}

Tender For Repairs And Replacement Of Control Switch Gear Electric Control Vfd Automation System Scale Preventer At Rci Under Ge I Rnd Rci Hyderabad, hyderabad-Telangana

Military Engineer Services-MES has published Tender For Repairs And Replacement Of Control Switch Gear Electric Control Vfd Automation System Scale Preventer At Rci Under Ge I Rnd Rci Hyderabad. Submission Date for this Tender is 29-09-2023. Switch Gear Tenders in hyderabad Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

39563555
Tender For Repairs And Replacement Of Control Switch Gear Electric Control Vfd Automation System Scale Preventer At Rci Under Ge I Rnd Rci Hyderabad
Open Tender
Indian
Telangana
hyderabad
29-09-2023

Tender Details

Repairs And Replacement Of Control Switch Gear Electric Control Vfd Automation System Scale Preventer At Rci Under Ge I Rnd Rci Hyderabad

Key Value

Document Fees
INR 500 /-
EMD
INR 80000.0 /-
Tender Value
INR 40 Lakhs /-

BOQ Items

Name of Work: REPAIRS AND REPLACEMENT OF CONTROL SWITCH GEAR, ELECTRIC CONTROL VFD, AUTOMATION SYSTEM, SCALE PREVENTER AT RCI UNDER GE (I) R&D RCI, HYDERABAD
Sl. No. Item Description
1Disconnecting and removing of the unserviceable VFD panel from the existing position and supply and fix, connecting & testing new VFD drive VLT 6000HVAC -01 Nomake Donfoss, 3 pole power contactors MN32-02Nos Make L&T , Relay 14to 23 Amps max 33 AmpsMake L&T -01 No,PLA relay -01 No,MCB SP 6 Amps-01 NosHager make fuse carrier 63 Amp male/female -03 Nos make Vecco pushbutton -02 Nos and indicating lamp 03 Nos complete all as specified and directed.
2Disconnecting the unserviceable VFD panel from the existing position and repair, fix, connecting & testing DANFOSS VLT6000 HVAC 5.5 KW / 7.5 KW (HFT / 18474), VFD drive complete all as specified and directed by the Engr-in-Charge.
3Disconnecting the unserviceable VFD panel from the existing position and repair, fix, connecting & testing DANFOSS VLT6000 HVAC 5.5 KW / 7.5 KW (HFT / 18475), VFD drive complete all as specified and directed by the Engr-in-Charge.
4Disconnecting the unserviceable VFD panel from the existing position and repair, fix, connecting & testing DANFOSS VLT6000 HVAC 5.5 KW / 7.5 KW (HFT / 18476), VFD drive complete all as specified and directed by the Engr-in-Charge.
5Disconnecting the unserviceable VFD panel from the existing position and repair, fix, connecting & testing 23A with BOP (HFT / 18605), VFD drive complete all as specified and directed by the Engr-in-Charge.
6Draining out the old existing used York L compressor oil from the compressor at AD Integration plant, supply and Charging of York L compressor oil complete all as directed by Engineer-in-charge.
7Supply only synthetic oil RL 220. Make : RL
8Supply only compressor oil
9Supply only compressor frezol68
10Disconnecting and removing of the unserviceble External Oil filter from the compressor, supply and fixing new External Oil filter all as specified and directed by Engr-in-Charge.
11Disconnecting and removing of the unserviceble Internal Oil filter from the compressor, supply and fixing new Internal Oil filter all as specified and directed by Engr-in-Charge.
12Disconnecting and removing of the un-serviceable low pressure cut out switch from the existing position, supply and fixing new Low Pressure Cut Out Switch all as directed.
13Disconnecting and removing of the un-serviceable high pressure cut out switch from the existing position, supply and fixing new High Pressure Cut Out Switch all as directed.
14Disconnecting and removing of the un-serviceable oil pressure cut out switch from the existing position, supply and fixing new Oil Pressure Cut Out Switch all as directed.
15Disconnecting and removing of the un-serviceable compressor loading solenoid coil from the existing position, supply and fixing new Compressor Loading Solenoid Coil all as directed.
16Disconnecting and removing un-serviceable water flow switch from the existing position, supply and fixing new Water Flow Switch all as directed.
17Disconnecting and removing un-serviceable water pressure cut out switch from the existing position, supply and fixing new Water Pressure Cut Out Switch all as directed.
18Removing un-serviceable catch all core filter from the existing position, supply and fixing new Catch All Core Filter all as directed.
19Disconnecting electrically and mechanically the condensor fan motor from the existing position and rewinding, varnishing, insulation, ovening, greasing to the condensor fan motor, replacing of bearings all as directed by the Engr-in-Charge
20Disconnecting and removing un-serviceable 1/4" copper pipe coil from the existing position, supply and fixing new 1/4" Copper Pipe Coil all as directed.
21Disconnecting and removing un-serviceable 1/4" copper fare nut from the existing position, supply and fixing new 1/4" Copper Fare Nut all as directed.
22Disconnecting and removing un-serviceable 1/4" copper Tee from the existing position, supply and fixing new 1/4" Copper Tee all as directed.
23Disconnecting and removing un-serviceable 1/4" copper angle valve from the existing position, supply and fixing new 1/4" Copper Angle Valve all as directed.
24Disconnecting and removing un-serviceable sub zero controller from the existing position, supply and fixing new Sub Zero Controller all as directed.
25Disconnecting and removing un-serviceable condensor fan motor contactor MN18 from the existing position, supply and fixing new Condensor Fan Motor Contactor MN18 all as directed.
26Disconnecting and removing un-serviceable compressor contactor 3TF S1 from the existing position, supply and fixing new Compressor Contactor 3TF S1 all as directed.
27Disconnecting and removing un-serviceable star delta timer from the existing position, supply and fixing new Star Delta Timer all as directed.
28Disconnecting and removing un-serviceable / burnt out copper multistrand 3 core, 2.5 Sqmm cable from the existing position, supply and fixing new Copper Multistrand 3 core, 2.5 Sqmm cable all as directed.
29Disconnecting and removing un-serviceable / burnt out copper multistrand 4 core, 4 Sqmm cable from the existing position, supply and fixing new Copper Multistrand 4 core, 4 Sqmm cable all as directed.
30Disconnecting and removing un-serviceable / burnt out copper control wiring multistrand 11/8 cable from the existing position, supply and fixing new Copper Control Wiring Multistrand 11/8 all as directed.
31Disconnecting andisolating the compressor of 120 TR capacity from the system by placing dummy plates to suction and discharge valves, opening the compressor, removing all the internal parts, re-winding the stator, cleaning of all the parts thoroughly supply and replacing the worn out parts of piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets and refixing / reassembling the compressor unit, checking oil pressure removing the dummy plates and testing the compressor complete to the entire satisfaction all as directed by Engineer-in-Charge
32Leak testing of the systemAC plant of various capacity with nitrogen (N2) pressure after evacuatingthe existing gas from the system in to empty cylinder by separating the entire system likecompressors, condenser, cooling coil and refrigerant lines and rectifyingthe leakage including cutting, welding, brazing etc and reconnecting with ‘O’ rings, Washers, gaskets etc, flushing out the Nitrogen and vacuumising, recharging the taken out refrigerant gas complete all as directed.
33Supply and filling of any type of Refrigerant gas R-22 / 134A / 407 C / 404 complete all as directed.
34Supply and replacement of 4 poleMCCB 630 Amps for 0901 AC plant having current carrying capacitieswith adjustable thermal and adjustable magnetic settings, 50 Hz with 36 KA rupturing capacity at 415 volt,conforms to IEC -60947-II/ IS-13947-II including provision of copper cable/ extended terminals of suitable ratings from MCCBs to busbar and connection of LT cables with MCCBs with suitable size aluminium lugs, dismantling the unserviceable MCCBs from the panel boards complete all as specified and directed. Make:Havells / Standard / L&T / GE / C&S.
35Supply and replacement of 4 poleMCCB 400 Amps for QR AC plant having current carrying capacitieswith adjustable thermal and adjustable magnetic settings, 50 Hz with 65 KA rupturing capacity at 415 volt,conforms to IEC -60947-II/ IS-13947-II including provision of copper cable/ extended terminals of suitable ratings from MCCBs to busbar and connection of LT cables with MCCBs with suitable size aluminium lugs, dismantling the unserviceable MCCBs from the panel boards complete all as specified and directed. Make:Havells / Standard / L&T / GE / C&S.
36Dismantling unserviceable modulating valve of size 50 / 80mm and supply and fix a new modulating valve in chilled water line including gear box servicing, reprogramming B.M.S system, servicing to D.C motor 24V and replacing the thermostat and limit switches complete all as specified and directed. cast of the sensor and limit switches shall be deemed to be included in the unit rate quoted.
37Repairs to modulating valve of size 50 / 80mm fixed in chilled water line including gear box servicing, reprogramming B.M.S system, servicing to D.C motor 24V and replacing the thermostat and limit switches with new ones complete all as specified and directed.
38Disconnecting and removing the unserviceable burnt out contactor, supply and fix new power contactor 50Hz, 415 Volts grade of ML2 capacity including connecting and testing complete all as directed.
39All as per Ser Item No 38 above but of capacity ML 4
40All as per Ser Item No 38 above but of capacityML 3
41All as per Ser Item No 38 above but of capacityCL 01
42All as per Ser Item No 38 above but of capacityCL 02
43All as per Ser Item No 38 above but of capacityCL 25
44All as per Ser Item No 38 above but of capacityCL 45
45All as per Ser Item No 38 above but of capacityMNX 18
46All as per Ser Item No 38 above but of capacityMNX 25
47All as per Ser Item No 38 above but of capacityMNX 45
48All as per Ser Item No 38 abovebut of capacity SC N3 (65) 65 Amps
49All as per Ser Item No 38 above but of capacity SC 03 (11) 20 Amp
50All as per Ser Item No 38 above but of capacity CL 25
51All as per Ser Item No 38 above butof capacity CL 45
52All as per Ser Item No 38 above but of capacity 00/01/SFK, 25 Amps
53All as per Ser Item No 38 above but of capacity CL 50, 125 Amps Make for Ser Item Nos 38 to 53 : L&T / ABB / GE
54Checking of AC plant electrical panel inter locking system, cleaning of busbars and panel internal part with CTC and connections of the bus bar cleaning of contract points including replacement of indicating lamps, lamp holders, toggle switches, push buttons, contact kkits and necesary connections complete all as specified and directed for tech plants of an capacity.
55Disconnecting and removing the un-serviceable display board of chiller unit from the existing position, supply and fixing new Display Board in chiller unit of War Head AC plant all as specified and directed by Engr-in-Charge.
56Disconnecting and removing of un-serviceable prodialog basi (Mother board) of chiller unit from the existing position, supply and fixing new Prodialog Basi (Mother Board) in chiller unit of War Head AC plant all as specified and directed by Engr-in-Charge.
57Disconnecting and removing of un-serviceable fan board of chiller unit from the existing position, supply and fixing new Fan Board in chiller unit of War Head AC plant all as specified and directed by Engr-in-Charge.
58Disconnecting andisolating the compressor of 75 TR capacity (War Head AC Plant) from the system by placing dummy plates to suction and discharge valves, opening the compressor, removing all the internal parts, cleaning of all the parts thoroughly, supply and replacing the worn out parts of "O" Ring set, bearings, gasket sets and refixing / re-assembling the compressor unit, checking oil pressure removing the dummy plates and testing the compressor complete to the entire satisfaction all as directed by Engineer-in-Charge
59Draining out the unserviceable synthetic oil from the compressor of War Head AC Plant and supply, charging of Synthetic Oil complete all as specified and directed by Engineer-in-charge.
60Disconnecting and removing of un-serviceable sensor in chiller unit from the existing position, supply and fixing new Sensor in chiller unit of War Head AC plant all as specified and directed by Engr-in-Charge.
61Disconnecting and removing of the unserviceble core filter from the compressor at War Head AC plant, supply and fixing new Core Filter all as specified and directed by Engr-in-Charge.
62Disconnecting and removing the unserviceble LP Tranducer from the chiller unit at War Head AC plant, supply and fixing new LP Tranducer all as specified and directed by Engr-in-Charge.
63Disconnecting and removing the unserviceble HP Tranducer from the chiller unit at War Head AC plant, supply and fixing new HP Tranducer all as specified and directed by Engr-in-Charge.
64Disconnecting and removing the unserviceble Tranducer cable from the chiller unit at War Head AC plant, supply and fixing new Tranducer cable all as specified and directed by Engr-in-Charge.
65Disconnecting and removing the un-serviceable PDS-SCPM3 board of chiller unit from the existing position, supply and fixing new PDS-SCPM3 Board in chiller unit of War Head AC plant all as specified and directed by Engr-in-Charge.
66Disconnecting and removing the un-serviceable EXV board of chiller unit from the existing position, supply and fixing new EXV Board in chiller unit of War Head AC plant all as specified and directed by Engr-in-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail