material
2Stone Pad
3Stay Rod Complete
4Earthing Rod Complete
5Holding Clamp
6F Clamp for STP
7Concreating of Stay
8Clamp with N & B for guarding
9Danger Board with clamp
10GI Pipe "6" Dia
11T off Channel
12Cross Brassing Set for section pole
13M.S. Guarding Angel
14G.I. Wire 8 SWG/ 06 SWG
15Stay Wire
16MS Top Channel
17Cabel Jointing Kit 11 KV 3x120 sqmm I/D
18Cabel Jointing Kit 11 KV 3x120 sqmm O/D
19Cabel Jointing Kit 11 KV 3x300 sqmm I/D
20Cabel Jointing Kit 11 KV 3x300 sqmm O/D
214 Core L.T. MCB with Box L.S.
22140 mm O/D PN 4 PE 80 Grade UVStblised HDPE Pipe in 6 mtr
23Number of Plate
24Red Oxide Paint
25Alluminimum Paint
26Barbed Wire G.I.
27Nut & Bolt off size
28Irag Bolt
29MS Dropper Channel
30LT PVC Cable 3.5x150/70 sqmm.
31Copper I-Piece 50x225x10mm
32Copper L-Piece62x225x12mm
33LT PVC Cable Al. 3.5x400sqmm.
34LT PVC Cable Al.1x400sqmm.
35LT PVC Cable Al.1x240sqmm.
36AL Leg Long Barrel off size L.S.
37Erection of Material
38Fabrication of structure with all materialof Plinth & foundation of10 MVA Transformer in all respect at Vendor"s cost.
39Laying of 140 mm O/D PN 4 PE 80 Grade UVStblised HDPE Pipe in 6 mtr
40Erection & Installation of 11 KV VCB outgoing CTR 200/100/5A , 350 MVA
41Installation of 11 kv/ 33/11 KV jointing kit indoor /outdoors 3x120/185/ 3x300 Sq mm.
42Laying & Fixing of 11 KV XLPE Cable 3x120 sqmm. (spare Also)
43Laying & Fixing of 11/33 KV XLPE Cable 3x300 sqmm.
44Fixing of Guarding Angel
45Laying/ Fixing of Copper I-Piece 50x225x10mm
46Laying/ Fixing of Copper L-Piece62x225x12mm
47Laying/ Fixing of LT PVC Cable Al. 3.5x400sqmm.
48Laying/ Fixing of LT PVC Cable Al.1x400sqmm.
49Laying/ Fixing ofLT PVC Cable Al.1x240sqmm.
50Laying/ Fixing of AL Leg Long Barrel off size L.S.
51Laying/ Fixing of 4 Core L.T. MCB with Box L.S.
52Erection of single support including complete H.T/L.T fittings S.T. Pole 11 Mtr. SP-55 including Earthing, Grouting & Muffing of pole.
53Fixing Of Danger board
54Erection of stay set complete including the work of nuzzling etc.
55Laying sagging stringing, binding and jumpering ACSR Weasel conductor
56Laying & Fixing of LT PVC Cable Al. 3.5x150/70 sqmm.
57Painting of ST Pole with red oxide & ailunimum paintas per RESPO norms
58Fixing of Barbed Wire G.I.
59Fixing of G.I. Wire 8 SWG/ 06 SWG
60Connecting HT Cabel connection from 33 kv side & 11 KV side of 10 MVA Power Transformer
61Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2 mm into the ground at 20 mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer body & neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support. All required material provided/ supply by the contractor own his cost.
62Making of M.S. Angle Ladder type frame of Angle (75x75x8mm) & GI Strip (50x6mm) near power transformer for power cable with concreting of the same in the ground and proper clamping (50x6mm) of the same with transformer cable.
63Making of M.S. Angle frame of (75x75x8mm) in L shape to connect T/F Neutral by flexible copper strip including cost of copper strip & wll be connected to newly constructed well type earthing for Power T/F Neutral as per RESPO norms.
64dismentaling & shifting of 5 MVA power transformer Switchyard to out side Boundary
65Underground Railway Crossing Permission Fees
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail