Public Health Engineering Department-PHED has published Annual Rates Contract For Extraction, Loading, Unloading And Lowering Of Submersible Pump Sets, Vt Pump Sets, Pump Sets Of Dug Wells Along With Replacement Of Components Of Submersible Pump Set / Vt Pump Set, Submersible Cables And Allied Works At . Submission Date for this Tender is 25-09-2023. Loading Work Tenders in urban Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Submersible Pump V4 |
2 | Dismantling of Submersible Pump set at Workshop and checking for its replacement of damaged parts. |
3 | Providing and fitting of new Pump Shaft. |
4 | Reconditioning of Pump Shaft by way of welding, turning and polishing to the actual size, making of key way. |
5 | Providing and fitting of new impeller. |
6 | Reconditioning of impeller by way of welding, turning and polishing to the actual size. |
7 | Providing and fitting of new Neck Ring. |
8 | Providing and fitting of Shaft Sleeve. |
9 | Providing and fitting of Coupling with key. |
10 | Providing and fitting of Bowl Bush. |
11 | Providing and fitting of NRV Bowl. |
12 | Providing and fitting of Tee Bolts/per piece. |
13 | Providing and fitting of Motor Base Bowl. |
14 | Providing and fitting of Stud fasting ring with studs upper and lower and circlip lock. |
15 | Providing and fitting of Bowl. |
16 | Providing and fitting of Diffuser. |
17 | Reconditioning of rotor shaft by way of welding to ends, turning and polishing to the required size. |
18 | Providing and fitting of thrust bearing / thrust pad set |
19 | Providing and fitting of bush for motor bowl |
20 | Providing and fitting of motor bowl upper/ lower |
21 | Rebuilding of Broken rotor shaft. |
22 | Assembling of Pump and then coupling with motor with proper alignment. Testing in test pit at workshop. |
23 | Submersible Pump V6 |
24 | Dismantling of Submersible Pump set at Workshop and checking for its replacement of damaged parts. |
25 | Providing and fitting of new Pump Shaft. |
26 | Reconditioning of Pump Shaft by way of welding, turning and polishing to the actual size, making of key way. |
27 | Providing and fitting of new impeller. |
28 | Reconditioning of impeller by way of welding, turning and polishing to the actual size. |
29 | Providing and fitting of new Neck Ring. |
30 | Providing and fitting of Shaft Sleeve. |
31 | Providing and fitting of Coupling with key. |
32 | Providing and fitting of Bowl Bush. |
33 | Providing and fitting of NRV Bowl. |
34 | Providing and fitting of Tee Bolts/per piece. |
35 | Providing and fitting of Motor Base Bowl. |
36 | Providing and fitting of Stud fasting ring with studs upper and lower and circlip lock. |
37 | Providing and fitting of Bowl. |
38 | Providing and fitting of Diffuser. |
39 | Reconditioning of rotor shaft by way of welding to ends, turning and polishing to the required size. |
40 | Providing and fitting of thrust bearing / thrust pad set |
41 | Providing and fitting of bush for motor bowl |
42 | Providing and fitting of motor bowl upper/ lower |
43 | Rebuilding of Broken rotor shaft. |
44 | Assembling of Pump and then coupling with motor with proper alignment. Testing in test pit at workshop. |
45 | Submersible Pump V8 |
46 | Dismantling of Submersible Pump set at Workshop and checking for its replacement of damaged parts. |
47 | Providing and fitting of new Pump Shaft. |
48 | Reconditioning of Pump Shaft by way of welding, turning and polishing to the actual size, making of key way. |
49 | Providing and fitting of new impeller. |
50 | Reconditioning of impeller by way of welding, turning and polishing to the actual size. |
51 | Providing and fitting of new Neck Ring. |
52 | Providing and fitting of Shaft Sleeve. |
53 | Providing and fitting of Coupling with key. |
54 | Providing and fitting of Bowl Bush. |
55 | Providing and fitting of NRV Bowl. |
56 | Providing and fitting of Tee Bolts/per piece. |
57 | Providing and fitting of Motor Base Bowl. |
58 | Providing and fitting of Stud fasting ring with studs upper and lower and circlip lock. |
59 | Providing and fitting of Bowl. |
60 | Providing and fitting of Diffuser. |
61 | Reconditioning of rotor shaft by way of welding to ends, turning and polishing to the required size. |
62 | Providing and fitting of thrust bearing / thrust pad set |
63 | Providing and fitting of bush for motor bowl |
64 | Providing and fitting of motor bowl upper/ lower |
65 | Rebuilding of Broken rotor shaft. |
66 | Assembling of Pump and then coupling with motor with proper alignment. Testing in test pit at workshop. |
67 | Submersible Pump V10 |
68 | Dismantling of Submersible Pump set at Workshop and checking for its replacement of damaged parts. |
69 | Providing and fitting of new Pump Shaft. |
70 | Reconditioning of Pump Shaft by way of welding, turning and polishing to the actual size, making of key way. |
71 | Providing and fitting of new impeller. |
72 | Reconditioning of impeller by way of welding, turning and polishing to the actual size. |
73 | Providing and fitting of new Neck Ring. |
74 | Providing and fitting of Shaft Sleeve. |
75 | Providing and fitting of Coupling with key. |
76 | Providing and fitting of Bowl Bush. |
77 | Providing and fitting of NRV Bowl. |
78 | Providing and fitting of Tee Bolts/per piece. |
79 | Providing and fitting of Motor Base Bowl. |
80 | Providing and fitting of Stud fasting ring with studs upper and lower and circlip lock. |
81 | Providing and fitting of Bowl. |
82 | Providing and fitting of Diffuser. |
83 | Reconditioning of rotor shaft by way of welding to ends, turning and polishing to the required size. |
84 | Providing and fitting of thrust bearing / thrust pad set |
85 | Providing and fitting of bush for motor bowl |
86 | Providing and fitting of motor bowl upper/ lower |
87 | Rebuilding of Broken rotor shaft. |
88 | Assembling of Pump and then coupling with motor with proper alignment. Testing in test pit at workshop. |
89 | VT Pump 1.80lac. GPH X 34.5 Mtr. |
90 | Dismantling of Pump assembly, checking of parts that needs to be reconditioned/replaced including liner assembly. |
91 | Providing and fitting of new VT Pump shaft. |
92 | Reconditioning of VT Pump shaft by way of welding, turning, polishing to the required size. Making of key ways for holding impeller and threading at one end as per thread size of the shaft coupler. |
93 | Reconditioning of bowl body by extracting out the damaged bowl bush, fabrication of new bush and fitting the same to the body including welding, turning and polishing to the required size. |
94 | Providing and fitting of new stage casing Bowl. |
95 | Reconditioning of Stage Casing Bowl. |
96 | Providing and fitting of New Suction Bowl. |
97 | Providing and fitting of New Discharge Bowl. |
98 | Providing and fitting of new body bush. |
99 | Providing and fitting of new impeller. |
100 | Reconditioning of impeller by re-metalling on damaged portion, turning, finishing and balancing. |
101 | Fabrication and fitting of neck ring to bowl body. |
102 | Providing and fitting of guide spider |
103 | Providing and fitting of guide spider bush |
104 | Providing and fitting of discharge head bolt |
105 | Reconditioning of guide spider |
106 | Providing and fitting of stuffing box |
107 | Reconditioning ofstuffing box |
108 | Reconditioning of pump body/ suction |
109 | Providing and fitting of impeller holding split rings. |
110 | Providing and fitting of stage casing bush Gun Metal |
111 | Providing and fitting of top shaft as per sample. |
112 | Providing and fitting of shaft protection sleeves. |
113 | Providing and fitting of shaft coupler. |
114 | Providing and fitting of liner shaft |
115 | Providing and fitting of shaft enclosing tubes. |
116 | Reconditioning of top shaft |
117 | Reconditioning of shaft enclosing tubes by way of cutting the tube from the centre and welding of both the threaded ends with superior quality welding rods and checking of its proper alignment. Then threading the both ends internally as per size of bush. |
118 | Providing and fitting of gun metal bush for shaft enclosing tubes. |
119 | Dismantling of ratchet assembly, extraction of damaged ratchet bearings, ratchet pins. Fitting of ratchet assembly after replacement of components. |
120 | Providing and fitting of bearing 7319. |
121 | Providing and fitting of bearing 16026. |
122 | Providing and fitting of ratchet pin |
123 | Reconditioning of ratchet pin |
124 | Providing and fitting of Top Ratchet Plate. |
125 | Providing and fitting of Coupling Pulley Set. |
126 | Providing and fitting of Coupling Bolt ( 10 mm X 75 mm) and Rubber Bush/ each. |
127 | Providing and fitting of Nut- Bolt ( ¾ x 3” ) / kg. |
128 | VT Pump 1.50lac. GPH X 45 Mtr. |
129 | Dismantling of Pump assembly, checking of parts that needs to be reconditioned/replaced including liner assembly. |
130 | Providing and fitting of new VT Pump shaft. |
131 | Reconditioning of VT Pump shaft by way of welding, turning, polishing to the required size. Making of key ways for holding impeller and threading at one end as per thread size of the shaft coupler. |
132 | Reconditioning of bowl body by extracting out the damaged bowl bush, fabrication of new bush and fitting the same to the body including welding, turning and polishing to the required size. |
133 | Providing and fitting of new stage casing Bowl. |
134 | Reconditioning of Stage Casing Bowl. |
135 | Providing and fitting of New Suction Bowl. |
136 | Providing and fitting of New Discharge Bowl. |
137 | Providing and fitting of new body bush. |
138 | Providing and fitting of new impeller. |
139 | Reconditioning of impeller by re-metalling on damaged portion, turning, finishing and balancing. |
140 | Fabrication and fitting of neck ring to bowl body. |
141 | Providing and fitting of guide spider |
142 | Providing and fitting of guide spider bush |
143 | Providing and fitting of discharge head bolt |
144 | Reconditioning of guide spider |
145 | Providing and fitting of stuffing box |
146 | Reconditioning ofstuffing box |
147 | Reconditioning of pump body/ suction |
148 | Reconditioning of Stage Casing Bowl. |
149 | Providing and fitting of New Suction Bowl. |
150 | Providing and fitting of New Discharge Bowl. |
151 | Providing and fitting of impeller holding split rings. |
152 | Providing and fitting of stage casing bush Gun Metal |
153 | Providing and fitting of Bottle ( cast iron ) |
154 | Providing and fitting of Bottle Bush G.M. |
155 | Providing and fitting of top shaft as per sample. |
156 | Providing and fitting of shaft protection sleeves. |
157 | Providing and fitting of shaft coupler. |
158 | Providing and fitting of liner shaft |
159 | Providing and fitting of shaft enclosing tubes. |
160 | Reconditioning of top shaft |
161 | Reconditioning of shaft enclosing tubes by way of cutting the tube from the centre and welding of both the threaded ends with superior quality welding rods and checking of its proper alignment. Then threading the both ends internally as per size of bush. |
162 | Providing and fitting of gun metal bush for shaft enclosing tubes. |
163 | Dismantling of ratchet assembly, extraction of damaged ratchet bearings, ratchet pins. Fitting of ratchet assembly after replacement of components. |
164 | Providing and fitting of bearing 29320M. |
165 | Providing and fitting of ratchet pin |
166 | Reconditioning of ratchet pin |
167 | Providing and fitting of Top Ratchet Plate. |
168 | Providing and fitting of Coupling Pulley Set. |
169 | Providing and fitting of Coupling Bolt ( 10 mm X 75 mm) and Rubber Bush/ each. |
170 | Providing and fitting of Nut- Bolt ( ¾ x 3” ) / kg. |
171 | VT Pump 0.55 lac. GPH X 30 Mtr. |
172 | Dismantling of Pump assembly, checking of parts that needs to be reconditioned/replaced including liner assembly. |
173 | Providing and fitting of new VT Pump shaft. |
174 | Reconditioning of VT Pump shaft by way of welding, turning, polishing to the required size. Making of key ways for holding impeller and threading at one end as per thread size of the shaft coupler. |
175 | Reconditioning of bowl body by extracting out the damaged bowl bush, fabrication of new bush and fitting the same to the body including welding, turning and polishing to the required size. |
176 | Providing and fitting of new stage casing Bowl. |
177 | Reconditioning of Stage Casing Bowl. |
178 | Providing and fitting of New Suction Bowl. |
179 | Providing and fitting of New Discharge Bowl. |
180 | Providing and fitting of new body bush. |
181 | Providing and fitting of new impeller. |
182 | Reconditioning of impeller by re-metalling on damaged portion, turning, finishing and balancing. |
183 | Fabrication and fitting of neck ring to bowl body. |
184 | Providing and fitting of guide spider |
185 | Providing and fitting of guide spider bush |
186 | Providing and fitting of discharge head bolt |
187 | Reconditioning of guide spider |
188 | Providing and fitting of stuffing box |
189 | Reconditioning ofstuffing box |
190 | Reconditioning of pump body/ suction |
191 | Providing and fitting of impeller holding split rings. |
192 | Providing and fitting of stage casing bush Gun Metal |
193 | Providing and fitting of Bottle ( cast iron ) |
194 | Providing and fitting of Bottle Bush G.M. |
195 | Providing and fitting of top shaft as per sample. |
196 | Providing and fitting of shaft protection sleeves. |
197 | Providing and fitting of shaft coupler. |
198 | Providing and fitting of liner shaft |
199 | Providing and fitting of shaft enclosing tubes. |
200 | Reconditioning of top shaft |
201 | Reconditioning of shaft enclosing tubes by way of cutting the tube from the centre and welding of both the threaded ends with superior quality welding rods and checking of its proper alignment. Then threading the both ends internally as per size of bush. |
202 | Providing and fitting of gun metal bush for shaft enclosing tubes. |
203 | Dismantling of ratchet assembly, extraction of damaged ratchet bearings, ratchet pins. Fitting of ratchet assembly after replacement of components. |
204 | Providing and fitting of bearing 7214. |
205 | Providing and fitting of ratchet pin |
206 | Reconditioning of ratchet pin |
207 | Providing and fitting of Top Ratchet Plate. |
208 | Providing and fitting of Coupling Pulley Set. |
209 | Providing and fitting of Coupling Bolt ( 10 mm X 75 mm) and Rubber Bush/ each. |
210 | Providing and fitting of Nut- Bolt ( ¾ x 3” ) / kg. |
211 | Column pipes/ Flanges |
212 | Providing and fitting of G.I column pipes of 3 mtr length having flanges at both ends:- |
213 | 32 mm dia |
214 | 65 mm dia |
215 | 80 mm dia |
216 | 100 mm dia |
217 | 125 mm dia |
218 | 150 mm dia |
219 | 200 mm dia |
220 | Providing and fitting of M.S column pipes of 3 mtr length having flanges at both ends:- |
221 | 32 mm dia |
222 | 65 mm dia |
223 | 80 mm dia |
224 | 100 mm dia |
225 | 125 mm dia |
226 | 150 mm dia |
227 | 200 mm dia |
228 | Fabrication and fitting of M.S flange (One end) to G.I/ M.S column pipes of following ID:- |
229 | 32 mm dia |
230 | 65 mm dia |
231 | 80 mm dia |
232 | 100 mm dia |
233 | 125 mm dia |
234 | 150 mm dia |
235 | 200 mm dia |
236 | Providing and fitting of copper Submersible cable 3core along with Thimbles. |
237 | 2.5 sq. mm /mtr. |
238 | 4 sq.mm /mtr. |
239 | 6 sq. mm /mtr. |
240 | 10 sq. mm/mtr. |
241 | 16 sq. mm/mtr. |
242 | 25 sq. mm/mtr. |
243 | 35 sq. mm/mtr. |
244 | 50 sq. mm/mtr. |
245 | Providing & filling of lubricating oil (Grade 43) in ratchet per liter |
246 | For 2.5-inch dia to 4 inch dia column pipes when number of column pipes lies in the range of 0 to 10, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
247 | For 2.5 inch dia to 4 inch dia column pipes when number of column pipes lies in the range of 11 to 20, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
248 | For 2.5 inch dia to 4 inch dia column pipes when number of column pipes lies in the range of 21 to 30, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
249 | For 2.5 inch dia to 4 inch dia column pipes when number of column pipes lies in the range of 31 to 40, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
250 | For 2.5 inch dia to 4 inch dia column pipes when number of column pipes lies in the range of 41 and above, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
251 | For 5 inch dia to 8 inch dia column pipes when number of column pipes lies in the range of 0 to 10, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly. |
252 | For 5 inch dia to 8 inch dia column pipes when number of column pipes lies in the range of 11 to 20, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
253 | For 5 inch dia to 8 inch dia column pipes when number of column pipes lies in the range of 21 to 30, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
254 | For 5 inch dia to 8 inch dia column pipes when number of column pipes lies in the range of 31 to 40, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
255 | For 5 inch dia to 8 inch dia column pipes when number of column pipes lies in the range of 41 and above, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tube well, stacking of column pipes and Submersible cable properly. |
256 | For 2.5 inch dia to 4 inch dia column pipes, Loading of Submersible Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 0 to 10 km. |
257 | For 2.5 inch dia to 4 inch diacolumn pipes, Loading of Submersible Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 11 Kilometer & above. |
258 | For 2.5 inch dia to 4 inch diacolumn pipes, Loading in Mechanical transport and carriage back to site of work and unloading at site.in the range of 0 to 10 kilometer. |
259 | For 2.5 inch dia to 4 inch diacolumn pipes, Loading in Mechanical transport and carriage back to site of work and unloading at site.in the range of 11 Kilometer & above. |
260 | For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 0 to 10, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
261 | For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 11 to 20, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
262 | For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 21 to 30, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
263 | For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 31 to 40, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
264 | For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 41 and above, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
265 | For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 0 to 10, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
266 | For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 11 to 20, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
267 | For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 21 to 30, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
268 | For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 31 to 40, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
269 | For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 40 and above, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
270 | For VT Pump 1.80 lac. GPH X 34.5 Mtr. Disconnecting of Power connections from starter panel, dismounting of motor using special tools and tackles, skilled man power. |
271 | For VT Pump 1.80 lac. GPH X 34.5 Mtr. Disengaging from delivery bend and extraction of VT Pump Set complete including liner assembly and pump assembly using special tool and tackles, skilled manpower, stacking of pump parts, cables. |
272 | For VT Pump 1.80 lac. GPH X 34.5 Mtr. Loading of complete pump set/motor into Mechanical Transport and carriage to workshop and unloading thereof. |
273 | For VT Pump 1.80 lac. GPH X 34.5 Mtr. Loading of complete pump set/ motor into Mechanical Transport and carriage from workshop and unloading at site. |
274 | For VT Pump 1.80 lac. GPH X 34.5 Mtr. Lowering of VT Pump Set complete including linear assembly with proper alignment, fitting of discharge head, delivery line, packing box, ratchet assembly, coupling pulley. |
275 | For VT Pump 1.80 lac. GPH X 34.5 Mtr. Mounting of motor using special tools, tackles and skilled labour. Coupling of motor. Making of connections with starter panel. |
276 | For VT Pump 1.50 lac. GPH X 45 Mtr. Disconnecting of Power connections from starter panel, dismounting of motor using special tools and tackles, skilled man power |
277 | For VT Pump 1.50 lac. GPH X 45 Mtr. Disengaging from delivery bend and extraction of VT Pump Set complete including liner assembly and pump assembly using special tool and tackles, skilled manpower, stacking of pump parts,cables. |
278 | For VT Pump 1.50 lac. GPH X 45 Mtr. Loading of complete pump set/motor into Mechanical Transport and carriage to workshop and unloading thereof. |
279 | For VT Pump 1.50 lac. GPH X 45 Mtr. Loading of complete pumpset/ motor into Mechanical Transport and carriage from workshop and unloading at site. |
280 | For VT Pump 1.50 lac. GPH X 45 Mtr. Lowering of VT Pump Set complete including linear assembly with proper alignment, fitting of discharge head, delivery line, packing box, ratchet assembly, coupling pulley. |
281 | For VT Pump 1.50 lac. GPH X 45 Mtr. Mounting of motor using special tools, tackles and skilled labour. Coupling ofmotor. Making of connections with starter panel. . |
282 | For VT Pump 0.55 lac. GPH X 30 Mtr. Disconnecting of Power connections from starter panel, dismounting of motor using special tools and tackles, skilled man power |
283 | For VT Pump 0.55 lac. GPH X 30 Mtr. Disengaging from delivery bend and extraction of VT Pump Set complete including liner assembly and pump assembly using special tool and tackles, skilled manpower, stacking of pump parts,cables. |
284 | For VT Pump 0.55 lac. GPH X 30 Mtr. Loading of complete pump set/motor into Mechanical Transport and carriage to workshop and unloading thereof. |
285 | For VT Pump 0.55 lac. GPH X 30 Mtr. Loading of complete pump set/ motor into Mechanical Transport and carriage from workshop and unloading at site. |
286 | For VT Pump 0.55 lac. GPH X 30 Mtr. Lowering of VT Pump Set complete including linear assembly with proper alignment, fitting of discharge head, delivery line, packing box, ratchet assembly, coupling pulley. |
287 | For VT Pump 0.55 lac. GPH X 30 Mtr. Mounting of motor using special tools, tackles and skilled labour. Coupling of motor. Making of connections with starter panel. . |
288 | ForDug wells, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting outPump Set complete along with column pipes by hoisting chain pulley block. Stacking of column pipes and cable properly. |
289 | ForDug wells, Loading of Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 0 to 10 kilometer |
290 | ForDug wells, Loading of Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 11 kilometers and above. |
291 | For Dug wells, Loading in Mechanical transport and carriage back to site of work and unloading at site in the range of 0 to 10 kilometers. |
292 | For Dug wells, Loading in Mechanical transport and carriage back to site of work and unloading at site in the range of 11 kilometers and above. |
293 | For Dug wells, Making of cable connection of motor with cable after dressing cable ends properly. Making of each joint water proof. Lowering of Pump Set complete along with column pipes and cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail