Power Boards / Undertakings / PSU Closing in 0 days TDR #39595059

Overhauling Of Steam And Water Analysis System (Swas), Gas Analysers, C&I Equipment’S Of Chemical Dosing System, Olctc System, Cems & Eqms, C&I Equipment’S And Plc Installed At Bop Area

Issued by Boards / Undertakings / PSU · parichha, Uttar Pradesh
Tender Value
9.89 Lakhs
Estimated cost
Bid Submission
05 Oct 2023
0 days left
EMD
15000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
parichha → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Overhauling Of Steam And Water Analysis System ( Swas ) , Gas Analysers, C&I Equipment’S Of Chemical Dosing System, Olctc System, Cems & Eqms, C&I Equipment’S And Plc Installed At Bop Area--A:- Overhauling Of Steam And Water Analysis System ( Swas ) , Gas Analyzers And C&I Equipment’S Of Chemical Dosing System 2 A-1:- Steam & Water Analysis System 3 Sample Cooler 4 Rota Meter 30 Lph 5 Regulating Valve / Pressure Relief Valve 6 Solenoid Valve 7 Temperature And Pressure Gauges 8 Temperature And Pressure Switches 9 ½ Inch Sample & Cooling Isolating Valve 10 2Nb Isolating Valve 11 Coolant Flow Indicator 12 Sample Filter 13 3-Way Valve Ball 14 S.S. Tubing’S, Connectors, Fittings And Wiring Etc. Of Primary, Secondary Rack And Wet Panel 15 Cation Exchange Column 16 Conductivity Cell, Ph Electrode And Do2 Sensor 17 Ph / Conductivity Flow Through Chamber 18 Ph, Conductivity And Do2analyzer / Transmitter 19 Cutting / Welding, Replacement, Revisioning Of High Pressure Valve ( 12Mm To 25Mm ) 20 Repairing / Replacement Of Ss Impulse Line By Cutting And Welding Workasand When Required 21 A-2:- Gas Analyzer: 22 Oxygen Analyzer 23 Converter Unit 24 Detector Unit 25 Calibration Unit 26 Hydrogen Purity Analyzer 27 Transmitter / Receiver Unit 28 Calibration Unit 29 A-3:- Hydrazine, Phosphate & Ammonia Dosing System:- 30 Control Panel Equipment 31 Temp / Pressure Gauges 32 Level Switches 33 Level Gauge 34 A-4:- Painting With Primer Of Swas Primary / Secondarywet And Dry Panels, Pipes, Racks, Chiller Unit, Rotameters And Chemical Dosing Panel / Equipment’S 35 Job-B:- Overhauling Of Olctc System 36 Overhauling / Servicing Of Olctc System Arrangement A&B Of Unit No.4 Of 2X210 Mw, Ptpp, Parichha As Per Detailed Scope Of Work Sl. No. 1 To 6 37 Overhauling Of Motorized Actuator With Motor Of Screen Separating. Rating 0.55 Kw As Per Detailed Scope Of Work Sl. No. 07 38 Overhauling Of Motorized Actuator With Motor Of Ball Circulation Rating 0.045 Kw As Per Detailed Scope Of Work Sl. No. 07 39 Overhauling, Servicing And Reconditioning Of Plc System, Moulded Case Circuit Breaker With All It Supporting Circuitry And C&I Equipment’S. 40 Spares Required For Above Overhauling Work 41 Gland Packing 42 Sleeve Shaft 43 Impeller Gasket-Ptfe 44 Deflector 45 Lip Seal I.B 46 Lip Seal O.B 47 Adapter ‘O’ Ring ( 2K & 3K ) 48 Cover Gasket- Ptfe 49 Spare Seal Kit For Ball Valves Make Microfinish, Body Seat: Ptfe, Body Seal: Ptfe, Stem Seal: Ptfe, Stem Washer: Gft Of Size: 25 ( 1” ) Mm, Size: 50 ( 2” ) Mm And Size: 80 ( 3” ) Mm 50 Coupling 110 For Pump 51 L.B. Bearing-6310 Make Skf 52 O.B. Bearing-3310 Make Skf 53 Job C:- Overhauling Ofcems And Eqms System 54 Overhauling Ofcems And Eqms System As Per Details And Scope Of Work Ofjob-C 55 Job- D:- Overhauling Of Field C&I Equipments Installed In Common Facility Plants ( Bop ) Of 2X210 Mw, Ptpp, Parichha 56 Pressure / Temperature Gauges And Switches- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, Recalibration & Recommissioning Of 57 Pressure / Temp. Gauges 58 Pressure / Temp. Switches 59 Transmitter, Recorder, Indicators And Electronic Card & Modules Etc.- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Spare Parts, Recalibration & Recommissioning 60 Pressure, Flow & Level Tr. 61 Indicator 62 Recorder 63 Electronic Regulator For Air Compressor 64 Energy Saver For Air Compressor 65 Temp. / Pr. Transducer - Disconnection, Cleaning, Checking, Repairing, Reconditioning & Recommissioning 66 Level Gauges, Level Switches & Level Indicator- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, Recalibration & Recommissioning 67 Level Gauge ( Float Type ) 68 Level Switch ( Conductivity Type ) 69 Level Switch ( Reflex Type ) 70 Level Switch ( Ext. Cagetype ) 71 Level Switch ( Floattype ) 72 Level Gauge ( Reflextype ) 73 Rotameter- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, &Re-Commissioning 74 Pneumatic / Electrical Actuator And Valve- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts & Recommissioning 75 Pneumatic Actuator 76 Electrical Actuator 77 Solenoid Valves And Ewd ( Electronic Water Drain ) - Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts & Recommissioning Of 78 Solenoid Valve 79 Elect. Water Drain ( Ewd ) 80 Analyzer And Dew Point Indicator- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, Recalibration & Re-Commissioning Of 81 Ph Analyzer 82 Conductivity Analyzer 83 Silica Analyzer 84 Do2 Analyzer 85 Isolating, Drain Valve And Manifold Etc.- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement& Re-Commissioning 86 Cleaning, Nomenclature & Spray Painting Of Electrical & Pneumatic Actuators. 87 Cleaning And Spray Painting Ofcontrol Panels / Desk 88 Job- E: Overhaulingand Reconditioning Ofplc System And Logic Control Circuit And Its Module / Equipment’S / Panel Of Dm Plant And Raw Water Plantof 2X210 Mw, Ptpp, Parichha 89 Overhaulingand Reconditioning Of Plc System Andits Electronic Cords / Module / Peripherals Of Dm Plant. 90 Overhauling And Reconditioning Of Logic Control Circuit And Its Equipment’S / Panel Ofraw Water Plant

BOQ

Name of Work: Overhauling of Steam and Water Analysis system (SWAS), Gas analysers, C&I equipment’s of Chemical Dosing system, OLCTC System, CEMS & EQMS, C&I equipment’s and PLC installed at BOP area
Sl. No. Item Description
1Job-A:- Overhauling of Steam and Water Analysis system (SWAS), Gas analyzers and C&I equipment’s of Chemical Dosing system
2A-1:- Steam & Water analysis system
3Sample cooler
4Rota meter 30 LPH
5Regulating valve/Pressure relief valve
6Solenoid valve
7Temperature and pressure gauges
8Temperature and pressure Switches
9½ inch sample & cooling isolating valve
102NB isolating valve
11Coolant flow indicator
12Sample filter
133-way valve ball
14S.S. Tubing’s, connectors, fittings and wiring etc. of primary, secondary rack and wet panel
15Cation Exchange column
16Conductivity cell, pH electrode and Do2 sensor
17pH/Conductivity flow through chamber
18pH, Conductivity and Do2Analyzer/Transmitter
19Cutting/Welding, Replacement, Revisioning of High Pressure Valve (12mm to 25mm)
20Repairing/Replacement of SS impulse line by cutting and Welding workasand when required
21A-2:- Gas Analyzer:
22Oxygen Analyzer
23Converter unit
24Detector unit
25Calibration unit
26Hydrogen purity analyzer
27Transmitter/receiver unit
28Calibration unit
29A-3:- Hydrazine, Phosphate & Ammonia Dosing system:-
30Control panel equipment
31Temp/Pressure Gauges
32Level switches
33Level gauge
34A-4:- Painting with Primer of SWAS Primary/SecondaryWet and Dry Panels, Pipes, Racks, Chiller Unit, Rotameters and Chemical dosing panel/ equipment’s
35JOB-B:- Overhauling of OLCTC System
36Overhauling/servicing of OLCTC system arrangement A&B of unit No.4 of 2x210 MW, PTPP, Parichha as per detailed scope of work sl. No. 1 to 6
37Overhauling of Motorized actuator with motor of Screen separating. Rating 0.55 KW as per detailed scope of work sl. No. 07
38Overhauling of Motorized actuator with motor of ball circulation Rating 0.045 KW as per detailed scope of work sl. No. 07
39Overhauling, Servicing and reconditioning of PLC system, moulded case circuit breaker with all it supporting circuitry and C&I equipment’s.
40Spares required for above overhauling work
41Gland packing
42Sleeve Shaft
43Impeller gasket-PTFE
44Deflector
45Lip seal I.B
46Lip seal O.B
47Adapter ‘O’ Ring (2K & 3K)
48Cover gasket- PTFE
49Spare Seal Kit for ball valves make Microfinish, Body Seat: PTFE, Body Seal: PTFE, Stem Seal: PTFE, Stem Washer: GFT of Size: 25(1”)mm, Size: 50(2”)mm and Size: 80(3”)mm
50Coupling 110 for pump
51L.B. Bearing-6310 make SKF
52O.B. Bearing-3310 make SKF
53Job C:- Overhauling ofCEMS and EQMS System
54Overhauling ofCEMS and EQMS System as per details and scope of work ofJOB-C
55JOB- D:- Overhauling of Field C&I Equipments installed in common facility plants (BOP) of 2x210 MW,PTPP, Parichha
56Pressure/Temperature gauges and switches- Disconnection, cleaning, checking, repairing, reconditioning, replacement of damaged parts, recalibration & recommissioning of
57Pressure/Temp. Gauges
58Pressure/Temp. Switches
59Transmitter, Recorder, Indicators and Electronic card & modules etc.- Disconnection, cleaning, checking, repairing, reconditioning, replacement of damaged spare parts, recalibration & recommissioning
60Pressure, Flow & Level Tr.
61Indicator
62Recorder
63Electronic Regulator for Air Compressor
64Energy Saver for Air Compressor
65Temp./ Pr. Transducer - Disconnection, cleaning, checking, repairing, reconditioning & recommissioning
66Level gauges, Level Switches & Level Indicator- Disconnection, cleaning, checking, repairing, reconditioning, replacement of damaged parts, recalibration & recommissioning
67Level gauge (float type)
68Level Switch (Conductivity type)
69Level Switch (Reflex type)
70Level Switch (Ext. cagetype)
71Level Switch (Floattype)
72Level gauge (Reflextype)
73Rotameter- Disconnection, cleaning, checking, repairing, reconditioning, replacement of damaged parts, &re-commissioning
74Pneumatic/ Electrical Actuator and valve- Disconnection, cleaning, checking, repairing, reconditioning, replacement of damaged parts & recommissioning
75Pneumatic Actuator
76Electrical Actuator
77Solenoid valves and EWD (Electronic water drain)- Disconnection, cleaning, checking, repairing, reconditioning, replacement of damaged parts & recommissioning of
78Solenoid valve
79Elect. water drain (EWD)
80Analyzer and Dew Point Indicator- Disconnection, cleaning, checking, repairing, reconditioning, replacement of damaged parts, recalibration & re-commissioning of
81PH Analyzer
82Conductivity Analyzer
83Silica Analyzer
84Do2 Analyzer
85Isolating, drain valve and manifold etc.- Disconnection, cleaning, checking, repairing, reconditioning, replacement& re-commissioning
86Cleaning, Nomenclature & Spray Painting of electrical & pneumatic actuators.
87Cleaning and spray painting ofcontrol panels/desk
88JOB- E: Overhaulingand Reconditioning ofPLC system and logic control circuit and its module /equipment’s/panel of DM plant and Raw Water Plantof 2x210 MW,PTPP, Parichha
89Overhaulingand Reconditioning of PLC system andits electronic cords/Module/ Peripherals of DM plant.
90Overhauling and Reconditioning of logic control circuit and its equipment’s/panel ofRaw Water Plant

AI Tender Summary

OUR REF NO 39595059
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 9.89 Lakhs
LAST DATE 05-10-2023
Authority
Authority Name Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited
Work Description Overhauling Of Steam And Water Analysis System ( Swas ) , Gas Analysers, C&I Equipment’S Of Chemical Dosing System, Olctc System, Cems & Eqms, C&I Equipment’S And Plc Installed At Bop Area--A:- Overhauling Of Steam And Water Analysis System ( Swas ) , Gas Analyzers And C&I Equipment’S Of Chemical Dosing System 2 A-1:- Steam & Water Analysis System 3 Sample Cooler 4 Rota Meter 30 Lph 5 Regulating Valve / Pressure Relief Valve 6 Solenoid Valve 7 Temperature And Pressure Gauges 8 Temperature And Pressure Switches 9 ½ Inch Sample & Cooling Isolating Valve 10 2Nb Isolating Valve 11 Coolant Flow Indicator 12 Sample Filter 13 3-Way Valve Ball 14 S.S. Tubing’S, Connectors, Fittings And Wiring Etc. Of Primary, Secondary Rack And Wet Panel 15 Cation Exchange Column 16 Conductivity Cell, Ph Electrode And Do2 Sensor 17 Ph / Conductivity Flow Through Chamber 18 Ph, Conductivity And Do2analyzer / Transmitter 19 Cutting / Welding, Replacement, Revisioning Of High Pressure Valve ( 12Mm To 25Mm ) 20 Repairing / Replacement Of Ss Impulse Line By Cutting And Welding Workasand When Required 21 A-2:- Gas Analyzer: 22 Oxygen Analyzer 23 Converter Unit 24 Detector Unit 25 Calibration Unit 26 Hydrogen Purity Analyzer 27 Transmitter / Receiver Unit 28 Calibration Unit 29 A-3:- Hydrazine, Phosphate & Ammonia Dosing System:- 30 Control Panel Equipment 31 Temp / Pressure Gauges 32 Level Switches 33 Level Gauge 34 A-4:- Painting With Primer Of Swas Primary / Secondarywet And Dry Panels, Pipes, Racks, Chiller Unit, Rotameters And Chemical Dosing Panel / Equipment’S 35 Job-B:- Overhauling Of Olctc System 36 Overhauling / Servicing Of Olctc System Arrangement A&B Of Unit No.4 Of 2X210 Mw, Ptpp, Parichha As Per Detailed Scope Of Work Sl. No. 1 To 6 37 Overhauling Of Motorized Actuator With Motor Of Screen Separating. Rating 0.55 Kw As Per Detailed Scope Of Work Sl. No. 07 38 Overhauling Of Motorized Actuator With Motor Of Ball Circulation Rating 0.045 Kw As Per Detailed Scope Of Work Sl. No. 07 39 Overhauling, Servicing And Reconditioning Of Plc System, Moulded Case Circuit Breaker With All It Supporting Circuitry And C&I Equipment’S. 40 Spares Required For Above Overhauling Work 41 Gland Packing 42 Sleeve Shaft 43 Impeller Gasket-Ptfe 44 Deflector 45 Lip Seal I.B 46 Lip Seal O.B 47 Adapter ‘O’ Ring ( 2K & 3K ) 48 Cover Gasket- Ptfe 49 Spare Seal Kit For Ball Valves Make Microfinish, Body Seat: Ptfe, Body Seal: Ptfe, Stem Seal: Ptfe, Stem Washer: Gft Of Size: 25 ( 1” ) Mm, Size: 50 ( 2” ) Mm And Size: 80 ( 3” ) Mm 50 Coupling 110 For Pump 51 L.B. Bearing-6310 Make Skf 52 O.B. Bearing-3310 Make Skf 53 Job C:- Overhauling Ofcems And Eqms System 54 Overhauling Ofcems And Eqms System As Per Details And Scope Of Work Ofjob-C 55 Job- D:- Overhauling Of Field C&I Equipments Installed In Common Facility Plants ( Bop ) Of 2X210 Mw, Ptpp, Parichha 56 Pressure / Temperature Gauges And Switches- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, Recalibration & Recommissioning Of 57 Pressure / Temp. Gauges 58 Pressure / Temp. Switches 59 Transmitter, Recorder, Indicators And Electronic Card & Modules Etc.- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Spare Parts, Recalibration & Recommissioning 60 Pressure, Flow & Level Tr. 61 Indicator 62 Recorder 63 Electronic Regulator For Air Compressor 64 Energy Saver For Air Compressor 65 Temp. / Pr. Transducer - Disconnection, Cleaning, Checking, Repairing, Reconditioning & Recommissioning 66 Level Gauges, Level Switches & Level Indicator- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, Recalibration & Recommissioning 67 Level Gauge ( Float Type ) 68 Level Switch ( Conductivity Type ) 69 Level Switch ( Reflex Type ) 70 Level Switch ( Ext. Cagetype ) 71 Level Switch ( Floattype ) 72 Level Gauge ( Reflextype ) 73 Rotameter- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, &Re-Commissioning 74 Pneumatic / Electrical Actuator And Valve- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts & Recommissioning 75 Pneumatic Actuator 76 Electrical Actuator 77 Solenoid Valves And Ewd ( Electronic Water Drain ) - Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts & Recommissioning Of 78 Solenoid Valve 79 Elect. Water Drain ( Ewd ) 80 Analyzer And Dew Point Indicator- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement Of Damaged Parts, Recalibration & Re-Commissioning Of 81 Ph Analyzer 82 Conductivity Analyzer 83 Silica Analyzer 84 Do2 Analyzer 85 Isolating, Drain Valve And Manifold Etc.- Disconnection, Cleaning, Checking, Repairing, Reconditioning, Replacement& Re-Commissioning 86 Cleaning, Nomenclature & Spray Painting Of Electrical & Pneumatic Actuators. 87 Cleaning And Spray Painting Ofcontrol Panels / Desk 88 Job- E: Overhaulingand Reconditioning Ofplc System And Logic Control Circuit And Its Module / Equipment’S / Panel Of Dm Plant And Raw Water Plantof 2X210 Mw, Ptpp, Parichha 89 Overhaulingand Reconditioning Of Plc System Andits Electronic Cords / Module / Peripherals Of Dm Plant. 90 Overhauling And Reconditioning Of Logic Control Circuit And Its Equipment’S / Panel Ofraw Water Plant
Basic Detail
Tender No N-PAR/B/OMC3/IMD2/6000003343
Bidding Type Tender
Location
City parichha
State Uttar Pradesh
Key Dates
Publish Date 11 Sep 2023
Submission Date 05 Oct 2023
Open Date 05 Oct 2023
Finance
Tender Value 9.89 Lakhs
Tender Fee 1180
EMD 15000
Exemption Not Available
Document List
1990c96b-0726-48f7-88dc-08af2a05a0df.html
BOQ_1403485.xls
TenderDoc1.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 11, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 05, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 05, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

1990c96b-0726-48f7-88dc-08af2a05a0df.html

xls

BOQ_1403485.xls

pdf

TenderDoc1.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail