West Bengal Power Development Corporation Limited has published Tender For Rate Contract For Different Mechanical Maintenance Jobs At Chp, Ktps For Two Years. Submission Date for this Tender is 16-10-2023. Mechanical engineering Service Tenders in Medinipur East West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 10-Oct-2023 | Extension | Date | 16-10-2023 |
Sl. No. | Item Description |
1 | Schedule Maint of Crusher |
2 | Replacement of Crusher bearing (NDE.) |
3 | Replacement of Crusher bearing (DE.) |
4 | Replacement of crusher hood. |
5 | Replacement of Stg-I crusher Screen Plate(2 no) |
6 | Replacement of Stg.-I Crusher breaker plate |
7 | Replacement of hammer set (52 nos.) in Stg-I crusher |
8 | Crusher hammer insert at Stg-I crusher (upto 5 nos) |
9 | Replacement of hammer set (156 nos.)in Stg-II crusher. |
10 | Replacement of cage bars at Stg-II crusher |
11 | Replacement of both the breaker plates of Stg-II crusher |
12 | Replacement of one no. breaker plates of Stg-II crusher |
13 | Insertion of Stg-II crusher hammers ( upto 5 nos.). |
14 | Replacement of both sides cage bars at Stg-II crusher (full set). |
15 | Major Maint /Repair of CRUSHER |
16 | Alignment of crusher motor, fitting of F C U. |
17 | Motor, gear box alignment, fitting of F C U etc. |
18 | Replacement of one no.F C U at Con-3A/ B/C/D, 8A/B/C/D. |
19 | Replacement of one no. F C U for the conveyors except Con. No.3 & 8. |
20 | Repair/servicing of one no. F C U (big size). |
21 | Repair/servicing of one no. F C U (medium & small size). |
22 | Schedule/Gear Box & F.C.U. Bolt tightness checking, Gear Coupling & Gear Box teeth checking & Greasing. |
23 | Schedule of Wagon Tippler |
24 | Replacement of hydraulic cylinder of WT |
25 | Wagon tippler brake shoe replacement. |
26 | Wagon tippler brake drum replacement. |
27 | Wagon tippler motor coupling bush replacement |
28 | WT Hydraulic Cylinder servicing |
29 | Replacement all Deck Sheet at one no upper holding Beam. |
30 | Repairing of Upper holding Beam |
31 | Schedule checking of Stacker-Cum-Reclaimer (including Oil top-up, belt & break adjustment, minor repairing etc.) |
32 | Replacement of drive pulley boom conveyor. |
33 | Replacement of L.T. Gear Box. |
34 | Replacement of new/repair slew gear box at that position and necessary adjustment. |
35 | SR – 1, 2, 3 L.T. Motor/ILMS Motor alignement & coupling |
36 | Replacement / refitting of Bucket for Stacker – Cum-Reclaimer. |
37 | Schedule Maint/Minor Maint of Paddle Feeder |
38 | Paddle feeder axle fitting, fixing and alignment. |
39 | Replacement of one no. Plouh blade of PF |
40 | Removal of obstruction at paddle blade |
41 | Sprocket of PF removal & fixing |
42 | Repairing of Plough Blade |
43 | Removal of damaged axel, shifting & positioning of including Readyness MT-1,2,3&4. |
44 | Schedule Maint/Minor Maint. of Mobile Tripper |
45 | Four nos. bearing replacement at Track hopper vibrators. |
46 | Cross strut(Tie pipe) replacement at VFD-49 to 52. |
47 | Replacement of two nos. of vibrating Screen perforated plates. |
48 | Replacement of one no. bearing of vibrating Screen. |
49 | Repair of vibrating screen perforated plate (1 no.). |
50 | Feed box replacement/ refitting at VS live frame. |
51 | Replacement of Drive shaft of VS. |
52 | Repairing of body of VS including ISMB, perforated plate, hood ,Checking of base bolt and replacement |
53 | Replacement of Gear box & drum (including base structure.) |
54 | Replacement of gear coupling including Ready ness |
55 | Replacement of input bevel pinion shaft assembly of a 3 stage gear box |
56 | Total servicing at a slew gear box. |
57 | Total servicing of 3 stage gear box. |
58 | Input Gear Box Oil Seal Changes |
59 | Replacement of gear box of Conveyor including alignment work. |
60 | Replacement of gear box Con 4,5,6 including alignment work. |
61 | Schedule Maint (including major repairing ) of CBMS / ILMS |
62 | Both side Bearing of ILMS/CBMS- Replacement |
63 | Driving End Pulleyof ILMS/CBMS- Replacement |
64 | Non drive Pulley of ILMS/CBMS - Replacement |
65 | Flapgate Overhauling including base & flap gate fabrication, erection, erection & commissioning. |
66 | Servicing & Replacement of Flap gate actuator. |
67 | Repairing of damaged mother & liner plate, supporting elements of frame of flap gate. N |
68 | Replacement of Seating Angle & Deflector plate at FG-1 /17(one side) |
69 | Replacement of bearings of conveyor pulley/fitting of bearings at new pully (2 nos. of brgs.). |
70 | Replacement of conveyor drive pulley including alignment |
71 | Replacement of drive pulley for SR. boom conveyor including alignment. |
72 | Replacement of chute deflector plate |
73 | Replacement of rubbe pad ( 4 nos.) of wagon tippler holding beam |
74 | Rail-line for PF/MT /WT maintenance ( Guage checking, New clamp fitting etc.)(M) |
75 | Key preparing/ Key way repair |
76 | Adjustment of brake at paddle feeder, mobile tippler,SR &WT. |
77 | Adjustment of conv. Belt, RBFD, Belt feeder. |
78 | Hold Back removal & fixing. |
79 | Oil top up/oil replacement ( 01 to 50liters) |
80 | HS coupling bolt and bush replacement |
81 | Suspension bar locking per bar. |
82 | Greasing of both the bearing of Conveyor Drum with bearingclearance measurement. |
83 | R.P.G opening and closing. |
84 | Coupling & Decoupling of equipments. |
85 | Flap gate actuator arm pin removal & fixing. |
86 | Chain & Belt of ILMS/CBMS- Adjustment |
87 | WT Hydraulic Line Straineer Cleanning/pump couplig change/Pressure adjustment |
88 | WT Hydraulic station Pr. Relief valve replacement &Pressure adjustment |
89 | Hose/pipe replacement & clamp fixing (one) |
90 | Greasing of both the bearing of CBMS / ILMS / Conduit Roller / Impact Roller |
91 | Crusher rotor locknut tightening./Cr. Brg. Lock nut tightening.(per crusher) |
92 | Torque tightness checking of VFD-49/50/51/52. |
93 | Observation/ Checking of equipment, Conv. Belt etc |
94 | Structure repairing(Minor)/Any type of minor repairing or maintenance. |
95 | Foreign material removal fom Paddle Feeder/Crusher |
96 | ‘V’ Belt set replacement (one set) |
97 | Back plate removal & fixing. |
98 | PCRD/CCRD guide roller repair replacement (per roller). |
99 | Chute chocking removal |
100 | Chute flange joint leakage sealing/arresting by welding. |
101 | V.S. hinge bush block replacement. |
102 | PF/Tripper/S/R-crack & broken wheel repairing. |
103 | Welding of rail/conveyor short support/stringer post/ladder repair. |
104 | WT Hydraulic Pump replacement /commissioning/pump coupling change/Oil filtration |
105 | WT Hydraulic Pump replacement /commissioning/pump coupling change/Oil filtration |
106 | Dust sealing (Door/Flange) job at VS/ Crusher by flange bolt tightening / replacement with asbestos rope etc. |
107 | Hard Facing of Suspention Arm, End Disc etc of Crusher ( Special weldin Rod will be supllied by WBPDCL) |
108 | Replacement of Rail-line for PF/MT /WT per Meter |
109 | Replacement /repair & fitting of chain of C.B.M.S., ILMS, S-R, P.F., M.T. etc |
110 | Operation assitant for Eveing & Night Shift |
111 | Replacement of new or reconditioned two nos. of bracket (including roller)/ 7nos. Carrier/6 nos. Impact Idlers or 3 nos. of Return roller ( including clit) at conveyor. |
112 | Repair of diaphragm by welding etc.of pulley at both sides. |
113 | Fabrication of bucket wheel for SR |
114 | Cleaning of VFD tray/VS |
115 | Misc. tit-bit repairing/ maintenance. |
116 | Renewal/replacement of damaged conveyor structural or support by fabication & erection of stringer channel, leg post, cross bracing, splice plates at CHP. |
117 | Fabrication of Leg post for Lateral holding beam of wagon - tippler 1 & 2. |
118 | Fabrication of vertical & horizental Hydrulic cylinder base for wagon tippler 1 & 2 |
119 | Renewal/repair work of damaged chute plate by 20/16/12 mm thk MS plate at different transfer point chute. |
120 | Fitting of 8/10 /12mm thk had field steel liner plate |
121 | Fabrication, dismantling and erection of complete flap gate and repairing/renewal of damaged mother & liner plates supporting elements of frame of flap gate including FG-1 & FG-17 at CHP. |
122 | Schedule maintenance of AIR Compressor |
123 | Repair/replacement of metat pipe of hydraulic system of W/T |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail