Tender For Works Contract For Shevapet Sub Division In West/O&M Division, salem-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Works Contract For Shevapet Sub Division In West/O&M Division. Submission Date for this Tender is 20-09-2023. Tree Cutting Tenders in salem Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

39540322
Tender For Works Contract For Shevapet Sub Division In West/O&M Division
Open Tender
Indian
Tamil Nadu
salem
20-09-2023

Tender Details

Tender For Works Contract For Shevapet Sub Division In West / O&M Division ; 1 Excavation Of Pole / Stay Pits 2 Excavation Of Pole Pit Up To 27” ( 8.0M ) Pole 3 Stay Bit 4.5” To 5” Depth 4 Excavation Of Pole Pit Up To 9.14 Mtr Pole 5 Hard Rock Requires Without Blasting 6 Medium Rock And Debse Medium Rock Reqires Blasting 7 Erection Of Poles. 8 Rcc Poles / Metal Pole Up To 8.00M ( 27’ ) 9 Rccpoles / Metal Pole Up To 9.14.M ( 30’ ) ( 300 Kg ) 10 Erection Of Stay Set Complete 11 Fixing Of Line Materials 12 Ht Vcross Arms / Channel Cross Arms / Guarding Cross Arm 3 1 / 2, 4 1 / 2 13 Lt 3 Phase Cross Arm 14 Lt Single Phase Cross Arm 15 Ht / Ltti Fitting 16 Fixing Of Ht Pin Insulators ( 11 / 22 Kv ) 17 Fixing Of Ht 11Kv Stain Disc 18 Fixing Of Ht 22Kv Stain Disc 19 Fixing Of Lt Pin Insulators 20 Fixing Of Lt Shackle 21 Fixing Of Knob 22 Labour Charges For Alteration Of Back Clamps / Stay Clamps To Suit For The Works 23 Earthing Of Poles 24 Paving And Stringing Of Conductor 25 Acsr 7 / 4.09Mm Raccoon Conductor 26 7 / 3.35Mm Acsr 7 / 3.15Mm Aaac ( Per Wire Per Span ) 27 7 / 2.59Mm Acsr &7 / 2.50Mm Aaac ( Per Wire Per Span ) 28 Structure Erection 29 Erection Of Transformer Structure Complete In All Respects With Wiring Earthing, Fixing Of Open Type Fuse Units, Ht / Lt / Las And Jumpering 3 Nos, Earth Pits With Tubes Including Painting Of Metal Parts, Structure Poles, Fixing Of Top Channel Seating Channel, Belting Angle Including Concreting ( Except Erection Of Transformer ) 30 Erection Of Single Pole Structure 31 Erection Of Dp Structure With Ab Switch, Top Channel, Cross Bracing, Earthing, Painting, Providing Stay And Concreting. 32 Transporting Of Poles 33 Transport Of Poles / Materials / Conductors And Other Materials ( Excluding Loading And Unloading Charges ) Below 8 Kms ( Plains ) 34 Above 8 Kms. For Additional Km. 35 Transporting Of Poles From Road Side To Pole Pit Including Loading And Unloading Of Poles By Using Jcb Or Manual Upto 100M. 36 Transporting Of Poles From Road Side To Pole Pit Including Loading And Unloading Of Poles By Using Jcb Or Manual Beyond 100M. 37 Loading & Unloading Of Poles. 38 Loading Of Poles Upto 27 39 Loading Of Poles Upto 30 40 Loading Of Metal Poles ( All Sizes ) 41 Unloading Of Poles Upto 27 42 Unloading Of Poles Upto 30 43 Unloading Of Metal Poles ( All Sizes ) 44 Loading Of Materials 45 Un-Loading Of Materials 46 Services Connections. 47 Releasing Of Single Phase Service Wire And Refixing. 48 Releasing Of Three Phase Service Wire And Refixing. 49 Erection Of Street Light Including Fixure Fitting 50 Dismantling Of Line Materials 51 Dismantling Of Transformer Structure Set 52 Dismantling Of Single Poletransformer Structure Set 53 Dismantling Of Dp Structure With Ab Switch, Top Channel, Cross Bracing, Earthing, Painting, Providing Stay And Concreting. 54 Dismantling Of Pole ( 9.0M And Above ) . 55 Dismantling Of Pole ( 7.5M And 8.0Mtr ) . 56 Dismantling Of Pole & Pole Pitand Loading Unloading Of Grills ( 9.0Mtr & Above ) 57 Dismantling Of Pole & Pole Pitand Loading Unloading Of Grills ( 7.5Mtr & 8Mtr ) 58 Dismantling Ofht Pin Insulator 59 Dismantling Of Ht / Lt Ti Fitting 60 Dismantling Of 11 Kv Strain Disc 61 Dismantling Of 22 Kv Strain Disc 62 Dismantling Of Lt 3 Phase X Arm 63 Dismantling Of Tapping X Arm, Ht V Cross Arms / Channel Cross Arms / Guarding Cross Arm 64 Dismantling Of 1 Ph X Arm 65 Dismantling Of Alu Knob 66 Dismantling Oflt Pin Insulator 67 Dismantling Of Lt Shackle Insulator 68 Dismantling Of Stay Set Complete 69 Dismantlingof Acsr 7 / 4.09Mm 70 Dismantlingof Acsr 7 / 3.35Mm 71 Dismantlingof Acsr 7 / 2.59Mm & 7 / 2.11Mm Acsr Conductor 72 Loading Or Unloading Of Transformer Above 100 And Upto 200 Kva 73 Loading Or Unloading Of Transformer Above 200 Kva. 74 Erection Of New Transformer All Capacities ( With Jumpering ) 75 Erection Of Ht Metering Set 76 Replacement Of Failed Transformers All Capacities. 77 Dismantling Of Transformer Structure Set 78 Re-Stringing Of Acsr 7 / 3.35Mm 79 Re-Stringing Of Acsr 7 / 2.59Mm 80 Dismantling Of Street Light Including Fixture Fitting 81 Tree Cutting 82 Releasing Of Grills From Rcc Poles 83 Concreting Of Poles 84 Mass Concreting Including Materials ( Cement + River Sand / M.Sand And Blue Metals And Watering ) 85 Sleeve Concreting Including Cost Of Materials And Labour 375Mm X 375Mm X 50Mm. 86 Stay Concreting Including Cost Of Materials And Labour 375Mm X 375Mm X 50Mm. 87 Painting 88 Painting Of Metal Poles Including Cross Arms ( Excluding Cost Of Paint ) 89 Numbering Of Pole With Paint With Base Painting 90 Painting Of Rcc / Psc Poles ( Colour Washing ) 91 Painting Of Transformer ( Double Coat ) 92 Painting Of Ht Metering Set And Box 93 Lathe Works 94 Drilling Of Hole In Channel Only 3 / 4 & 1 95 Cutting Of Channel 96 Cutting Of Rsj Poles 97 Miscellaneous Works. 98 Providing Lt Bus Bar Arrangement In Dt Structure Loc. 99 Erection Of New 10 Earth Pipe Replacing The Corroded Earth Pipe And Renewal Of Earthing Including Burying Looping And Binding. 100 G.S.T. @18% Should Be Entered By The Bidder

Key Value

Document Fees
Refer document
EMD
INR 10000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Works contract for Shevapet Sub Division in West/O&M Division
Sl. No. Item Description
1Excavation of Pole/Stay pits
2Excavation of pole pit up to 27”(8.0m) pole
3Stay bit 4.5” to 5” depth
4Excavation of pole pit up to 9.14 mtr pole
5Hard Rock requires without blasting
6Medium rock and debse medium rock reqires blasting
7Erection of poles.
8RCC poles/Metal pole up to 8.00m (27’)
9RCCpoles/Metal pole up to 9.14.m(30’) (300 kg)
10Erection of stay set complete
11Fixing of line materials
12HT VCross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2
13LT 3 Phase cross arm
14LT single Phase cross arm
15HT / LTTI Fitting
16Fixing of HT Pin Insulators (11/22 KV)
17Fixing of HT 11KV stain disc
18Fixing of HT 22KV stain disc
19Fixing of LT Pin Insulators
20Fixing of LT Shackle
21Fixing of Knob
22Labour charges for alteration of Back clamps/ Stay clamps to suit for the works
23Earthing of poles
24Paving and Stringing of conductor
25ACSR 7/4.09mm Raccoon conductor
267/3.35mm ACSR 7/3.15mm AAAC (Per wire per span)
277/2.59mm ACSR &7/2.50mm AAAC (Per wire per span)
28Structure Erection
29Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos, Earth pits with tubes including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle including concreting (Except erection of transformer)
30Erection of single pole structure
31Erection of DP Structure with AB switch, Top channel, Cross Bracing, Earthing, Painting, Providing stay and concreting.
32Transporting of Poles
33Transport of Poles/Materials/Conductors and other materials (excluding loading and unloading charges) below 8 kms (Plains)
34Above 8 Kms. For additional Km.
35Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual upto 100m.
36Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m.
37Loading & Unloading of Poles.
38Loading of poles upto 27"
39Loading of poles upto 30"
40Loading of Metal poles (All sizes)
41Unloading of poles upto 27"
42Unloading of poles upto 30"
43Unloading of Metal poles (All sizes)
44Loading of materials
45Un-Loading of materials
46Services Connections.
47Releasing of Single phase service wire and refixing.
48Releasing of Three phase service wire and refixing.
49Erection of street light including fixure fitting
50Dismantling of Line Materials
51Dismantling of transformer structure set
52Dismantling of Single poletransformer structure set
53Dismantling of DP Structure with AB switch, Top channel, Cross Bracing, Earthing, Painting, Providing stay and concreting.
54Dismantling of pole (9.0m and above).
55Dismantling of pole (7.5m and 8.0mtr).
56Dismantling of pole & pole pitand loading unloading of grills(9.0mtr & above)
57Dismantling of pole & pole pitand loading unloading of grills(7.5mtr & 8mtr)
58Dismantling ofHT pin Insulator
59Dismantling of HT/LT TI Fitting
60Dismantling of 11 KV Strain Disc
61Dismantling of 22 KV Strain Disc
62Dismantling of LT 3 Phase X arm
63Dismantling of Tapping X arm, HT V Cross arms/ Channel Cross arms / Guarding cross arm
64Dismantling of 1 PH X arm
65Dismantling of Alu Knob
66Dismantling ofLT pin Insulator
67Dismantling of LT Shackle Insulator
68Dismantling of Stay set complete
69Dismantlingof ACSR 7/4.09mm
70Dismantlingof ACSR 7/3.35mm
71Dismantlingof ACSR 7/2.59mm & 7/2.11mm ACSR conductor
72Loading or unloading of transformer above 100 and upto 200 KVA
73Loading or unloading of transformer above 200 KVA.
74Erection of New Transformer all capacities (with Jumpering)
75Erection of HT metering set
76Replacement of failed transformers all capacities.
77Dismantling of transformer structure set
78Re-stringing of ACSR 7/3.35mm
79Re-stringing of ACSR 7/2.59mm
80Dismantling of street light including fixture fitting
81Tree cutting
82Releasing of grills from RCC Poles
83Concreting of Poles
84Mass concreting including Materials (Cement + River sand/ M.Sand and Blue metals and watering)
85Sleeve concreting including cost of Materials and labour 375mm x 375mm x 50mm.
86Stay concreting including cost of Materials and labour 375mm x 375mm x 50mm.
87Painting
88Painting of metal poles including cross arms (Excluding cost of paint)
89Numbering of pole with paint with base painting
90Painting of RCC/PSC poles (Colour washing)
91Painting of Transformer (Double coat)
92Painting of HT metering set and box
93Lathe works
94Drilling of hole in channel only 3/4" & 1"
95Cutting of channel
96Cutting of RSJ poles
97Miscellaneous Works.
98Providing LT bus bar arrangement in DT structure loc.
99Erection of New 10" Earth pipe replacing the corroded earth pipe and renewal of earthing including burying looping and binding.
100G.S.T. @18% should be Entered by the Bidder
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail