Tender For Rate Contract For Different Mechanical Maintenance Jobs At Chp, Ktps For Two Years, Medinipur East-West Bengal

West Bengal Power Development Corporation Limited has published Tender For Rate Contract For Different Mechanical Maintenance Jobs At Chp, Ktps For Two Years. Submission Date for this Tender is 16-10-2023. Mechanical engineering Service Tenders in Medinipur East West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

39545964
Corrigendum : Tender For Rate Contract For Different Mechanical Maintenance Jobs At Chp, Ktps For Two Years
Open Tender
Indian
West Bengal
Medinipur East
16-10-2023

Tender Details

Tender For Rate Contract For Different Mechanical Maintenance Jobs At Chp, Ktps For Two Years-2 Replacement Of Crusher Bearing ( Nde. ) 3 Replacement Of Crusher Bearing ( De. ) 4 Replacement Of Crusher Hood. 5 Replacement Of Stg-I Crusher Screen Plate ( 2 No ) 6 Replacement Of Stg.-I Crusher Breaker Plate 7 Replacement Of Hammer Set ( 52 Nos. ) In Stg-I Crusher 8 Crusher Hammer Insert At Stg-I Crusher ( Upto 5 Nos ) 9 Replacement Of Hammer Set ( 156 Nos. ) In Stg-Ii Crusher. 10 Replacement Of Cage Bars At Stg-Ii Crusher 11 Replacement Of Both The Breaker Plates Of Stg-Ii Crusher 12 Replacement Of One No. Breaker Plates Of Stg-Ii Crusher 13 Insertion Of Stg-Ii Crusher Hammers ( Upto 5 Nos. ) . 14 Replacement Of Both Sides Cage Bars At Stg-Ii Crusher ( Full Set ) . 15 Major Maint / Repair Of Crusher 16 Alignment Of Crusher Motor, Fitting Of F C U. 17 Motor, Gear Box Alignment, Fitting Of F C U Etc. 18 Replacement Of One No.F C U At Con-3A / B / C / D, 8A / B / C / D. 19 Replacement Of One No. F C U For The Conveyors Except Con. No.3 & 8. 20 Repair / Servicing Of One No. F C U ( Big Size ) . 21 Repair / Servicing Of One No. F C U ( Medium & Small Size ) . 22 Schedule / Gear Box & F.C.U. Bolt Tightness Checking, Gear Coupling & Gear Box Teethchecking & Greasing. 23 Schedule Of Wagon Tippler 24 Replacement Of Hydraulic Cylinder Of Wt 25 Wagon Tippler Brake Shoe Replacement. 26 Wagon Tippler Brake Drum Replacement. 27 Wagon Tippler Motor Coupling Bush Replacement 28 Wt Hydraulic Cylinder Servicing 29 Replacement All Deck Sheet At One No Upper Holding Beam. 30 Repairing Of Upper Holding Beam 31 Schedule Checking Of Stacker-Cum-Reclaimer ( Including Oil Top-Up, Belt & Break Adjustment, Minor Repairing Etc. ) 32 Replacement Of Drive Pulley Boom Conveyor. 33 Replacement Of L.T. Gear Box. 34 Replacement Of New / Repair Slew Gear Box At That Position And Necessary Adjustment. 35 Sr – 1, 2, 3 L.T. Motor / Ilms Motor Alignement & Coupling 36 Replacement / Refitting Of Bucket For Stacker – Cum-Reclaimer. 37 Schedule Maint / Minor Maint Of Paddle Feeder 38 Paddle Feeder Axle Fitting, Fixing And Alignment. 39 Replacement Of One No. Plouh Blade Of Pf 40 Removal Of Obstruction At Paddle Blade 41 Sprocket Of Pf Removal & Fixing 42 Repairing Of Plough Blade 43 Removal Of Damaged Axel, Shifting & Positioning Of Including Readyness Mt-1, 2, 3&4. 44 Schedule Maint / Minor Maint. Of Mobile Tripper 45 Four Nos. Bearing Replacement At Track Hopper Vibrators. 46 Cross Strut ( Tie Pipe ) Replacement At Vfd-49 To 52. 47 Replacement Of Two Nos. Of Vibrating Screen Perforated Plates. 48 Replacement Of One No. Bearing Of Vibrating Screen. 49 Repair Of Vibrating Screen Perforated Plate ( 1 No. ) . 50 Feed Box Replacement / Refitting At Vs Live Frame. 51 Replacement Of Drive Shaft Of Vs. 52 Repairing Of Body Of Vs Including Ismb, Perforated Plate, Hood , Checking Of Base Bolt And Replacement 53 Replacement Of Gear Box & Drum ( Including Base Structure. ) 54 Replacement Of Gear Coupling Including Ready Ness 55 Replacement Of Input Bevel Pinion Shaft Assembly Of A 3 Stage Gear Box 56 Total Servicing At A Slew Gear Box. 57 Total Servicing Of 3 Stage Gear Box. 58 Input Gear Box Oil Seal Changes 59 Replacement Of Gear Box Of Conveyor Including Alignment Work. 60 Replacement Of Gear Box Con 4, 5, 6 Including Alignment Work. 61 Schedule Maint ( Including Major Repairing ) Of Cbms / Ilms 62 Both Side Bearing Of Ilms / Cbms- Replacement 63 Driving End Pulleyof Ilms / Cbms- Replacement 64 Non Drive Pulley Of Ilms / Cbms - Replacement 65 Flapgate Overhauling Including Base & Flap Gate Fabrication, Erection, Erection &Commissioning. 66 Servicing & Replacement Of Flap Gate Actuator. 67 Repairing Of Damaged Mother & Liner Plate, Supporting Elements Of Frame Of Flap Gate. N 68 Replacement Of Seating Angle & Deflector Plate At Fg-1 / 17 ( One Side ) 69 Replacement Of Bearings Of Conveyor Pulley / Fitting Of Bearings At New Pully ( 2 Nos. Of Brgs. ) . 70 Replacement Of Conveyor Drive Pulley Including Alignment 71 Replacement Of Drive Pulley For Sr. Boom Conveyor Including Alignment. 72 Replacement Of Chute Deflector Plate 73 Replacement Of Rubbe Pad ( 4 Nos. ) Of Wagon Tippler Holding Beam 74 Rail-Line For Pf / Mt / Wt Maintenance ( Guage Checking, New Clamp Fitting Etc. ) ( M ) 75 Key Preparing / Key Way Repair 76 Adjustment Of Brake At Paddle Feeder, Mobile Tippler, Sr &Wt. 77 Adjustment Of Conv. Belt, Rbfd, Belt Feeder. 78 Hold Back Removal & Fixing. 79 Oil Top Up / Oil Replacement ( 01 To 50Liters ) 80 Hs Coupling Bolt And Bush Replacement 81 Suspension Bar Locking Per Bar. 82 Greasing Of Both The Bearing Of Conveyor Drum With Bearingclearance Measurement. 83 R.P.G Opening And Closing. 84 Coupling & Decoupling Of Equipments. 85 Flap Gate Actuator Arm Pin Removal & Fixing. 86 Chain & Belt Of Ilms / Cbms- Adjustment 87 Wt Hydraulic Line Straineer Cleanning / Pump Couplig Change / Pressure Adjustment 88 Wt Hydraulic Station Pr. Relief Valve Replacement &Pressure Adjustment 89 Hose / Pipe Replacement & Clamp Fixing ( One ) 90 Greasing Of Both The Bearing Of Cbms / Ilms / Conduit Roller / Impact Roller 91 Crusher Rotor Locknut Tightening. / Cr. Brg. Lock Nut Tightening. ( Per Crusher ) 92 Torque Tightness Checking Of Vfd-49 / 50 / 51 / 52. 93 Observation / Checking Of Equipment, Conv. Belt Etc 94 Structure Repairing ( Minor ) / Any Type Of Minor Repairing Or Maintenance. 95 Foreign Material Removal Fom Paddle Feeder / Crusher 96 ‘V’ Belt Set Replacement ( One Set ) 97 Back Plate Removal & Fixing. 98 Pcrd / Ccrd Guide Roller Repair Replacement ( Per Roller ) . 99 Chute Chocking Removal 100 Chute Flange Joint Leakage Sealing / Arresting By Welding. 101 V.S. Hinge Bush Block Replacement. 102 Pf / Tripper / S / R-Crack & Broken Wheel Repairing. 103 Welding Of Rail / Conveyor Short Support / Stringer Post / Ladder Repair. 104 Wt Hydraulic Pump Replacement / Commissioning / Pump Coupling Change / Oil Filtration 105 Wt Hydraulic Pump Replacement / Commissioning / Pump Coupling Change / Oil Filtration 106 Dust Sealing ( Door / Flange ) Job At Vs / Crusher By Flange Bolt Tightening / Replacement Withasbestos Rope Etc. 107 Hard Facing Of Suspention Arm, End Disc Etc Of Crusher ( Special Weldin Rod Will Be Suplliedby Wbpdcl ) 108 Replacement Of Rail-Line For Pf / Mt / Wt Per Meter 109 Replacement / Repair & Fitting Of Chain Of C.B.M.S., Ilms, S-R, P.F., M.T. Etc 110 Operation Assitant For Eveing & Night Shift 111 Replacement Of New Or Reconditioned Two Nos. Of Bracket ( Including Roller ) / 7Nos. Carrier / 6Nos. Impact Idlers Or 3 Nos. Of Return Roller ( Including Clit ) At Conveyor. 112 Repair Of Diaphragm By Welding Etc.Of Pulley At Both Sides. 113 Fabrication Of Bucket Wheel For Sr 114 Cleaning Of Vfd Tray / Vs 115 Misc. Tit-Bit Repairing / Maintenance. 116 Renewal / Replacement Of Damaged Conveyor Structural Or Support By Fabication & Erection Ofstringer Channel, Leg Post, Cross Bracing, Splice Plates At Chp. 117 Fabrication Of Leg Post For Lateral Holding Beam Of Wagon - Tippler 1 & 2. 118 Fabrication Of Vertical & Horizental Hydrulic Cylinder Base For Wagon Tippler 1 & 2 119 Renewal / Repair Work Of Damaged Chute Plate By 20 / 16 / 12 Mm Thk Ms Plate At Differenttransfer Point Chute. 120 Fitting Of 8 / 10 / 12Mm Thk Had Field Steel Liner Plate 121 Fabrication, Dismantling And Erection Of Complete Flap Gate And Repairing / Renewal Ofdamaged Mother & Liner Plates Supporting Elements Of Frame Of Flap Gate Including Fg-1 &Fg-17 At Chp. 122 Schedule Maintenance Of Air Compressor 123 Repair / Replacement Of Metat Pipe Of Hydraulic System Of W / T

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 10-Oct-2023 Extension Date 16-10-2023

Key Value

Document Fees
Refer document
EMD
INR 1149529.0 /-
Tender Value
INR 5.74 Crore /-

BOQ Items

Name of Work: Annual Rate Contract for different Mechanical maintenance jobs at CHP, KTPS
Sl. No. Item Description
1Schedule Maint of Crusher
2Replacement of Crusher bearing (NDE.)
3Replacement of Crusher bearing (DE.)
4Replacement of crusher hood.
5Replacement of Stg-I crusher Screen Plate(2 no)
6Replacement of Stg.-I Crusher breaker plate
7Replacement of hammer set (52 nos.) in Stg-I crusher
8Crusher hammer insert at Stg-I crusher (upto 5 nos)
9Replacement of hammer set (156 nos.)in Stg-II crusher.
10Replacement of cage bars at Stg-II crusher
11Replacement of both the breaker plates of Stg-II crusher
12Replacement of one no. breaker plates of Stg-II crusher
13Insertion of Stg-II crusher hammers ( upto 5 nos.).
14Replacement of both sides cage bars at Stg-II crusher (full set).
15Major Maint /Repair of CRUSHER
16Alignment of crusher motor, fitting of F C U.
17Motor, gear box alignment, fitting of F C U etc.
18Replacement of one no.F C U at Con-3A/ B/C/D, 8A/B/C/D.
19Replacement of one no. F C U for the conveyors except Con. No.3 & 8.
20Repair/servicing of one no. F C U (big size).
21Repair/servicing of one no. F C U (medium & small size).
22Schedule/Gear Box & F.C.U. Bolt tightness checking, Gear Coupling & Gear Box teeth checking & Greasing.
23Schedule of Wagon Tippler
24Replacement of hydraulic cylinder of WT
25Wagon tippler brake shoe replacement.
26Wagon tippler brake drum replacement.
27Wagon tippler motor coupling bush replacement
28WT Hydraulic Cylinder servicing
29Replacement all Deck Sheet at one no upper holding Beam.
30Repairing of Upper holding Beam
31Schedule checking of Stacker-Cum-Reclaimer (including Oil top-up, belt & break adjustment, minor repairing etc.)
32Replacement of drive pulley boom conveyor.
33Replacement of L.T. Gear Box.
34Replacement of new/repair slew gear box at that position and necessary adjustment.
35SR – 1, 2, 3 L.T. Motor/ILMS Motor alignement & coupling
36Replacement / refitting of Bucket for Stacker – Cum-Reclaimer.
37Schedule Maint/Minor Maint of Paddle Feeder
38Paddle feeder axle fitting, fixing and alignment.
39Replacement of one no. Plouh blade of PF
40Removal of obstruction at paddle blade
41Sprocket of PF removal & fixing
42Repairing of Plough Blade
43Removal of damaged axel, shifting & positioning of including Readyness MT-1,2,3&4.
44Schedule Maint/Minor Maint. of Mobile Tripper
45Four nos. bearing replacement at Track hopper vibrators.
46Cross strut(Tie pipe) replacement at VFD-49 to 52.
47Replacement of two nos. of vibrating Screen perforated plates.
48Replacement of one no. bearing of vibrating Screen.
49Repair of vibrating screen perforated plate (1 no.).
50Feed box replacement/ refitting at VS live frame.
51Replacement of Drive shaft of VS.
52Repairing of body of VS including ISMB, perforated plate, hood ,Checking of base bolt and replacement
53Replacement of Gear box & drum (including base structure.)
54Replacement of gear coupling including Ready ness
55Replacement of input bevel pinion shaft assembly of a 3 stage gear box
56Total servicing at a slew gear box.
57Total servicing of 3 stage gear box.
58Input Gear Box Oil Seal Changes
59Replacement of gear box of Conveyor including alignment work.
60Replacement of gear box Con 4,5,6 including alignment work.
61Schedule Maint (including major repairing ) of CBMS / ILMS
62Both side Bearing of ILMS/CBMS- Replacement
63Driving End Pulleyof ILMS/CBMS- Replacement
64Non drive Pulley of ILMS/CBMS - Replacement
65Flapgate Overhauling including base & flap gate fabrication, erection, erection & commissioning.
66Servicing & Replacement of Flap gate actuator.
67Repairing of damaged mother & liner plate, supporting elements of frame of flap gate. N
68Replacement of Seating Angle & Deflector plate at FG-1 /17(one side)
69Replacement of bearings of conveyor pulley/fitting of bearings at new pully (2 nos. of brgs.).
70Replacement of conveyor drive pulley including alignment
71Replacement of drive pulley for SR. boom conveyor including alignment.
72Replacement of chute deflector plate
73Replacement of rubbe pad ( 4 nos.) of wagon tippler holding beam
74Rail-line for PF/MT /WT maintenance ( Guage checking, New clamp fitting etc.)(M)
75Key preparing/ Key way repair
76Adjustment of brake at paddle feeder, mobile tippler,SR &WT.
77Adjustment of conv. Belt, RBFD, Belt feeder.
78Hold Back removal & fixing.
79Oil top up/oil replacement ( 01 to 50liters)
80HS coupling bolt and bush replacement
81Suspension bar locking per bar.
82Greasing of both the bearing of Conveyor Drum with bearingclearance measurement.
83R.P.G opening and closing.
84Coupling & Decoupling of equipments.
85Flap gate actuator arm pin removal & fixing.
86Chain & Belt of ILMS/CBMS- Adjustment
87WT Hydraulic Line Straineer Cleanning/pump couplig change/Pressure adjustment
88WT Hydraulic station Pr. Relief valve replacement &Pressure adjustment
89Hose/pipe replacement & clamp fixing (one)
90Greasing of both the bearing of CBMS / ILMS / Conduit Roller / Impact Roller
91Crusher rotor locknut tightening./Cr. Brg. Lock nut tightening.(per crusher)
92Torque tightness checking of VFD-49/50/51/52.
93Observation/ Checking of equipment, Conv. Belt etc
94Structure repairing(Minor)/Any type of minor repairing or maintenance.
95Foreign material removal fom Paddle Feeder/Crusher
96‘V’ Belt set replacement (one set)
97Back plate removal & fixing.
98PCRD/CCRD guide roller repair replacement (per roller).
99Chute chocking removal
100Chute flange joint leakage sealing/arresting by welding.
101V.S. hinge bush block replacement.
102PF/Tripper/S/R-crack & broken wheel repairing.
103Welding of rail/conveyor short support/stringer post/ladder repair.
104WT Hydraulic Pump replacement /commissioning/pump coupling change/Oil filtration
105WT Hydraulic Pump replacement /commissioning/pump coupling change/Oil filtration
106Dust sealing (Door/Flange) job at VS/ Crusher by flange bolt tightening / replacement with asbestos rope etc.
107Hard Facing of Suspention Arm, End Disc etc of Crusher ( Special weldin Rod will be supllied by WBPDCL)
108Replacement of Rail-line for PF/MT /WT per Meter
109Replacement /repair & fitting of chain of C.B.M.S., ILMS, S-R, P.F., M.T. etc
110Operation assitant for Eveing & Night Shift
111Replacement of new or reconditioned two nos. of bracket (including roller)/ 7nos. Carrier/6 nos. Impact Idlers or 3 nos. of Return roller ( including clit) at conveyor.
112Repair of diaphragm by welding etc.of pulley at both sides.
113Fabrication of bucket wheel for SR
114Cleaning of VFD tray/VS
115Misc. tit-bit repairing/ maintenance.
116Renewal/replacement of damaged conveyor structural or support by fabication & erection of stringer channel, leg post, cross bracing, splice plates at CHP.
117Fabrication of Leg post for Lateral holding beam of wagon - tippler 1 & 2.
118Fabrication of vertical & horizental Hydrulic cylinder base for wagon tippler 1 & 2
119Renewal/repair work of damaged chute plate by 20/16/12 mm thk MS plate at different transfer point chute.
120Fitting of 8/10 /12mm thk had field steel liner plate
121Fabrication, dismantling and erection of complete flap gate and repairing/renewal of damaged mother & liner plates supporting elements of frame of flap gate including FG-1 & FG-17 at CHP.
122Schedule maintenance of AIR Compressor
123Repair/replacement of metat pipe of hydraulic system of W/T
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail