|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge, In cement mortar |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge, 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with :- |
| 4 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size), with all leads and lifts carriage complete. |
| 5 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), with all leads and lifts carriage complete. |
| 6 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete. |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete, with all leads and lifts carriage complete. |
| 10 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. |
| 11 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete. |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above or upto plinth level, Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 13 | Engagement of Tractor Trolley for carrying unserviceable material from site upto 1.km. @500/Trip |
| 14 | Providing and fixing PVC drain pipe |
| 15 | Provision for inaguration of the scheme by way of Providing / Laying and engraved granite stone incl. pedestal and other allied items as per direction of Engineer-In-Charge ( Complete Job ) Lum Sum |