Tender For Operation And Maintenance Of Pumping Stations At Sanchore Lift Distributory, Bhadrai Lift Distributory, Panoriya Lift Distributory For The Year 2023-24
Tender Value
2.60 Crore
Estimated cost
Bid Submission
15 Sep 2023
0 days left
EMD
5.20 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
sanchore → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Operation And Maintenance Of Pumping Stations At Sanchore Lift Distributory, Bhadrai Lift Distributory, Panoriya Lift Distributory For The Year 2023-24
BOQ
| Sl. No. | Item Description |
| 1 | Operation and maintenance charges for maintaining desire flow atPS-1, PS-2 of sanchore lift distributory, PS-1, PS-2, PS3A, PS3B, PS4, PS5A, PS5B, PS6 of Bhadrai lift distributory and Panoriya Pumping station |
| 2 | Driver for Pumps |
| 3 | Supervisor |
| 4 | Electrician grade-1 |
| 5 | Welder/fitter |
| 6 | Helper |
| 7 | Inspection Vehicle such as Jeep |
| 8 | Beldar/women Cooli/ Chowkidar/Water man / Earth dresser |
| 9 | Tractor upto 40HP |
| 10 | Tractor Trolly above 2 cum capacity (without staff) with hydraulic lift |
| 11 | Diesel Consumption |
| 12 | Partsincluding Supply, Installation, Testing & Commissioning for O&M work |
| 13 | Spare for fig-6310-30 (1-stage Discharge bowl bearing |
| 14 | Spare for fig-6310-30(1-stage Pump shaft 3-7/16 |
| 15 | Spare for fig-6310-30(1-stage) Line shaft |
| 16 | Spare for fig-6310-30(1-stage) Top shaft |
| 17 | Spare for fig-6310-30(1-stage) Packing box |
| 18 | Spare for fig-6310-30(1-stage) Line shaft sleeve |
| 19 | Packing gland box cap 60 cusec pump |
| 20 | Packing gland box cap 40 cusec pump |
| 21 | Link assembly complete set 60 cusec pump |
| 22 | Link assembly complete set40 cusec pump |
| 23 | Supply & Replacement of LED Type Indicating Lamps30/110V DC &110/240 Volts AC on existing LT /6.6 KV Panels. |
| 24 | 6.6/7.2KV HRC Fuse(25-100Amp) |
| 25 | HRC Fuse 63 amp (415 Volt, TSS Type/Offset Tag Type,80 kA breaking capacity, IS-13703 ) |
| 26 | Base & Carrier Fuse |
| 27 | Block Contact 1 NO + 1 NC |
| 28 | Block Contact 2 NO for Push Button |
| 29 | Voltmeter 0-8KV SIF 96 MM, 6.6 KV/110 V |
| 30 | Ammeter (Size CTR & Range will be Indicated at the time of order ) |
| 31 | Push button complete |
| 32 | Rectifier Bridge 15A, 1000 PIV |
| 33 | Limit Switch 1 NO + 1NC |
| 34 | Closing coil 30V DC for 6.6 KV or3.3 KV HT panel |
| 35 | Insulator 6.6 KV or3.3 KV for HT panel |
| 36 | Kilo Watt Hour Meter,IS-722(415 Volt,3 Phase)IS:6767 |
| 37 | Current Transformer,IS-2705(415 Volt, 200/5 Amp,3 Phase) |
| 38 | Ampere meter CTR Type,IS-722(0-200 Amp,415 Volt,3 Phase)IS:6767 |
| 39 | Volt meter(0-500 Volt,415 Volt, 3 Phase)IS:6767 |
| 40 | Ampere selector switch(415 Volt,3 Phase) |
| 41 | Voltage selector switch(415 Volt,3 Phase) |
| 42 | On Off Push button (415 Volt, Suitable for 75 HP starter) |
| 43 | Star Delta Timer Relay(Rz-12) with transformer ,IS- 3231(415 Volt, Suitable for 75 HP starter) |
| 44 | 24 V DC 8 way contactor |
| 45 | TNC switch |
| 46 | Motor protection relay |
| 47 | Master trip relay |
| 48 | Rotary switches |
| 49 | Auxiliary Contactor 110VDC/4NO, 4NC |
| 50 | ADDON Contact 4NO 4NC |
| 51 | MCB 3Pole for PT supply 110VAC/32A |
| 52 | MCB 2Pole for PT supply 110VAC/6A |
| 53 | MCB 1Pole for auxiliary CKT 110VDC/6A |
| 54 | Panel Illumination lamp with holder |
| 55 | Local remote Switch |
| 56 | Power Pack Input 220 VAC/110 Vdc |
| 57 | 6.6kv/3.15 Amp PT fuse |
| 58 | Test Terminal Block for Measuring |
| 59 | Multi-Function Meter |
| 60 | ECONOMMY REGISTANCE |
| 61 | HT Capacitor 6.6 KV or3.3 KV 100 KVAR |
| 62 | 170 KVAR HT capacitor 3-phase 6.6KV or 3.3 KV amp 14.87 |
| 63 | LT Capacitor 3-phase 440Volt |
| 64 | Providing and fitting of contactor for hoist motor. |
| 65 | Bearing - 6207 |
| 66 | Refilling of fire extinguisher |
| 67 | Supply Elec. Shock proof rubber matting 2000x1000x12 mm |
| 68 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Connection Plates 20 HP to 30 HP |
| 69 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Connection Plates 30 HP to 50 HP |
| 70 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Cooling Fan 20 HP to 30 HP |
| 71 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Fan Cover 20 HP to 30 HP |
| 72 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Fan Cover 30 HP to 50 HP |
| 73 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M./SS Gland Guide Bush 20 HP to 30 HP |
| 74 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M./SS Gland Guide Bush 30 HP to 50 HP |
| 75 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft with Sleeve Chuck Nut20 HP to 30 HP |
| 76 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft with Sleeve Chuck Nut30 HP to 50 HP |
| 77 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft Chuck Nut20 HP to 30 HP |
| 78 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Shaft Chuck Nut 30 HP to 50 HP |
| 79 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Neck Ring20 HP to 30 HP |
| 80 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Neck Ring 30 HP to 50 HP |
| 81 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Bush Shaft Sleeve of G.M.20 HP to 30 HP |
| 82 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Bush Shaft Sleeve of G.M. 30 HP to 50 HP |
| 83 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Gland Cover20 HP to 30 HP |
| 84 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Gland Cover30 HP to 50 HP |
| 85 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) S.S. Shaft (Non Magnetic)20 HP to 30 HP |
| 86 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) S.S. Shaft (Non Magnetic)30 HP to 50 HP |
| 87 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Shaft Sleeve Check Nut 20 HP to 30 HP |
| 88 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) G.M. Shaft Sleeve Check Nut 30 HP to 50 HP |
| 89 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) M.S. Shaft Check Nut 20 HP to 30 HP |
| 90 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) M.S. Shaft Check Nut 30 HP to 50 HP |
| 91 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Cooling pipe set with nozzle & Nut 20 HP to 30 HP |
| 92 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) Cooling pipe set with nozzle & Nut 30 HP to 50 HP |
| 93 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) AIR Cock 20 HP to 30 HP |
| 94 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) AIR Cock30 HP to 50 HP |
| 95 | JOB WORK FOR REPAIR OF PUMP MOTOR Bearing Housing (rebuilding, turning & finishing) 20 HP to 30 HP |
| 96 | JOB WORK FOR REPAIR OF PUMP MOTOR Bearing Housing (rebuilding, turning & finishing) 30 HP to 50 HP |
| 97 | JOB WORK FOR REPAIR OF PUMP MOTOR Bearing Cap (rebuilding, turning & finishing)30 HP to 50 HP |
| 98 | JOB WORK FOR REPAIR OF PUMP MOTOR Impeller Reconditioning for all type of Pump 20 HP to 30 HP |
| 99 | JOB WORK FOR REPAIR OF PUMP MOTOR Impeller Reconditioning for all type of Pump 30 HP to 50 HP |
| 100 | JOB WORK FOR REPAIR OF PUMP MOTOR Coupling with stud and rubber bush 20 HP to 30 HP |
| 101 | JOB WORK FOR REPAIR OF PUMP MOTOR Coupling with stud and rubber bush30 HP to 50 HP |
| 102 | Providing & Laying XLPE insulated three core ArmouredAluminiumcable for working voltage 11 K.V.(E) confirming IS :7098 P - 2withH4- Grade electrolyticaluminium conductor confirming to IS: 8130 class-2 of purity >99.6 %, Insulation Screening: Extruded Semiconducting Compound followed by helically wrapped Copper Tape, round / flat strip armouring of cables , Inner / outer sheath PVC type ST-2 confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810 All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .3 core 120.0 Sq.mm |
| 103 | Providing & Laying XLPE insulated three core ArmouredAluminiumcable for working voltage 11 K.V.(E) confirming IS :7098 P - 2withH4- Grade electrolyticaluminium conductor confirming to IS: 8130 class-2 of purity >99.6 %, Insulation Screening: Extruded Semiconducting Compound followed by helically wrapped Copper Tape, round / flat strip armouring of cables , Inner / outer sheath PVC type ST-2 confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810 All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .3 core 150.0 Sq.mm |
| 104 | Providing & making heat shrinkable type indoor/outdoor/straight through terminations/ joint kitsuitable for11 KV / 33 KV (Earthed) cable with required components, prepration of cable ends. Type test report should be as per IS13573:2011 which covered all sequence for table 2 for termination kit and table 3 for streightthrough joint inclusive thermal & dynamic short circuit test, humidity test, soil fog test. Crosslinking shall be done out side factory with E- beam/ peroxide technology. Extrusion process shall be in house OEM within same vicinity. includingtesting etc. as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .11 KV End Termination Kit Indoor type.3 core 120/150/185 Sq.mm |
| 105 | Providing & making heat shrinkable type indoor/outdoor/straight through terminations/ joint kitsuitable for11 KV / 33 KV (Earthed) cable with required components, prepration of cable ends. Type test report should be as per IS13573:2011 which covered all sequence for table 2 for termination kit and table 3 for streightthrough joint inclusive thermal & dynamic short circuit test, humidity test, soil fog test. Crosslinking shall be done out side factory with E- beam/ peroxide technology. Extrusion process shall be in house OEM within same vicinity. includingtesting etc. as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .11 KV End Termination Kit Outdoor type.3 core 120/150/185 Sq.mm |
| 106 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed ArrmouredAluminiumcable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV withH4- Grade electrolyticaluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR,35.0 Sq. mm,3 core |
| 107 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed ArrmouredAluminiumcable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV withH4- Grade electrolyticaluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR.35.0 Sq. mm,3.5 core |
| 108 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed ArrmouredAluminiumcable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV withH4- Grade electrolyticaluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) includingtesting etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR,95.0sq.mm,3.5 core |
| 109 | Supplying and makingend termination with heavy aluminiumlugs ( Pin / ring type )confirming to IS 8309 -1993 & IS 8337-1976 duly crimped with crimping tool, PVC tape etc of following size.All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .35.0 Sq.mm |
| 110 | Supplying and makingend termination with heavy aluminiumlugs ( Pin / ring type )confirming to IS 8309 -1993 & IS 8337-1976 duly crimped with crimping tool, PVC tape etc of following size.All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .95.0 Sq.mm |
| 111 | Supplying and makingend termination with heavy aluminiumlugs ( Pin / ring type )confirming to IS 8309 -1993 & IS 8337-1976 duly crimped with crimping tool, PVC tape etc of following size.All as per pre approved by Engineer in charge. For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .120.0 Sq.mm |
| 112 | Repairing Charges of Parts for PS-1, PS-2 of sanchore lift distributory, PS-1, PS-2, PS3A, PS3B, PS4, PS5A, PS5B, PS6 of Bhadrai lift distributory and Panoriya Pumping station |
| 113 | Painting of machinery, including gearing, housing, shafting, Painting of machinery, including gearing, housing, shafting, bearing, pedestals, oil tanks, control cabinets, hoist beams, pipe support, clamps, ladders etc., of hoists and supporting structures, as per IS 14177, for which surface preparation by blast cleaning of class \"B\", primer coat (one coat) of Zinc phosphate paint to give a minimum dry film thickness of 50 ± 5 microns and finish coat (three coats) of aluminium paint or synthetic enamel paint, using airless spray, to provide a dry film thickness of 25 ± 5 microns per coat. Thus, total dry film thickness of all the coats, including primer coat, should not be less than 125 microns. This will include expenses on mobilization and demobilisation of equipments. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris and / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. completeUp to 1.5m height |
| 114 | Repair of shaft set (set of three nos.)Groove making at bearing points of shafts for making equal depth for welding, Welding at bearing points of shafts, Machining and grinding at bearing points of shafts to bring its original diameter, Bend removal of shafts to bring it prefect straightness, Repair of key way at top shaft, line shaft & pump shaft according to keys and Repair of threads at one end of top shaft.60 cusec pump |
| 115 | Repair of shaft set (set of three nos.)Groove making at bearing points of shafts for making equal depth for welding, Welding at bearing points of shafts, Machining and grinding at bearing points of shafts to bring its original diameter, Bend removal of shafts to bring it prefect straightness, Repair of key way at top shaft, line shaft & pump shaft according to keys and Repair of threads at one end of top shaft.40 cusec pump |
| 116 | Repair & centering bowl assembly of pump Dismantling of bowl assembly. Loading of suction bowl on lathe/boring machine by chain pulley block/crane, Boring of rubber bearing housing of suction bowl for its correct centre line, Casting at C. I. sleeves for suction bowl, discharge bowl & extension piece. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housing of suction bowl, Unloading of section bowl from lathe/boring machine Fixing of C. I. sleeves in rubber bearing housing of suction bowl by press M/C. Again loading of suction bowl on lathe/boring M/C. Boring of C. I. sleeves according to rubber bearing of suction bowl. Unloading of suction bowl from lathe/boring M/C. Loading of discharge bowl/s on lathe/boring M/C by chain pulley block/crane.Boring of rubber bearing housings of discharge bowl/s at both ends for its correct centerline. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housings of discharge bowl. Unloading of discharge bowl/s from lathe/boring M/C. Fixing of C. I. sleeves in rubber bearing housings of discharge bowl by press M/C. Again loading of discharge bowl/s on lathe/boring M/C, Boring of C.I. sleeves according to rubber bearings of discharge bowl, Unloading of discharge bowl from lathe/boring M/C, loading of extension piece on by chain pulley block / crane, boring of damaged rubber bearing housing of extension piece for its correct centre line , Machining outer dia. of CI sleeve according to modified rubber bearing housing of extension piece, unloading of extension piece from lathe/boring machine, fixing of CI sleeve in rubber bearing housing of extension piece by press machine, again loading of extension piece on lathe /boring machine, Boring of C.I. sleeves according to rubber bearings of extension piece. Unloading of extension piece from lathe/boring M/C. Assembling of bowl assembly & check its centre line after its complete repair. Painting on the body of bowl assembly with black enamel paint. Transportation charge to & fro both side. (60 cusec pump) |
| 117 | Repair & centering bowl assembly of pump Dismantling of bowl assembly. Loading of suction bowl on lathe/boring machine by chain pulley block/crane, Boring of rubber bearing housing of suction bowl for its correct centre line, Casting at C. I. sleeves for suction bowl, discharge bowl & extension piece. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housing of suction bowl, Unloading of section bowl from lathe/boring machine Fixing of C. I. sleeves in rubber bearing housing of suction bowl by press M/C. Again loading of suction bowl on lathe/boring M/C. Boring of C. I. sleeves according to rubber bearing of suction bowl. Unloading of suction bowl from lathe/boring M/C. Loading of discharge bowl/s on lathe/boring M/C by chain pulley block/crane.Boring of rubber bearing housings of discharge bowl/s at both ends for its correct centerline. Machining at outer dia. of C. I. sleeves according to modified rubber bearing housings of discharge bowl. Unloading of discharge bowl/s from lathe/boring M/C. Fixing of C. I. sleeves in rubber bearing housings of discharge bowl by press M/C. Again loading of discharge bowl/s on lathe/boring M/C, Boring of C.I. sleeves according to rubber bearings of discharge bowl, Unloading of discharge bowl from lathe/boring M/C, loading of extension piece on by chain pulley block / crane, boring of damaged rubber bearing housing of extension piece for its correct centre line , Machining outer dia. of CI sleeve according to modified rubber bearing housing of extension piece, unloading of extension piece from lathe/boring machine, fixing of CI sleeve in rubber bearing housing of extension piece by press machine, again loading of extension piece on lathe /boring machine, Boring of C.I. sleeves according to rubber bearings of extension piece. Unloading of extension piece from lathe/boring M/C. Assembling of bowl assembly & check its centre line after its complete repair. Painting on the body of bowl assembly with black enamel paint. Transportation charge to & fro both side. (40 cusec pump) |
| 118 | Servicing of H.T. motor having works as under:- Carrying out minor repair of the coils & the insulation of the stator. Repair /replacement of lose/missing & broken wedges fixing new magnetic wedges. Repair of damaged insulation of HT leads. repair re-enforcing loose lugs. Decarburization / cleaning / heating /varnishing / baking of stator winding for protection against moisture /dirt & dust. Decarburization / cleaning & core plating & varnishing of rotor lamination for any hot spot after conducting magnetic flux loop test & repair of rotor core. Testing/ checking of bearings. Fixing of new bearings, both sides & re-greasing, Shaft trueness 0-0 checking on lathe Checking of end cover & repair work on end cover. Repair/ replacement of RTD/ BTD/ space heater, assembling of motor, painting of motor, Carrying out necessary tests before starting the overhauling & Final testing checking of Motor, IR Value, Resistance test, inductance test and testing of motor at site,276-350 KW ,motorTransportation charges from site to workshop & similarly transportation charges from workshop to site, |
| 119 | Servicing of H.T. motor having works as under:- Carrying out minor repair of the coils & the insulation of the stator. Repair /replacement of lose/missing & broken wedges fixing new magnetic wedges. Repair of damaged insulation of HT leads. repair re-enforcing loose lugs. Decarburization / cleaning / heating /varnishing / baking of stator winding for protection against moisture /dirt & dust. Decarburization / cleaning & core plating & varnishing of rotor lamination for any hot spot after conducting magnetic flux loop test & repair of rotor core. Testing/ checking of bearings. Fixing of new bearings, both sides & re-greasing, Shaft trueness 0-0 checking on lathe Checking of end cover & repair work on end cover. Repair/ replacement of RTD/ BTD/ space heater, assembling of motor, painting of motor, Carrying out necessary tests before starting the overhauling & Final testing checking of Motor, IR Value, Resistance test, inductance test and testing of motor at site,260-350 KW motorDynamic balancing of rotor as per grade G2.5 |
| 120 | (a)Additional Work (130-350 KW)Shaft Metalizing of rotor shaft |
| 121 | (a)Additional Work (130-350 KW)Bushing on end shield cover |
| 122 | Rewinding of stator with global VPI system276-350 KW |
| 123 | Re-barring of the rotor, 130-350 KW |
| 124 | Rewinding of single phase/3phase submersible motor including all necessary material and of the same characteristics as original with required size of super enamelled wire \"E\" class insulation material and testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. From7. 5 HP to 10.0 HP |
| 125 | Repairing of submersible pump of withreplacement of broken impellers ,diffuser,bush/bearing set , oil seal complete with testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. From7. 5 HP to 10.0 HP |
| 126 | Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire) \"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making electric connection at site of installation of motor with starter, alignment with pump setsand transportation to and fro from installation site complete as per direction of engineer in charge at site.Above 45.00 HP but upto 50.00 HP |
| 127 | Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire) \"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making electric connection at site of installation of motor with starter, alignment with pump setsand transportation to and fro from installation site complete as per direction of engineer in charge at site.Above 25.00 HP but upto 30.00 HP |
AI Tender Summary
Tender Timeline
Sep 06, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedSep 15, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 18, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer