Uttarakhand Jal Vidyut Nigam Limited-UJVN has published Consultancy Services For Detailed Civil Design And Engineering Including Project Monitoring And Quality Control Of Sirkari Bhyol Rupsiabagar Hydro Electric Project ( 120Mw ) On River Goriganga In District Pithoragarh, Uttarakhand. Submission Date for this Tender is 30-11-2023. Hydro Power Plants Tenders in pithoragarh Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 13-Oct-2023 | DateExtension1 | Date | 20-11-2023 |
2 | 26-Oct-2023 | pre bid queries replies | Other | 20-11-2023 |
3 | 26-Oct-2023 | Corrigendum01 | Technical Bid | 20-11-2023 |
4 | 06-Nov-2023 | Corrigendum 2 | Technical Bid | 20-11-2023 |
5 | 16-Nov-2023 | Date extension 02 | Date | 30-11-2023 |
6 | 17-Nov-2023 | Corrigendum no. 3 | Technical Bid | 30-11-2023 |
Sl. No. | Item Description |
1 | PART-A (Pre-Construction Stage Consultancy) Submission of Inception Report/Design Review Report, Visit of Expert to site ,Review of Additional Investigation if carried out /Submission of Draft design/ Design Intent memorandum, Preparation of tender document for Civil works including tender level design & drawings, technical specifications, detailed bill of quantities (BoQ) etc., Preparation of tender document for HM works including tender design & drawings, technical specifications, detailed bill of quantities (BoQ) etc. of the HM components for the entire project.(For details, refer relevant clause of Appendix-I) |
2 | PART-B-1 (Construction Stage Consultancy) Submission of Draft design / Carrying out Model Studies. Submission of Draft Drawings / Model Studies report for approval of Client / Issue of excavation and other drawings as required for Main construction/ Q.A. plan / Design / Drawings etc. Issue of Final Detailed Construction Drawing as per construction schedule / Visit of expert at site as and when necessary up to final construction drawing approvalstage. Review of the drawings for the HM contractor as and when received and approved thereof. Deploymentof Design Coordinator for Co-ordination between Civil / HM and E&M works and on spot revision of drawings during execution of Civil and HM works. Preparation of O&M manual, Preparation of as executed drawings. (For details, refer relevant clause of Appendix-I) |
3 | PART-B-2 (Project Monitoring & QualityControl Services)Project Monitoring &Quality Control Services at site for Civil & HM works for the entire project area of activity (For details refer relevant clause of Appendix-I) |
4 | Team Leader/Coordinator |
5 | Quality Control Engineer |
6 | Field Engineers (Civil) |
7 | Surveyor |
8 | Geologist |
9 | Field Engineers (HM) |
10 | HSE expert |
11 | Draftsman (Auto cad Operator) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail