Tender For Pyrolytic Graphite Roll The PGS Rolls should not have any backing film/ sheet. Yes / No / Explain 2 PGS Rolls should be in 25m bundle. Yes / No / Explain 3 Provide compliance for General terms and conditions which is attached as a separate sheet in a document folder. Yes / No / Explain 4 Taxes : Government of India has implemented Goods and Services Tax [GST] w.e.f. 01.07.2017. The Tenderer[s] should mandatorily possess a valid GSTIN along with the GST Registration Certificate. Yes / No / Explain 5 Indicate the applicable Rate of GST for the quoted item/s Yes / No / Explain 6 Indicate the applicable HSN code/s for the quoted item/s Yes / No / Explain 7 Have you noted the applicability of GST in clause 6.0 of our General Terms and conditions attached to this Tender Yes / No / Explain Custom Duty: U R Rao Satellite Centre [URSC], Bengaluru is eligible for payment of Customs Duty at the rate of 5 per cent plus Social Welfare Cess at the rate of 10 per cent on CD & IGST at the rate of 5 per cent vide Notification No.12/12- Customs dated 17.03.2012 superseded by Notification No.50/17-Customs dated 30.06.2017 and as amended by Notification No. 5/2018-Customs dated 25.01.2018, Sl. No. 539A. The necessary Customs Duty Exemption Certificate (CDEC) shall also be provided by URSC to those bidders who claim Purchase Preference under Make in India Policy and fulfill all requirements of tender document applicable for Indigenous Manufacturer i.e., Class-I/Class-2 local supplier. Such Class-I/Class- 2/Non-local suppliers have to take note of this aspect and submit their Offer clearly mentioning that the quoted Price for Imported contents includes concessional Customs Duty as per above Notification. While requesting for issue of CDEC for the imported contents, the Tenderer[s] should mention the Item Description, Quantity and Value for which CDEC is to be provided for the bought out Imported Items. The necessary documentary proofs like P.O., on their Supplier, Invoice, AWB shall be produced while requesting for issue of CDEC from URSC. However, CDEC will be issued only to those supplier, not exceeding the limit of foreign content declared in their quote. Also a declaration of the Supplier in their letter head that imported items in the Invoice are used for realization of ordered items. Yes / No / Explain 9 Delivery Terms [Indigenous Supply]: Tenderer[s] shall quote the Price[s] on FOR, URSC/ISITE, Bengaluru. [For Import Supply]: Tenderer[s] are requested to quote the Price[s] on Exworks/ FCA(Airport/Seaport)/FOB(Se aport) or as per INCO terms. Yes / No / Explain Tender No : URSC/CE/IS202300068501 Page 46 of 54 10 Delivery Date/Completion Date: Delivery is the essence of the Contract. Tenderer[s] is/are hereby requested to mention the Firm Delivery Date/Completion Date. Also mention period required for installation & commissioning separately, in addition to the delivery period, if it is there in the scope. Yes / No / Explain 11 Mode of Despatch (Air/Sea/Rail/Road) Yes / No / Explain 12 Payment Terms: Payment shall be 100 per cent payment within 30 days after receipt and acceptance of Stores at URSC, Bengaluru or as per RPF terms Yes / No / Explain 13 Name of Suppliers Banker & Account Number with IFSC code Yes / No / Explain 14 Security Deposit: The Contractor shall execute Security Deposit for 3 per cent of the value of the Purchase Order to ensure Satisfactory Performance of the Contract. The Security Deposit shall be executed within 20 days after Receipt of Purchase Order or any extension thereof. The Security Deposit is to be furnished in the form of Insurance Surety Bond or Account Payee Demand Draft or Fixed Deposit Receipt or Bank Guarantee from Nationalized Bank/Scheduled Bank/International Bank approved by RBI. The Security Deposit shall be executed on a Non- Judicial Stamp Paper of Rs. 200/- value and shall be valid for a period of 60 days beyond the date of completion of the P.O/Contract.. In case the Contractor fails to furnish the Security Deposit within 20 days or any extension thereof the Purchase Order shall be Cancelled or Terminated and appropriate penal action shall be initiated. Any breach of the Terms and Conditions of the PO including Delivery Period, Security Deposit shall be forfeited and PO shall be terminated and cancelled at the Contractors risk, cost and liability. The Security Deposit will not carry any interest and shall be returned after completely executing the order. Adherence to this clause is compulsory or otherwise, the Tender will be rejected. Yes / No / Explain Tender No : URSC/CE/IS202300068501 Page 47 of 54 15 Performance Bank Guarantee: The Contractor shall execute Performance Bank Guarantee for 3 per cent value of the Purchase Order for fulfillment of Warranty obligations. The PBG shall be executed through Insurance Surety Bond/Account Payee Demand Draft/ Fixed Deposit receipts or Bank Guarantee issued by a Nationalized Bank/Schedule Bank/International Bank approved by RBI. The PBG shall be executed on a Non-Judicial Stamp Paper of Rs. 200/- value. The Performance Bank Guarantee shall be executed as per our specimen and shall be valid for a period of 60 days beyond the date of completion of all the terms and conditions of the P.O,/expiry date of warranty period. The Performance Bank Guarantee shall be executed before claiming payment. The PBG will not carry any interest and shall be returned after completion of all the Contractual obligations of the Contract with a NO CLAIM CERTIFICATE issued by Contractor as per our Specimen enclosed. Adherence to this clause is compulsory or otherwise, the Tender will be rejected. Yes / No / Explain 16 Warranty/Guarantee: Tenderer[s] are requested the Indicate Applicable Standard Warranty/Guarantee Period. Warranty period shall commence from the date of acceptance of the goods by the purchaser. All the replacements during the Warranty period shall be carried out by the successful Tenderer[s] Free of all Cost including To & fro Freight Charges, taxes and duties, if any. Return of replaced parts/equipment shall be the responsibility of the Supplier, at their cost. Yes / No / Explain Tender No : URSC/CE/IS202300068501 Page 48 of 54 17 Liquidated Damages: The time and date stipulated in the contract for completion of the work shall be deemed to be the essence of the contract. If the Contractor fails to deliver the Stores within the time specified in the Contract or any extension thereof or if the Contractor fails to maintain the required progress or comply with the relevant provisions of the general conditions of contract or special conditions of contract, if any and clear the site on or before the contract or extended date of completion, the Purchaser shall, without prejudice to any other right or remedy available under the law to Purchaser on account of such breach, recover from the Contractor as Liquidated Damages a sum onehalf of one percent [0.5 percent] of the Contract price of the undelivered Stores for each calendar week of delay or part thereof. The total Liquidated Damages shall not exceed Ten percent [10 percent] of the Contract price of the undelivered stores. In case of delay in delivery of the Stores beyond the delivery date stipulated in the Purchase Order/Contract or any extension thereof, such Stores shall be received without prejudice to the right of the Purchaser to claim Liquidated Damages and without prejudice to the terms and conditions of the Purchase Order/Contract. Adherence and acceptance to this Clause is Compulsory or otherwise the Tender will be rejected. Yes / No / Explain 18 Validity of Offer: The Bid and the prices quoted shall remain valid for 90 days for Single Part Tender. In case of Two Part Tender, bid validity shall remain valid for 120 days from the date of opening Part-1 and 90 days from the date of opening of Part-2 bid. Adherence and acceptance to this Clause is Compulsory or otherwise the Tender will be rejected. Yes / No / Explain Tender No : URSC/CE/IS202300068501 Page 49 of 54 19 Pre-Delivery Inspection [PDI] [if Required]: The successful Tenderer[s] has to arrange for the necessary PDI of the Stores at the Contractor Factory Premises to enable URSC Engineers to carry out PDI. The PDI is applicable wherever the RFP document/Scope of Work calls for such an inspection. Yes / No / Explain 20 Factory Acceptance Testing [FAT] [if Required]: The successful Tenderer[s] has to arrange for the necessary FAT of the Stores at the Contractor Factory Premises to enable URSC Engineers to carry out FAT. The FAT is applicable wherever the RFP document/Scope of Work calls for such as FAT. Yes / No / Explain 21 Tenderer[s] are requested to mention whether Installation, Testing, Commissioning, Demonstration, Acceptance and imparting Training is necessary for the Tendered Stores. Do not mention any price under this column in case of Two-Part Tender. Yes / No / Explain Arbitration (Local suppliers): :In the event of any dispute/s, difference/s or claim/s arising out of or relating to the interpretation and application of the Contract, such dispute/s or difference/s or claim/s shall be settled amicably by mutual consultations of the good Offices of the respective Parties and recognizing their mutual interests attempt to reach a solution satisfactory to both the parties. If such a resolution is not possible, within 30 days from the date of receipt of written notice of the existence of such dispute/s, then the unresolved dispute/s or difference/s or claim/s shall be referred to the Sole Arbitrator appointed by the Parties by mutual consent, in accordance with the rules and procedures of Arbitration and Conciliation Act 1996 together with amendments thereto or any modification thereof. The Arbitration shall be conducted in Bengaluru in the Arbitration and Conciliation Centre - Bengaluru (Domestic and International) as per its rules and regulations. The expenses for the Arbitration shall be shared equally or as may be determined by the Arbitrator. The considered and written decision of the Arbitrator shall be final and binding between the Parties. The applicable language for Arbitration shall be English only. Work under the contract shall be continued by the Tenderer during the pendency of arbitration proceedings, without prejudice to a final adjustment in the accordance with the decision of the Arbitrator unless otherwise directed in writing by the Purchaser or unless the matter is such that the works cannot be possibly continued until the decision (whether final or interim) of the Arbitrator is obtained. Adherence and acceptance to this Clause is Compulsory or otherwise the Tender will be rejected. Yes / No / Explain Tender No : URSC/CE/IS202300068501 Page 51 of 54 23 Arbitration with Overseas Supplier: In the event of any dispute or difference arising out of or in connection with this Purchase Order, such dispute or difference shall be settled amicably by mutual consultants or through the good offices of the respective parties. If such resolution is not possible, then the unresolved dispute or difference shall be referred to the Sole Arbitrator appointed in accordance with provisions of the ICADR Arbitration Rules, 1996 of the International Center for Alternative Dispute Resolution, New Delhi. The Arbitration shall be conducted in India in accordance with the Rules & Procedures of the Arbitration and Conciliation Act of 1996 or any reenactment or modification thereof. The expenses for the Arbitration shall be paid as may be determined by the Arbitrator. The Seat for Arbitration shall be Bengaluru. The applicable language for Arbitration shall be English only. Adherence and acceptance to this Clause is Compulsory or otherwise the Tender will be rejected. Yes / No / Explain 24 Arbitration with Public Sector Undertakings: In the event of any dispute or difference relating to the interpretation and application of the Contract, such dispute or difference shall be taken up by either party for resolution through AMRCD as mentioned in DPE OM No. 4 (1)/2013 - DPE (GM) /FTS-1835 dated 22.05.2018. And/or amended thereafter. Yes / No / Explain 25 Applicable Law and Jurisdiction: Contract shall be interpreted, construed and governed by the Laws of India and the Courts in Bengaluru City alone shall have exclusive jurisdiction in this regard, to the extent permissible under the Arbitration and Conciliation Act, 1996. Non-acceptance to this Clause will amount to rejection of the Tender. Yes / No / Explain 26 Company postal address along with Email ID and Ph No. Yes / No / Explain 27 In case a bidder is an MSE, registered under NSIC or any other Government Agencies and would like to avail exemptions, offer should be accompanied with necessary registration certificate with declaration to consider their offer. Quotation received without such declaration and valid registration certificate will not be considered for exemptions under the Public Procurement Policy. Yes / No / Explain 28 Do you have Unique GeM Seller ID? If YES, provide details If NO, As per Office Memorandum No 6/9/2020-PPD dated 24/08/2020 of Department of Expenditure, it shall be mandatory for sellers providing Goods and Services to Central Government Organizations to be registered on GeM and obtain a Unique GeM Seller ID, at the time of Placement of Order/acceptance of contract. Tenderers shall ensure the same. Yes / No / Explain 29 Please refer the following OMs/orders issued by Govt. of India while submitting the bid: (i) No. P-45021/2/2017-PP (BE-II) dated 16.09.2020 (ii) F.No.6/18/2019-PPD (Public Procurement No.1) dated 23.07.2020 (iii) F.No.6/18/2019-PPD (Public Procurement No.2) dated 23.07.2020 and (iv) F.No.6/18/2019-PPD (Public Procurement No.3) dated 24.07.2020. All the provisions mentioned in the above OMs/orders shall be complied. If any deviation from the above OMs/order, your offer will be liable for rejection. All Bidders fulfilling the above orders, shall submit a valid registration certificate made with DPIIT, without which the offer shall not be considered. Yes / No / Explain Tender No : URSC/CE/IS202300068501 Page 53 of 54 C.3 Price Bid 30 Please refer the following OMs/orders issued by Govt. of India while submitting the bid: (i) No. P- 45021/2/2017-PP (BE-II) dated 16.09.2020 (ii) F.No.6/18/2019-PPD (Public Procurement No.1) dated 23.07.2020 (iii) F.No.6/18/2019-PPD (Public Procurement No.2) dated 23.07.2020 and (iv) F.No.6/18/2019- PPD (Public Procurement No.3) dated 24.07.2020. All the provisions mentioned in the above OMs/orders shall be complied. If any deviation from the above OMs/order, your offer will be liable for rejection. All Bidders fulfilling the above orders, shall submit a valid registration certificate made with DPIIT, without which the offer shall not be considered. Yes / No / Explain 31 Country of Origin of quoted items. Adherence and acceptance to this Clause is Compulsory or otherwise the Tender will be rejected. Yes / No / Explain 32 [For Local Vendors] Based on the GOI order dated 16.09.2020 as mentioned at Sl. No. 27 above, provide declaration in Company Letter head indicating the following: a) Percentage of Local Content in the quoted items alongwith its break-up (in percentage only). It may be noted that Local Content shall not include services such as Transportation, Insurance, Installation, Commissioning, Training and after sales service support like AMC/CMC etc. Yes / No / Explain 33 b) Details of the location(s) at which the local value addition is made Yes / No / Explain 1 CHOTHERM SHEETS PYROLYTIC GRAPHITE ROLL 175.00 m