}

Tender For Consultancy Services For Preparation Of Feasibility Study And Dpr For Construction Of R.O.B. At :-1) L/C No. 1/Class A Safiyasarai Ch. 71+970 Of Nh-802) L/C No. 5/Spl/T Shivnarayanpur Ch. 171+300 Of Nh-803) L/C No. 2/C-T(Spl) Mirzachowki Ch. 18, bhagalpur-Bihar

Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Preparation Of Feasibility Study And Dpr For Construction Of R.O.B. At :-1) L/C No. 1/Class A Safiyasarai Ch. 71+970 Of Nh-802) L/C No. 5/Spl/T Shivnarayanpur Ch. 171+300 Of Nh-803) L/C No. 2/C-T(Spl) Mirzachowki Ch. 18. Submission Date for this Tender is 18-10-2023. Consultancy Service Tenders in bhagalpur Bihar. Bidders can get complete Tender details and download the document.




Tender Notice

39480867
Tender For Consultancy Services For Preparation Of Feasibility Study And Dpr For Construction Of R.O.B. At :-1) L/C No. 1/Class A Safiyasarai Ch. 71+970 Of Nh-802) L/C No. 5/Spl/T Shivnarayanpur Ch. 171+300 Of Nh-803) L/C No. 2/C-T(Spl) Mirzachowki Ch. 18
Open Tender
Indian
Bihar
bhagalpur
18-10-2023

Tender Details

Consultancy Services For Preparation Of Feasibility Study And Dpr For Construction Of R.O.B. At :-1 ) L / C No. 1 / Class A Safiyasarai Ch. 71+970 Of Nh-802 ) L / C No. 5 / Spl / T Shivnarayanpur Ch. 171+300 Of Nh-803 ) L / C No. 2 / C-T ( Spl ) Mirzachowki Ch. 188+200 Of Nh-804 ) L / C No. 13 / C Madhubani Ch. 7+900 Of Nh-527A ; 1 Key Personnel : 2 Team Leader Cum Senior Highway Engineer 3 Senior Bridge Engineer 4 Highway Cum Pavement Engineer 5 Material Cum Geotechnical Engineer - Geologist 6 Senior Survey Engineer 7 Traffic And Safety Expert 8 Environmental Specilist 9 Quantity Surveyor / Documentation Expert 10 Land Acquisition Expert 11 Utility Expert 12 Sub-Professional Staff : ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub Professional Be A Fresh Graduate ) 13 .. 14 .. 15 .. 16 .. 17 .. 18 .. 19 .. 20 Support Staff : 21 Office Manager 22 Typist 23 Office Boy 24 Night Watchman 25 Transportation ( Fixed Costs ) 26 The Vehicles Provided By The Consultants Shall Include The Cost For Rental Drivers Operation, Maintenance, Repairs, Insurance Etc., A. For Use Of Consultant 27 Duty Travel To Site ( Fixed Costs ) : 28 Office Rent ( Fixed Costs ) The Rent Includes Maintenance, Cleaning, Repairing Etc., 29 .. 30 Office Supplies, Utilities And Communications ( Fixed Costs ) 31 Office Supplies 32 Drafting Supplies 33 Computer Running Costs 34 Domestic And International Communication 35 Office Furniture And Equipment ( Rental ) 36 Office Furniture And Ecquipment ( L.S ) 37 Reports & Documents Printing ( For Clubbed Projects ) 38 Monthly Report ( 3Copies Per Month ) 39 Inception Report & Qap 40 Environment And Social Impact Screening Report 41 Draft Feasibility Report 42 Final Feasibility Report 43 Strip Plan With La Reports 44 Draft La And Clearances I Report 45 Final La And Clearances I Report 46 Draft Environmental Assessment Report & Rap 47 Final Environmental Assessment Report And Rap 48 Draft Detailed Design Report & Drawings Etc. 49 Draft Emp 50 Draft Bidding Documents 51 Final Detailed Project Report With Bill Of Quantities, Cost Estimates, Updated Drawings Etc. 52 Final Emp. 53 Final Bidding Documents 54 Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 3 Copies Each ) 55 La & Clearances Ii Report 56 Survey And Investigation 57 Topographic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc. Inclusive Of Cost Of Materials, Labourer. 58 Detailed Topographic Surveys Using Mobile / Aerial Lidar Or Better Technology 59 Investigation ( Fixed Cost ) 60 Road And Bridge Inventory 61 Fwd Test And Pavement Evaluation 62 Roughness Survey 63 Axle Load Survey 64 Material Survey And Investigation 65 Sub-Grade Investigation 66 Traffice Survey 67 Socio-Economic & Census Survey / Studies 68 Land Acquisition Studies 69 Any Other Investigations / Surveys 70 Sub-Soil Investigation ( Boring ) 71 A ) Boring In All Type Of Soils ( Other Than Hard Rock ) 72 B ) Boring In Hard Rock 73 Network Survey And Gpr 74 Network Survey Of The Existing Highways As A Repository For Civil Works As Per Directions From Authority 75 Gpr Survey For Detection Of Under Ground Utilities 76 Cost Of Supply And Fixing Boundary Pillars 77 Procuring And Fixing Boundary Pillars And Its Installation, Complete In All Respect As Per Irc:25, 1967: Wherever The Proposed Alignment Follows The Existing Alignment, The Boundary Pillars Shall Be Fixed Atan Interval Of 200M On Either Side Of Proposed Right Of Way. Wherever There Is A Proposal Of Realignment Of The Existing Highway And / Or Construction Of New Bypasses, Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval. ( Lumpsum ) 78 Land Acquisition Team Including Support Staff And Logistics / Transportation 79 Ex-Land Revenue Inspector / Officer Or Equivalent 80 Ex-Kanoogo / Girdwar Or Equivalent 81 Ex-Patwari Or Equivalent 82 Typist 83 Peon 84 B. Logistics For Land Acquisition Team 85 Computer Including Necessary Peripherals 86 Printers 87 Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km 88 Estimate Of Costs For Expatriate Consultants ( In Indian Rupees ) 89 I. Remuneration Of Expatriate Staff Including Per Diem Allwances 90 Ii.Mobiliation And Demobilization 91 1. International Airfares ( Fixed Costs ) 92 Total Cost Net Of Tax: 93 I.Income Tax ( Expatriate Staff ) 94 Ii.Other Taxes / Duties ( If Any ) Specify Clearly 95 Goods And Service Taxes @ 18%

Key Value

Document Fees
INR 5000 /-
EMD
INR 200000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Consultancy Services for Preparation of Feasibility Study and DPR for Construction of R.O.B. at :- 1) L/C No. 1/Class A Safiyasarai Ch. 71+970 of NH-80 2) L/C No. 5/SPL/T Shivnarayanpur Ch. 171+300 of NH-80 3) L/C No. 2/C-T(SPL) Mirzachowki Ch. 188+200 of NH-80 4) L/C No. 13/C Madhubani Ch. 7+900 of NH-527A
Sl. No. Item Description
1KEY PERSONNEL :
2Team Leader cum Senior Highway Engineer
3Senior Bridge Engineer
4Highway cum Pavement Engineer
5Material cum Geotechnical Engineer - Geologist
6Senior Survey Engineer
7Traffic and Safety Expert
8Environmental Specilist
9Quantity Surveyor / Documentation Expert
10Land Acquisition Expert
11Utility Expert
12SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
13..
14..
15..
16..
17..
18..
19..
20SUPPORT STAFF :
21Office Manager
22Typist
23Office Boy
24Night Watchman
25Transportation (Fixed Costs)
26The Vehicles Provided by the consultants shall include the cost for rental drivers operation, maintenance, Repairs, insurance etc., A. For use of Consultant
27Duty Travel to Site(Fixed Costs):
28Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc.,
29..
30OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)
31Office Supplies
32Drafting Supplies
33Computer Running Costs
34Domestic and International Communication
35OFFICE FURNITURE AND EQUIPMENT (Rental)
36Office Furniture and Ecquipment( L.S)
37REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects)
38Monthly report (3copies per Month)
39Inception Report & QAP
40Environment and Social Impact Screening Report
41Draft Feasibility Report
42Final Feasibility Report
43Strip Plan with LA Reports
44Draft LA and Clearances I Report
45Final LA and Clearances I Report
46Draft Environmental Assessment Report & RAP
47Final Environmental Assessment Report and RAP
48Draft Detailed Design Report & Drawings etc.
49Draft EMP
50Draft Bidding Documents
51Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
52Final EMP.
53Final Bidding Documents
54Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
55LA & Clearances II Report
56Survey and Investigation
57Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
58Detailed topographic surveys using mobile / aerial LiDAR or better Technology
59Investigation (Fixed Cost)
60Road and Bridge Inventory
61FWD Test and Pavement Evaluation
62Roughness Survey
63Axle Load Survey
64Material Survey and Investigation
65Sub-grade Investigation
66Traffice Survey
67Socio-economic & Census Survey/Studies
68Land Acquisition Studies
69Any other Investigations/Surveys
70Sub-Soil Investigation (Boring)
71a) Boring in all type of soils (other than hard rock)
72b) Boring in hard rock
73Network Survey and GPR
74Network Survey of the existing Highways as a repository for civil works as per directions from Authority
75GPR Survey for detection of under ground utilities
76Cost of Supply and Fixing Boundary pillars
77Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
78Land Acquisition Team including support staff and logistics/ transportation
79Ex-Land Revenue Inspector/ Officer or equivalent
80Ex-Kanoogo/Girdwar or equivalent
81Ex-Patwari or Equivalent
82Typist
83Peon
84B. Logistics for Land Acquisition Team
85Computer including necessary peripherals
86Printers
87Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km
88Estimate of Costs for Expatriate Consultants (in Indian Rupees)
89I. Remuneration of Expatriate Staff including per diem allwances
90II.Mobiliation and Demobilization
911. International Airfares (Fixed Costs)
92Total Cost Net of Tax:
93I.Income Tax (Expatriate Staff)
94II.Other Taxes/ duties (if any) Specify Clearly
95Goods and Service Taxes @ 18%
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail