Tender For Revival And Renovation Of Bolonda-Ii Rlp Under Nuagaon Block In Nayagarh District Under State Plan 2023-24
Tender Value
18.52 Lakhs
Estimated cost
Bid Submission
13 Sep 2023
0 days left
EMD
18521
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nuagaon → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Revival And Renovation Of Bolonda-Ii Rlp Under Nuagaon Block In Nayagarh District Under State Plan 2023-24
BOQ
| Sl. No. | Item Description |
| 1 | Supply all labour,T & P, Earth work in excavation of foundation in Hard soil within 50mtr initial lead and 1.5mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per direction of the Engineer in charge.(including 1% labour cess) |
| 2 | Supplying all materials, labour, T&P and filing foundation and plinth with sand well watered and rammed including conveyance of all materials to worksite, payment of royalty, taxes etc. complete all as per direction of the Engineer-in-charge.(including 1% labour cess) |
| 3 | Supplying all materials, labour, T&P and providing cement concrete (1:4:8) with 4cm size crusher broken black hard granite metal including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. l completeall as per specification and direction of the Engineer-in-charge..(Excluding Empty cement Bag).(including 1% labour cess) |
| 4 | Supplying all materials, labour, T&P and providing cement concrete (1:2:4) with 12mm size crusher broken black hard granite metal including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc.complete all as per specification and direction of the Engineer-in-charge..(Excluding Empty cement Bag).(including 1% labour cess) |
| 5 | Supplying all materials, labour, T&P and providing cement concrete (1:2:4) for RCC work with 12mm size crusher broken black hard granite metal including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of the Engineer-in-charge..(Excluding Empty cement Bag).(including 1% labour cess) |
| 6 | Supplying all materials, labour, T&P and providing brick work with FLy Ash. bricks (25x12x8mm) Size, having crushing strength not less than 75kg / sqcm with dimensional tolerance ± 8 percent in C.M (1:6) in F&P including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etccomplete all as per specification and direction of the Engineer-in-charge. (Excluding Empty cement Bag). (including 1% labour cess) |
| 7 | Supplying all materials, labour, T&P and providing brick work with FLy Ash. bricks (25x12x8mm) Size, having crushing strength not less than 75kg / sqcm with dimensional tolerance ± 8 percent in C.M (1:6) in suypper structure including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etccomplete all as per specification and direction of the Engineer-in-charge. (Excluding Empty cement Bag). (including 1% labour cess) |
| 8 | Supplying all materials, labour, T&P and filing foundation and plinth with excavated materials within 50mtr initial lead and 1.5mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth and as per direction of the Engineer in charge.(including 1% labour cess ) |
| 9 | Supplying all materials, labour, T&P and providing 12mm thick cement plaster (1:6) over Brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of the Engineer-in-charge. (including 1% labour cess) |
| 10 | Supplying all materials, labour, T&P and providing cement punning over plastering including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of the Engineer-in-charge. (including 1% labour cess). |
| 11 | Supplying all materials, labour, T&P and providing Rigid and smooth centering and shuttering for RCC works with steel shuttering plates and dismantling them after casing including cost of materials complete in wall of T.Tanks etc. (including 1% labour cess). |
| 12 | Supplying all materials, labour, T&P and providing HYSD bar reinforcement for R.C.C. work including cutting, bending, binding and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer-in-charge. (SAIL TMT EQR/IS-1786 FE500 D) (including 1% labour cess) |
| 13 | Supplying all materials, labour, T&P and providingpainting two coat with approved paint etc complete(including 1% labour cess) |
| 14 | Supplying all materials, labour, T&P forLabour charges for laying & fitting of 200 mm ? PVC Pipe (including 1% labour cess). |
| 15 | Supplying all materials, labour, T&P for Writing of Display Board in Black colourband. (including 1% labour cess). |
| 16 | Supplying all materials, labour, T&P and providing of out let |
| 17 | Cost of Full thread Nut & Bolt ( 5/8\"x3\"),3/8\"X3\",1/2\"X2\" (Heavy Duty) |
| 18 | Cost of 3mm (1/8) Rubber Inseration. |
| 19 | Cost of Mono block centrifugal pump set 1700 LP M at 18mtr head 10 HP/ 7.46 KW squirrel cage induction motor with companion flanges and class-F insulation suitable for operation at 415 volt +6% - 15% 3 phase 50Hz AC power supply confirming to IS 9079/2002 with ISI mark & guarnatee period & inclusive of cost of transportation to site. The manufacturer should be a reputed company having wide dealership network and the spare parts should be easily available. The materials of construction as given below.(a) Casing FC 200 as per IS 210/1981 (b) Imperler : Bronze grade LTB - 2 of IS 318/1981 (C) Shaft : High carbon steel grade 40 c 8 of IS 1570(part 2) (d) Gasket: As per IS 5120/1977.NB: Pump set to be tested at PTL,OLIC, Bhubaneswar at random at contractor\"s cost. |
| 20 | Control Panel with Automatic Star Delta starter sheet steel enclosure for operation of squirrel cage induction motor upo 15 HP with 16 Amp (AC-3) contactor at 415 volt +6%-15%, 3 phase, 50 Hz, AC supply with suitable overload relay & No volt coil with electric pnemutic timer suitable for operation at voltage range of 300-440 volt including cost of transportation to site. The starter should provide dependable protection against overload and single phasing & should be of reputed brand having wide dealership network for easy availability of spares.NB: Starter will be sent to PTL, OLIC, Bhubaneswar at random for necessary testing at the contractor\"s cost. |
| 21 | Cost of 63 AMP T.P.mainswith confirming to IS No 4064 (Part I & II) with ISI marking of reputed company with utilisation capacity cagegory AC-22. |
| 22 | Motor Hood cover of size 0.6M*0.45M*0.45M made out of 18 gauge C. R. Sheet painted with two coats of enamel paint over a coat of red oxide primer. A dandle to be welded on the top of the hood. |
| 23 | Base frame of suitable size made up of 75mm channel having suitable holes for fitting of the pumpsets mentioned at SI . No. 10 above, painted with two coats of enamel paint over a coat of red oxide primer. |
| 24 | 4 KVAR Capacitor (including 1%cess) |
| 25 | 3*10 sqmm PVC insulated (HD) tropoder armoured Electric Cable with alluminum conductor for use in 3 phase power system of working voltage upto & including 1100 volts at 50Hz confirming to IS 1554 (Pt-5)/1988 including cost of transportation to site. |
| 26 | 4mm2PVCwire with ISI marking of reputed company. |
| 27 | Cost of 100mm dia nominal bore G.I. pipe having wall thickness 4.5mm electrical resistance welded of medium class confirming to IS- 1239(part-1/2004) with latest ammendments, screwed at both ends as per IS - 554 with socketed at one end and the other end protected with plastic threaded protector including its transportation and unloading at L.I.P site . The socket confirming to ISI 1239(part-II/1992) with latest ammendments in random length of 4 to 7 mtr . Each pipe should bear IS: certification and manufacturers name/trade mark. |
| 28 | Unplasticised rigid UPVC pipe 200mm dia ivory grey in colour having specific gravitity of 1.40 to 1.46 gms/cc of straight length of 6 (six) mtrs for portable water supplies confirming to IS-4985/2000 of BIS- ammendments-2 read with table I of IS- specification bearing ISI marks for working pressure & Class I UPVC pipe to withstand pressure of 2.5Kgf/sqcm and the specification and manufacturer name should be prominently marked on body of each pipe as per latest Amendment of IS- 4985. It includes the cost of sockets in case of plain ended pipes. PDI test are tobe conducted and should be marked on body of the each pipe & report is tobe abtained from CIPET, Bhubaneswar/EPM. Orissa, BBSR for necessary approval of authority. |
| 29 | Cost of 200 mm x200 mm x110 mm ØWeldless G.I. Tee (3.6mm Thickness) with bend, closing and opening arrangement of reputed company |
| 30 | Cost of100 mmdia G. I. Bend confirming to IS No. 1239(part ii/ 1992) with ISI marking. |
| 31 | Cost of 100mm dia G.I.Flange confirming to IS No. 6392/1971 with ISI marking. |
| 32 | Cost of 100 mmdia Cl screw boit footvalve with ISI mark of reputed company having wide dealership network. |
| 33 | Cost of 100 mm dia N. R valve confirming to IS 53129part-I) with ISI mark G. Mfitting S/S hingepin with bypass arrangement. |
| 34 | Cost of 50 mmdia C. I Air release valve (single action ) confirming to IS 14845(SI) with ISI marking with sadle riser pipe etc. |
| 35 | Cost of 200 mm x200 mm x200mm Ø PVC Equal Tee (6 Kgf/cm²) |
| 36 | Cost of 200 mm Ø PVC End Cap (6 Kgf/cm²) |
| 37 | Cost of 200 mm Ø PVC coupler(6 Kgf/cm²) |
| 38 | Cost of 100x100x25mm dia G. I. Tee with 25mm dia plug confirming to IS- 1239 (part II/1992) |
| 39 | 200 mmx100 mm PVC Reduceing Socket (6 Kgf/cm²) |
| 40 | Cost of 110 mm F P.V.C.Tail Piece(6 Kgf/cm²) |
| 41 | Cost of 110 mm F P.V.C.Flange(6 Kgf/cm²) |
| 42 | Cost of 110 mm F P.V.C Pipe (6 Kgf/cm²) |
| 43 | Misc. Welding charges for \"Z\" joint, \"S\" bend, etc. |
| 44 | 200mm dia C.I. Butter Fly Valve BS-5155/15: 13095-CI MOC Lever Operated PN-1.0 with ISI mark of reputed company |
| 45 | Labour charges for delivery andfitting including fitting of priming Tee, sluice Valve, NR Valve, air release valve and riser Teeincluding Cutting Threadingof 100 mm dia. G.I.Pipesetc and installation |
| 46 | Supplying all materials, labour, T&Pf or River Bank cutting & shaping for const. of P.F. |
| 47 | Cost of 300 mm R.C.C. hum pipe( NP 3 )as per specificationsincluding laying & fitting |
| 48 | Cost of extra eartwork Exacavation and filling as per norms for road cross, foot path , ridges along the pressure pipeline |
| 49 | Supply all material, labour,T & P and Construction of 11KV 3 phase 3 wireHT line(40mtr average span length) with 9mtr long 300kg PSC pole supported and 55 sqmm AAA conductoras per RE standard and TPCODL specification asper line diagram, including painting in Navy blue colour band with inscription of OLIC etcin eachpole etc complete all as per dirction of EIC.. |
| 50 | Supply all material, labour,T & P and Construction of 11/0.4 KV 25KVA (BIS-LEV-II star rated) double pole mounted sub-station with 9 mtr long 300kg PSC pole supported and90Amp MCCB with all materials required as per RE standard and TPCODL specification and G.I. Chain linking fencing with gate, sand filling and metal spreding etc. complete all as perper dirction of EIC.. |
| 51 | Supply all material, labour,T & P and Construction of3 phase 4 wireLT line(33mtr average span length) with 9mtr long 300kg PSC pole with 3X35+1X25)sqmm AB Cable as per RE standard andTPCODL specification, as per line diagramincluding painting in Navy blue colour band with inscription of OLIC in each pole etc. pole complete allas per dirction of EIC.. |
| 52 | Supplyingall cost of abour , materials and T & P and providingof L T Distribution.Box including installation and fittings ofin the sub station (including 1%cess) |
| 53 | Supplying all materials, labour, T&P and Earthing installationincluding excavation of two nos of earth pits of size 1.2 mtr x1.2mtrx2.5 mtr and filling the earth pit with alternative layer of 0.60mtr x0.60mtr x0.30 mtr of common slat and charcoal around theG.I. pipe (40 mm dia & 6mtr) including allcost of salt, charcoal, 100amp cable socket, soft solder, G.I. nut bolts , 40mm dia G.I.pipe 6 m and No.8 GI Wire 10 Kg including tranportation of materials to site .etc complete all.as per dirction of EIC.. |
| 54 | Supplying all materials, labour, T&P and Electrical Installation & energisation including Wiring , Clipping, andfitting of starter, main switch etc.complete all .as per dirction of EIC.. |
AI Tender Summary
Tender Timeline
Sep 04, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedSep 13, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 14, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender