Rural Development Government Departments Closing in 0 days TDR #39485435

Tender For Construction Of Bridge Over Local Nala In Village Jadgad, Panchayat Morwaikala, Block- Barwadih, District- Latehar.

Issued by Government Departments · barwadih, Jharkhand
Tender Value
71.90 Lakhs
Estimated cost
Bid Submission
11 Sep 2023
0 days left
EMD
1.44 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
barwadih → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Bridge Over Local Nala In Village Jadgad, Panchayat Morwaikala, Block- Barwadih, District- Latehar.

BOQ

Name of Work:Construction of Bridge over Local Nala in Village Jadgad, Panchayat Morwaikala, Block- Barwadih, District- Latehar.
Sl. No. Item Description
1Bridge WorkEarth Work in Excavation of foundation trenches of toe wall, spillway, head regulator, outlet, intake well etc. as per designed section kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 M as per specification and direction of E/I.
2Earth Work in Excavation of foundation trenches of toe wall, spillway, head regulator, intake well and outlet etc. as per designed section in ordinary rock or soft rock (Vide classification of soil item-C) with disposal of soil (beyond 50m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 M as per specification and direction of E/I. (Soft rock where blasting is not required .
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all works upto plinth level :1:2:4 (1 cement: 2 coarse sand (zoneiii) : 4 graded stone aggregate 20 mm nominal size)
4Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached plisters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills fillets, sunken floor etc, upto floor five level, excluding the cost of shuttering, centering and finishing: 1:2:4 (1 cement: 2 coarse sand (zoneiii) : 4 graded stone aggregate 20 mm nominal size)
5Reinforced cement concrete work in walls (any thickness) including attached plisters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto floor five level, excluding the cost of shuttering, centering and finishing: 1:1.5:3 (1 cement: 1.5 coarse sand (zone iii) : 3 graded stone aggregate 20 mm nominal size)
6Providing weep holes in brick masonary/plain/reinforced concrete abutment, wing wall/return wall with 100mm dia AC Pipe, extending through the full width of the structure with slope of 1V:20H towards drawing force . compltete as per drawing and technical specifications.
7E/W in flood embankmet, canal banks as well as special repair of embankment in canal bank in grade A & B types of soil (vide soil - A and B) in proper profile excavation by hydraulic m/c and carriage by tipper truck obtained from borrow area or any other sources free from logs, roots or any other ingredients with all lifts including breaking clods to maximum 60mm size, placing earth in layers not exceeding 225mm thick all complete as per specification and direction of E/I. (As per TEC Letter No. 587 Dated 22.09.2006)Lead Beyond 1/2 KM but upto 1 KM
8Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 landings, balconies, shleves, chajjas, lintels, bands, plain window sills, staircase and spiral staircases above plinth level upto floor five level, excluding the cost of shuttering, centering and finishing: 1:1.5:3 (1 cement: 1.5 coarse sand (zone iii) : 3 graded stone aggregate 20 mm nominal size)
9Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached plisters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills fillets, sunken floor etc, upto floor five level, excluding the cost of shuttering, centering and finishing: 1:1.5:3 (1 cement: 1.5 coarse sand (zoneiii) : 3 graded stone aggregate 20 mm nominal size)
10Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting
11Providing T.M.T. reinforcement (tor steel) ( round bars confirming to IS 432 dian in mm) as per approved design, drawing, removal of rust, cutting, bending, binding including supplying annealed wire, placing m.S. rods in position all complete as per specification and direction of E/I. ( only valid for Tata (Tiscon), SAIL, JSPL, Electrosteel Steels limited Bokaro and Vizag (RINL).8mm dia
1210mm dia (TMT coil)( only valid for Tata (Tiscon), SAIL, JSPL, Electrosteel Steels limited Bokaro and Vizag (RINL).
1312mm dia & 20mm dia (TMT coil)( only valid for Tata (Tiscon), SAIL, JSPL, Electrosteel Steels limited Bokaro and Vizag (RINL).
14Providing and laying boulder apron on river bed for protective against scour with stone boulders weighing not less than 40kg each complete as per drawing and technical specification
15Providing shuttering including strutting, proping etc. and its removal after use in foundation as per specification and direction of E/I.
16Providing shuttering including strutting, proping etc. and removal after use in superstructure portion of various components of barriage work as per specification and direction of E/I.
17Providing centering including strutting and proping and removal after use in deck slab as per specification and direction of E/I.
18Providing 12mm thick cement plaster (1:3) with approved quality of sand of requisite F.M. (1.5)including screening,curing with all leads and lifts of water, scaffoldingall taxes and royalty etc. complete job as per specification and direction of E/I.
19Providing and fixing in position bitumen filler (bitumen, cement and sand in constrution joints complete job as per specification and direction of E/I.
20Dewatering during the working period with 5 H.P. Diesel Set complete job as per specification and direction of E/I.
21Carriage of MaterialsCement Lead 17 K.M.
22Steel Lead 17 K.M.
23Sand Lead 16 K.M.
24Boulder Lead 30 K.M.
25Stone Chips Lead 27 K.M.
26Guard WallEarth Work in Excavation of foundation trenches of toe wall, spillway, head regulator, outlet, intake well etc. as per designed section kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 M as per specification and direction of E/I.
27Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all works upto plinth level :1:2:4 (1 cement: 2 coarse sand (zoneiii) : 4 graded stone aggregate 20 mm nominal size)
28Stone masonry in cement mortar (1:3) in foundationcomplete as per drawing and Technical specification. (b) Random rubble masonary
29Stone masonary work in cement mortar (1:3) for sub structure complete as per drawing and technical specifications.(A) Random rubble masonary
30Plastering with cement mortar (1:3) on brickwork in substructure as per technical specifications.
31Earth Work in Filling foundation trenches or back filling of masonary structure with suitable earth inlayer not exceeding 150mm thick well watered , rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift of 1.5m complete as per specification and direction of E/I.
32Earth Work in Filling foundation trenches or back filling of masonary structure pervious soil in layer not exceeding 150mm thick well watered , rammed and fully compacted and finally drassed with earth obtained from borrow pits beyond 150m fead but upto 1/2 Km. with all lifts and carriage by truck including,loading unloading, spreading , construction and maintenance of haul road etc. as per specificatio and direction of E/I
33Providing weep holes in brick masonary/plain/reinforced concrete abutment, wing wall/return wall with 100mm dia AC Pipe, extending through the full width of the structure with slope of 1V:20H towards drawing force . compltete as per drawing and technical specifications.
34Carriage of MaterialsCement Lead 9 K.M.
35Sand Lead 15 K.M.
36Boulder Lead 35 K.M.
37Stone Chips Lead 35 K.M.
38Approach RoadEmbankment construction with material obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading grading to required slope and compacting to meet requirement of table 300-2)Rolling with smooth wheeled roller.
39Construction of granular sub-base by providing close graded materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, andcompacting with vibratory roller to achieve the desired density, complete as per clause 401)
40Water Bound mecadam (providing laying, speading and compacting stone aggregate of specific size to water bound mecadam specification including spreading in uniform thickness hand packing, rolling with vibrator roller 8-10 tones/smooth 3 wheeled steel roller reuisite type of screening/binding materilas to fill up the interstices of coarse aggregate, watering and compacting type such as moorum or Gravel with smooth 3 wheeled steel roller grading.
41Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level M 150 1:2:4(1cement 2Coarse sand (zoneiii) 4graded sone Aggregat 20mm nominal size.
42Carriage of MaterialsMetal Lead 30 K.M.
43Moorum Lead 2 K.M.
44Cement Lead 17 K.M.
45Sand Lead 16 K.M.
46Stone Chips Lead 27 K.M.
47Add GST 18% Sl No 1.00 to 46.00
48Add Labour Tax @ 1% of total amount of Item no. 1.00 to 47.00

AI Tender Summary

OUR REF NO 39485435
AUTHORITY Government Departments
TENDER VALUE 71.90 Lakhs
LAST DATE 11-09-2023
Authority
Authority Name Rural Development Department
Work Description Construction Of Bridge Over Local Nala In Village Jadgad, Panchayat Morwaikala, Block- Barwadih, District- Latehar.
Basic Detail
Tender No ZP/LATEHAR/14/2023-24/ Gr_05(2nd Call)
Bidding Type Tender
Location
City barwadih
State Jharkhand
Key Dates
Publish Date 05 Sep 2023
Submission Date 11 Sep 2023
Open Date 13 Sep 2023
Finance
Tender Value 71.90 Lakhs
Tender Fee 10000
EMD 1.44 Lakhs
Exemption Not Available
Document List
9723e375-b9a8-4da0-9052-8a449f01c31f.html
BOQ_100998.xls
Group_05.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 05, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 11, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 13, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

9723e375-b9a8-4da0-9052-8a449f01c31f.html

xls

BOQ_100998.xls

pdf

Group_05.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders