Edd-Iiird, Sakaldiha In The Work Plan Of Rs. 20.00 Crore Allocated For The Work Of System Strengthening Under The Additional Business Plan 2023-24 In Edsd-I, Iii, Kamalpur, Amda Under Installed On Lt Line, Replacement Of Dilapidated Abc Cable/Wire. (On Se
Tender Overview
Project Description
Edd-Iiird, Sakaldiha In The Work Plan Of Rs. 20.00 Crore Allocated For The Work Of System Strengthening Under The Additional Business Plan 2023-24 In Edsd-I, Iii, Kamalpur, Amda Under Installed On Lt Line, Replacement Of Dilapidated Abc Cable / Wire. ( On Semi-Turn-Key Basis ) .- 1 Decentralized Materials 2 GROUTING OF POLE 3 STONE PAD 4 T-OFF CHANNEL CLAMP 5 HOLDING CLAMP FOR DP/SS 6 DEAD END CLAMP WITH I HOOK 7 SUSPENSION CLAMP WITH I HOOK 8 PEARCING CONNECTOR 9 NUT & BOLT 10 Construction of Transformer Plinth for 250/400KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of Plinth plastering of walls and finishing including cost of all materials. 11 LABOUR CHARGE 12 CARTAGE and ERECTION FOR PCC POLE 8.5M LONG DP ON 25KVA. 13 CARTAGE and ERECTION FOR 8.5M PCC POLE with all Fittings. 14 CARTAGE and ERECTION FOR 11M STP POLE with all Fittings. 15 CARTAGE and ERECTION FOR LT ABC (3x50+1x35+1x16) sqmm with all Fittings. 16 CARTAGE and ERECTION FOR LT ABC (3x95+1x70+1x16) sqmm with all Fittings. 17 CARTAGE and ERECTION FOR LT ABC (3x120+1x95+1x16) sqmm with all Fittings. 18 CARTAGE and ERECTION FOR Distribution Box with all Fittings. 19 EARTHING OF POLE WORK. 20 CARTAGE AND ERECTION OF ACSR WEASEL CONDUCTOR. 21 STEY SET COMPLETE WORK. 22 Mounting of 63KVA Transformer as per RESSPO norms. 23 Mounting of 100KVA Transformer as per RESSPO norms. 24 Mounting of 250KVA Transformer as per RESSPO norms. 25 Mounting of 400KVA Transformer as per RESSPO norms. 26 Cartage of Received Back Old 25KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. 27 Cartage of Received Back Old 63KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. 28 Cartage of Received Back Old 100KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. 29 Cartage of Received Back Old 250KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. 30 Cartage of Received Back Old 10KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. 31 CARTAGE AND ERECTION OF REPLACEMENT OF LT ABC (3x50+1x35+1x16)sqmm Old and Used.
BOQ
| Sl. No. | Item Description |
| 1 | Decentralized Materials |
| 2 | GROUTING OF POLE |
| 3 | STONE PAD |
| 4 | T-OFF CHANNEL CLAMP |
| 5 | HOLDING CLAMP FOR DP/SS |
| 6 | DEAD END CLAMP WITH I HOOK |
| 7 | SUSPENSION CLAMP WITH I HOOK |
| 8 | PEARCING CONNECTOR |
| 9 | NUT & BOLT |
| 10 | Construction of Transformer Plinth for 250/400KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of Plinth plastering of walls and finishing including cost of all materials. |
| 11 | LABOUR CHARGE |
| 12 | CARTAGE and ERECTION FOR PCC POLE 8.5M LONG DP ON 25KVA. |
| 13 | CARTAGE and ERECTION FOR 8.5M PCC POLE with all Fittings. |
| 14 | CARTAGE and ERECTION FOR 11M STP POLE with all Fittings. |
| 15 | CARTAGE and ERECTION FOR LT ABC (3x50+1x35+1x16) sqmm with all Fittings. |
| 16 | CARTAGE and ERECTION FOR LT ABC (3x95+1x70+1x16) sqmm with all Fittings. |
| 17 | CARTAGE and ERECTION FOR LT ABC (3x120+1x95+1x16) sqmm with all Fittings. |
| 18 | CARTAGE and ERECTION FOR Distribution Box with all Fittings. |
| 19 | EARTHING OF POLE WORK. |
| 20 | CARTAGE AND ERECTION OF ACSR WEASEL CONDUCTOR. |
| 21 | STEY SET COMPLETE WORK. |
| 22 | Mounting of 63KVA Transformer as per RESSPO norms. |
| 23 | Mounting of 100KVA Transformer as per RESSPO norms. |
| 24 | Mounting of 250KVA Transformer as per RESSPO norms. |
| 25 | Mounting of 400KVA Transformer as per RESSPO norms. |
| 26 | Cartage of Received Back Old 25KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. |
| 27 | Cartage of Received Back Old 63KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. |
| 28 | Cartage of Received Back Old 100KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. |
| 29 | Cartage of Received Back Old 250KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. |
| 30 | Cartage of Received Back Old 10KVA Transformer from work site to Store Center Sahupuri including loading & Unloading Charge. |
| 31 | CARTAGE AND ERECTION OF REPLACEMENT OF LT ABC (3x50+1x35+1x16)sqmm Old and Used. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender