Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #39520156

Tender For Operation And Maintenance Of Pumping Stations At Sanchore Lift Distributory, Bhadrai Lift Distributory, Panoriya Lift Distributory For The Year 2023-24

Issued by Government Departments · sanchore, Rajasthan
Tender Value
2.60 Crore
Estimated cost
Bid Submission
15 Sep 2023
0 days left
EMD
5.20 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
sanchore → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Operation And Maintenance Of Pumping Stations At Sanchore Lift Distributory, Bhadrai Lift Distributory, Panoriya Lift Distributory For The Year 2023-24

BOQ

Name of Work:Operation and maintenance of Pumping stations at Sanchore lift distributory, Bhadrai Lift Distributory, Panoriya Lift Distributory for year 2023-24
Sl. No. Item Description
1Operation and maintenance charges for maintaining desire flow atPS-1, PS-2 of sanchore lift distributory, PS-1, PS-2, PS3A, PS3B, PS4, PS5A, PS5B, PS6 of Bhadrai lift distributory and Panoriya Pumping station
2Driver for Pumps
3Supervisor
4Electrician grade-1
5Welder/fitter
6Helper
7Inspection Vehicle such as Jeep
8Beldar/women Cooli/ Chowkidar/Water man / Earth dresser
9Tractor upto 40HP
10Tractor Trolly above 2 cum capacity (without staff) with hydraulic lift
11Diesel Consumption
12Partsincluding Supply, Installation, Testing & Commissioning for O&M work
13Spare for fig-6310-30 (1-stage Discharge bowl bearing
14Spare for fig-6310-30(1-stage Pump shaft 3-7/16
15Spare for fig-6310-30(1-stage) Line shaft
16Spare for fig-6310-30(1-stage) Top shaft
17Spare for fig-6310-30(1-stage) Packing box
18Spare for fig-6310-30(1-stage) Line shaft sleeve
19Packing gland box cap 60 cusec pump
20Packing gland box cap 40 cusec pump
21Link assembly complete set 60 cusec pump
22Link assembly complete set40 cusec pump
23Supply & Replacement of LED Type Indicating Lamps30/110V DC &110/240 Volts AC on existing LT /6.6 KV Panels.
246.6/7.2KV HRC Fuse(25-100Amp)
25HRC Fuse 63 amp (415 Volt, TSS Type/Offset Tag Type,80 kA breaking capacity, IS-13703 )
26Base & Carrier Fuse
27Block Contact 1 NO + 1 NC
28Block Contact 2 NO for Push Button
29Voltmeter 0-8KV SIF 96 MM, 6.6 KV/110 V
30Ammeter (Size CTR & Range will be Indicated at the time of order )
31Push button complete
32Rectifier Bridge 15A, 1000 PIV
33Limit Switch 1 NO + 1NC
34Closing coil 30V DC for 6.6 KV or3.3 KV HT panel
35Insulator 6.6 KV or3.3 KV for HT panel
36Kilo Watt Hour Meter,IS-722(415 Volt,3 Phase)IS:6767
37Current Transformer,IS-2705(415 Volt, 200/5 Amp,3 Phase)
38Ampere meter CTR Type,IS-722(0-200 Amp,415 Volt,3 Phase)IS:6767
39Volt meter(0-500 Volt,415 Volt, 3 Phase)IS:6767
40Ampere selector switch(415 Volt,3 Phase)
41Voltage selector switch(415 Volt,3 Phase)
42On Off Push button (415 Volt, Suitable for 75 HP starter)
43Star Delta Timer Relay(Rz-12) with transformer ,IS- 3231(415 Volt, Suitable for 75 HP starter)
4424 V DC 8 way contactor
45TNC switch
46Motor protection relay
47Master trip relay
48Rotary switches
49Auxiliary Contactor 110VDC/4NO, 4NC
50ADDON Contact 4NO 4NC
51MCB 3Pole for PT supply 110VAC/32A
52MCB 2Pole for PT supply 110VAC/6A
53MCB 1Pole for auxiliary CKT 110VDC/6A
54Panel Illumination lamp with holder
55Local remote Switch
56Power Pack Input 220 VAC/110 Vdc
576.6kv/3.15 Amp PT fuse
58Test Terminal Block for Measuring
59Multi-Function Meter
60ECONOMMY REGISTANCE
61HT Capacitor 6.6 KV or3.3 KV 100 KVAR
62170 KVAR HT capacitor 3-phase 6.6KV or 3.3 KV amp 14.87
63LT Capacitor 3-phase 440Volt
64Providing and fitting of contactor for hoist motor.
65Bearing - 6207
66Refilling of fire extinguisher
67Supply Elec. Shock proof rubber matting 2000x1000x12 mm
68SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Connection Plates 20 HP to 30 HP
69SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Connection Plates 30 HP to 50 HP
70SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Cooling Fan 20 HP to 30 HP
71SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Fan Cover 20 HP to 30 HP
72SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Fan Cover 30 HP to 50 HP
73SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M./SS Gland Guide Bush 20 HP to 30 HP
74SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M./SS Gland Guide Bush 30 HP to 50 HP
75SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft with Sleeve Chuck Nut20 HP to 30 HP
76SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft with Sleeve Chuck Nut30 HP to 50 HP
77SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft Chuck Nut20 HP to 30 HP
78SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft Chuck Nut 30 HP to 50 HP
79SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Neck Ring20 HP to 30 HP
80SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Neck Ring 30 HP to 50 HP
81SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Bush Shaft Sleeve of G.M.20 HP to 30 HP
82SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Bush Shaft Sleeve of G.M. 30 HP to 50 HP
83SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Gland Cover20 HP to 30 HP
84SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Gland Cover30 HP to 50 HP
85SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) S.S. Shaft (Non Magnetic)20 HP to 30 HP
86SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) S.S. Shaft (Non Magnetic)30 HP to 50 HP
87SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Shaft Sleeve Check Nut 20 HP to 30 HP
88SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Shaft Sleeve Check Nut 30 HP to 50 HP
89SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) M.S. Shaft Check Nut 20 HP to 30 HP
90SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) M.S. Shaft Check Nut 30 HP to 50 HP
91SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Cooling pipe set with nozzle & Nut 20 HP to 30 HP
92SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Cooling pipe set with nozzle & Nut 30 HP to 50 HP
93SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) AIR Cock 20 HP to 30 HP
94SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) AIR Cock30 HP to 50 HP
95JOB WORK FOR REPAIR OF PUMP MOTOR Bearing Housing (rebuilding, turning & finishing) 20 HP to 30 HP
96JOB WORK FOR REPAIR OF PUMP MOTOR Bearing Housing (rebuilding, turning & finishing) 30 HP to 50 HP
97JOB WORK FOR REPAIR OF PUMP MOTOR Bearing Cap (rebuilding, turning & finishing)30 HP to 50 HP
98JOB WORK FOR REPAIR OF PUMP MOTOR Impeller Reconditioning for all type of Pump 20 HP to 30 HP
99JOB WORK FOR REPAIR OF PUMP MOTOR Impeller Reconditioning for all type of Pump 30 HP to 50 HP
100JOB WORK FOR REPAIR OF PUMP MOTOR Coupling with stud and rubber bush 20 HP to 30 HP
101JOB WORK FOR REPAIR OF PUMP MOTOR Coupling with stud and rubber bush30 HP to 50 HP
102Providing & Laying XLPE insulated three core ArmouredAluminiumcable for working voltage 11 K.V.(E) confirming IS :7098 P - 2withH4- Grade electrolyticaluminium conductor confirming to IS: 8130 class-2 of purity >99.6 %, Insulation Screening: Extruded Semiconducting Compound followed by helically wrapped Copper Tape, round / flat strip armouring of cables , Inner / outer sheath PVC type ST-2 confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810 All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .3 core 120.0 Sq.mm
103Providing & Laying XLPE insulated three core ArmouredAluminiumcable for working voltage 11 K.V.(E) confirming IS :7098 P - 2withH4- Grade electrolyticaluminium conductor confirming to IS: 8130 class-2 of purity >99.6 %, Insulation Screening: Extruded Semiconducting Compound followed by helically wrapped Copper Tape, round / flat strip armouring of cables , Inner / outer sheath PVC type ST-2 confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810 All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .3 core 150.0 Sq.mm
104Providing & making heat shrinkable type indoor/outdoor/straight through terminations/ joint kitsuitable for11 KV / 33 KV (Earthed) cable with required components, prepration of cable ends. Type test report should be as per IS13573:2011 which covered all sequence for table 2 for termination kit and table 3 for streightthrough joint inclusive thermal & dynamic short circuit test, humidity test, soil fog test. Crosslinking shall be done out side factory with E- beam/ peroxide technology. Extrusion process shall be in house OEM within same vicinity. includingtesting etc. as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .11 KV End Termination Kit Indoor type.3 core 120/150/185 Sq.mm
105Providing & making heat shrinkable type indoor/outdoor/straight through terminations/ joint kitsuitable for11 KV / 33 KV (Earthed) cable with required components, prepration of cable ends. Type test report should be as per IS13573:2011 which covered all sequence for table 2 for termination kit and table 3 for streightthrough joint inclusive thermal & dynamic short circuit test, humidity test, soil fog test. Crosslinking shall be done out side factory with E- beam/ peroxide technology. Extrusion process shall be in house OEM within same vicinity. includingtesting etc. as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .11 KV End Termination Kit Outdoor type.3 core 120/150/185 Sq.mm
106Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed ArrmouredAluminiumcable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV withH4- Grade electrolyticaluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR,35.0 Sq. mm,3 core
107Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed ArrmouredAluminiumcable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV withH4- Grade electrolyticaluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR.35.0 Sq. mm,3.5 core
108Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed ArrmouredAluminiumcable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV withH4- Grade electrolyticaluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR,95.0sq.mm,3.5 core
109Supplying and makingend termination with heavy aluminiumlugs ( Pin / ring type )confirming to IS 8309 -1993 & IS 8337-1976 duly crimped with crimping tool, PVC tape etc of following size.All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .35.0 Sq.mm
110Supplying and makingend termination with heavy aluminiumlugs ( Pin / ring type )confirming to IS 8309 -1993 & IS 8337-1976 duly crimped with crimping tool, PVC tape etc of following size.All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .95.0 Sq.mm
111Supplying and makingend termination with heavy aluminiumlugs ( Pin / ring type )confirming to IS 8309 -1993 & IS 8337-1976 duly crimped with crimping tool, PVC tape etc of following size.All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .120.0 Sq.mm
112Repairing Charges of Parts for PS-1, PS-2 of sanchore lift distributory, PS-1, PS-2, PS3A, PS3B, PS4, PS5A, PS5B, PS6 of Bhadrai lift distributory and Panoriya Pumping station
113Painting of machinery, including gearing, housing, shafting, Painting of machinery, including gearing, housing, shafting, bearing, pedestals, oil tanks, control cabinets, hoist beams, pipe support, clamps, ladders etc., of hoists and supporting structures, as per IS 14177, for which surface preparation by blast cleaning of class \"B\", primer coat (one coat) of Zinc phosphate paint to give a minimum dry film thickness of 50 ± 5 microns and finish coat (three coats) of aluminium paint or synthetic enamel paint, using airless spray, to provide a dry film thickness of 25 ± 5 microns per coat. Thus, total dry film thickness of all the coats, including primer coat, should not be less than 125 microns. This will include expenses on mobilization and demobilisation of equipments. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris and / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. completeUp to 1.5m height
114Repair of shaft set (set of three nos.)Groove making at bearing points of shafts for making equal depth for welding, Welding at bearing points of shafts, Machining and grinding at bearing points of shafts to bring its original diameter, Bend removal of shafts to bring it prefect straightness, Repair of key way at top shaft, line shaft & pump shaft according to keys and Repair of threads at one end of top shaft.60 cusec pump
115Repair of shaft set (set of three nos.)Groove making at bearing points of shafts for making equal depth for welding, Welding at bearing points of shafts, Machining and grinding at bearing points of shafts to bring its original diameter, Bend removal of shafts to bring it prefect straightness, Repair of key way at top shaft, line shaft & pump shaft according to keys and Repair of threads at one end of top shaft.40 cusec pump
116Repair & centering bowl assembly of pump Dismantling of bowl assembly. Loading of suction bowl on lathe/boring machine by chain pulley block/crane, Boring of rubber bearing housing of suction bowl for its correct centre line, Casting at C. I. sleeves for suction bowl, discharge bowl & extension piece. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housing of suction bowl, Unloading of section bowl from lathe/boring machine Fixing of C. I. sleeves in rubber bearing housing of suction bowl by press M/C. Again loading of suction bowl on lathe/boring M/C. Boring of C. I. sleeves according to rubber bearing of suction bowl. Unloading of suction bowl from lathe/boring M/C. Loading of discharge bowl/s on lathe/boring M/C by chain pulley block/crane.Boring of rubber bearing housings of discharge bowl/s at both ends for its correct centerline. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housings of discharge bowl. Unloading of discharge bowl/s from lathe/boring M/C. Fixing of C. I. sleeves in rubber bearing housings of discharge bowl by press M/C. Again loading of discharge bowl/s on lathe/boring M/C, Boring of C.I. sleeves according to rubber bearings of discharge bowl, Unloading of discharge bowl from lathe/boring M/C, loading of extension piece on by chain pulley block / crane, boring of damaged rubber bearing housing of extension piece for its correct centre line , Machining outer dia. of CI sleeve according to modified rubber bearing housing of extension piece, unloading of extension piece from lathe/boring machine, fixing of CI sleeve in rubber bearing housing of extension piece by press machine, again loading of extension piece on lathe /boring machine, Boring of C.I. sleeves according to rubber bearings of extension piece. Unloading of extension piece from lathe/boring M/C. Assembling of bowl assembly & check its centre line after its complete repair. Painting on the body of bowl assembly with black enamel paint. Transportation charge to & fro both side. (60 cusec pump)
117Repair & centering bowl assembly of pump Dismantling of bowl assembly. Loading of suction bowl on lathe/boring machine by chain pulley block/crane, Boring of rubber bearing housing of suction bowl for its correct centre line, Casting at C. I. sleeves for suction bowl, discharge bowl & extension piece. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housing of suction bowl, Unloading of section bowl from lathe/boring machine Fixing of C. I. sleeves in rubber bearing housing of suction bowl by press M/C. Again loading of suction bowl on lathe/boring M/C. Boring of C. I. sleeves according to rubber bearing of suction bowl. Unloading of suction bowl from lathe/boring M/C. Loading of discharge bowl/s on lathe/boring M/C by chain pulley block/crane.Boring of rubber bearing housings of discharge bowl/s at both ends for its correct centerline. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housings of discharge bowl. Unloading of discharge bowl/s from lathe/boring M/C. Fixing of C. I. sleeves in rubber bearing housings of discharge bowl by press M/C. Again loading of discharge bowl/s on lathe/boring M/C, Boring of C.I. sleeves according to rubber bearings of discharge bowl, Unloading of discharge bowl from lathe/boring M/C, loading of extension piece on by chain pulley block / crane, boring of damaged rubber bearing housing of extension piece for its correct centre line , Machining outer dia. of CI sleeve according to modified rubber bearing housing of extension piece, unloading of extension piece from lathe/boring machine, fixing of CI sleeve in rubber bearing housing of extension piece by press machine, again loading of extension piece on lathe /boring machine, Boring of C.I. sleeves according to rubber bearings of extension piece. Unloading of extension piece from lathe/boring M/C. Assembling of bowl assembly & check its centre line after its complete repair. Painting on the body of bowl assembly with black enamel paint. Transportation charge to & fro both side. (40 cusec pump)
118Servicing of H.T. motor having works as under:- Carrying out minor repair of the coils & the insulation of the stator. Repair /replacement of lose/missing & broken wedges fixing new magnetic wedges. Repair of damaged insulation of HT leads. repair re-enforcing loose lugs. Decarburization / cleaning / heating /varnishing / baking of stator winding for protection against moisture /dirt & dust. Decarburization / cleaning & core plating & varnishing of rotor lamination for any hot spot after conducting magnetic flux loop test & repair of rotor core. Testing/ checking of bearings. Fixing of new bearings, both sides & re-greasing, Shaft trueness 0-0 checking on lathe Checking of end cover & repair work on end cover. Repair/ replacement of RTD/ BTD/ space heater, assembling of motor, painting of motor, Carrying out necessary tests before starting the overhauling & Final testing checking of Motor, IR Value, Resistance test, inductance test and testing of motor at site,276-350 KW ,motorTransportation charges from site to workshop & similarly transportation charges from workshop to site,
119Servicing of H.T. motor having works as under:- Carrying out minor repair of the coils & the insulation of the stator. Repair /replacement of lose/missing & broken wedges fixing new magnetic wedges. Repair of damaged insulation of HT leads. repair re-enforcing loose lugs. Decarburization / cleaning / heating /varnishing / baking of stator winding for protection against moisture /dirt & dust. Decarburization / cleaning & core plating & varnishing of rotor lamination for any hot spot after conducting magnetic flux loop test & repair of rotor core. Testing/ checking of bearings. Fixing of new bearings, both sides & re-greasing, Shaft trueness 0-0 checking on lathe Checking of end cover & repair work on end cover. Repair/ replacement of RTD/ BTD/ space heater, assembling of motor, painting of motor, Carrying out necessary tests before starting the overhauling & Final testing checking of Motor, IR Value, Resistance test, inductance test and testing of motor at site,260-350 KW motorDynamic balancing of rotor as per grade G2.5
120(a)Additional Work (130-350 KW)Shaft Metalizing of rotor shaft
121(a)Additional Work (130-350 KW)Bushing on end shield cover
122Rewinding of stator with global VPI system276-350 KW
123Re-barring of the rotor, 130-350 KW
124Rewinding of single phase/3phase submersible motor including all necessary material and of the same characteristics as original with required size of super enamelled wire \"E\" class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. From7. 5 HP to 10.0 HP
125Repairing of submersible pump of withreplacement of broken impellers ,diffuser,bush/bearing set , oil seal complete with testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. From7. 5 HP to 10.0 HP
126Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire) \"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making electric connection at site of installation of motor with starter, alignment with pump setsand transportation to and fro from installation site complete as per direction of engineer in charge at site.Above 45.00 HP but upto 50.00 HP
127Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire) \"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making electric connection at site of installation of motor with starter, alignment with pump setsand transportation to and fro from installation site complete as per direction of engineer in charge at site.Above 25.00 HP but upto 30.00 HP

AI Tender Summary

OUR REF NO 39520156
AUTHORITY Government Departments
TENDER VALUE 2.60 Crore
LAST DATE 15-09-2023
Authority
Authority Name Water Resources Department
Work Description Operation And Maintenance Of Pumping Stations At Sanchore Lift Distributory, Bhadrai Lift Distributory, Panoriya Lift Distributory For The Year 2023-24
Basic Detail
Tender No SE NCP NIT No 2/2023-24 item 1
Bidding Type Tender
Location
City sanchore
State Rajasthan
Key Dates
Publish Date 06 Sep 2023
Submission Date 15 Sep 2023
Open Date 18 Sep 2023
Finance
Tender Value 2.60 Crore
Tender Fee 5000
EMD 5.20 Lakhs
Exemption Not Available
Document List
BOQ_647776.xls
af894936-e7f9-411e-a0f5-6e81be4d564d.html
bid1.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 06, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 15, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 18, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_647776.xls

html

af894936-e7f9-411e-a0f5-6e81be4d564d.html

pdf

bid1.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders