Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Works Contract For Vembadithalam & Attayampatty Sub Divisions In South/O&M Division. Submission Date for this Tender is 20-09-2023. Tree Cutting Tenders in salem Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Excavation of Pole/Stay pits |
2 | Excavation of pole pit up to 27”(8.0m) pole |
3 | Stay bit 4.5” to 5” depth |
4 | Excavation of pole pit up to 9.14 mtr pole |
5 | Hard Rock requires without blasting |
6 | Medium rock and debse medium rock requires blasting |
7 | Erection of poles. |
8 | RCC poles/Metal pole up to 8.00m (27’) |
9 | RCCpoles/Metal pole up to 9.14.m(30’) (300 kg) |
10 | Erection of stay set complete |
11 | Fixing of line materials |
12 | HT VCross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2 |
13 | LT 3 Phase cross arm |
14 | LT single Phase cross arm |
15 | HT / LTTI Fitting |
16 | Fixing of HT Pin Insulators (11/22 KV) |
17 | Fixing of HT 11KV stain disc |
18 | Fixing of HT 22KV stain disc |
19 | Fixing of LT Pin Insulators |
20 | Fixing of LT Shackle |
21 | Fixing of Knob |
22 | Labour charges for alteration of Back clamps/ Stay clamps to suit for the works |
23 | Earthing of poles |
24 | Paving and Stringing of conductor |
25 | ACSR 7/4.09mm Raccoon conductor |
26 | 7/3.35mm ACSR 7/3.15mm AAAC (Per wire per span) |
27 | 7/2.59mm ACSR &7/2.50mm AAAC (Per wire per span) |
28 | Structure Erection |
29 | Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos, Earth pits with tubes including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle including concreting (Except erection of transformer) |
30 | Erection of single pole structure |
31 | Erection of DP Structure with AB switch, Top channel, Cross Bracing, Earthing, Painting, Providing stay and concreting. |
32 | Transporting of Poles |
33 | Transport of Poles/Materials/Conductors and other materials (excluding loading and unloading charges) below 8 kms (Plains) |
34 | Above 8 Kms. For additional Km. |
35 | Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual upto 100m. |
36 | Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m. |
37 | Loading & Unloading of Poles. |
38 | Loading of poles upto 27" |
39 | Loading of poles upto 30" |
40 | Loading of Metal poles (All sizes) |
41 | Unloading of poles upto 27" |
42 | Unloading of poles upto 30" |
43 | Unloading of Metal poles (All sizes) |
44 | Loading of Materials |
45 | Unloading of Materials |
46 | Services Connections. |
47 | Releasing of Single phase service wire and refixing. |
48 | Releasing of Three phase service wire and refixing. |
49 | Erection of street light including fixure fitting |
50 | Dismantling of Line Materials |
51 | Dismantling of transformer structure set |
52 | Dismantling of Single Pole Structre set |
53 | Dismantling of DP Structure with AB switch ,Top Channel , Cross Bracing ,Earthing , Painting , stay and Concreting |
54 | Dismantling of pole (9.0m and above). |
55 | Dismantling of pole (7.5m and 8.0mtr). |
56 | Dismantling of pole & pole pitand loading unloading of grills(9.0mtr & above) |
57 | Dismantling of pole & pole pitand loading unloading of grills(7.5mtr & 8mtr) |
58 | Dismantling ofHT pin Insulator |
59 | Dismantling of HT/LT TI Fitting |
60 | Dismantling of 11 KV Strain Disc |
61 | Dismantling of 22 KV Strain Disc |
62 | Dismantling of LT 3 Phase X arm |
63 | Dismantling of Tapping X arm, HT V Cross arms/ Channel Cross arms / Guarding cross arm |
64 | Dismantling of 1 PH X arm |
65 | Dismantling of Alu Knob |
66 | Dismantling ofLT pin Insulator |
67 | Dismantling of LT Shackle Insulator |
68 | Dismantling of Stay set complete |
69 | Dismantlingof ACSR 7/4.09mm |
70 | Dismantlingof ACSR 7/3.35mm |
71 | Dismantlingof ACSR 7/2.59mm & 7/2.11mm ACSR conductor |
72 | Loading or unloading of transformer above 100 and upto 200 KVA |
73 | Loading or unloading of transformer above 200 KVA. |
74 | Erection of New Transformer all capacities (with Jumpering) |
75 | Erection of HT metering set |
76 | Replacement of failed transformers all capacities. |
77 | Dismantling of Transformer Stureset |
78 | Re-stringing of ACSR 7/3.35mm |
79 | Re-stringing of ACSR 7/2.59mm |
80 | Dismantling of street light including fixture fitting |
81 | Tree cutting |
82 | Releasing of grills from RCC Poles |
83 | Concreting of Poles |
84 | Mass concreting including Materials (Cement + River sand/ M.Sand and Blue metals and watering) |
85 | Sleeve concreting including cost of Materials and labour 375mm x 375mm x 50mm. |
86 | Stay concreting including cost of Materials and labour 375mm x 375mm x 50mm. |
87 | Painting |
88 | Painting of metal poles including cross arms (Excluding cost of paint) |
89 | Numbering of pole with paint with base painting |
90 | Painting of RCC/PSC poles (Colour washing) |
91 | Painting of Transformer (Double coat) |
92 | Painting of HT metering set and box |
93 | Lathe works |
94 | Drilling of hole in channel only 3/4" & 1" |
95 | Cutting of channel |
96 | Cutting of RSJ poles |
97 | Miscellaneous Works. |
98 | Providing LT bus bar arrangement in DT structure loc. |
99 | Erection of New 10" Earth pipe replacing the corroded earth pipe and renewal of earthing including burying looping and binding. |
100 | G.S.T. @18% should be Entered by the Bidder |