|
| 1 | Survey, Supply, Transportation, Carriage, Erection,Testing and Commissioning for Erection of 11 KV Tapping point at Mid Span at CTEP Site-I Battal BallianUdhampur. |
| 2 | 9 mtr. Long PCC Pole (PCC-WL-300 kg) |
| 3 | GI Channel X-arm including clamps and Angle for braces |
| 4 | 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp vertical |
| 5 | 50mm² ACSR Rabbit conductor |
| 6 | PG Clamps |
| 7 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 8 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75KVPositive and 80 KV Negative, creepage distance 320mm with fitting |
| 9 | Galvanized Nuts and Bolts |
| 10 | Danger Plates with Clamps |
| 11 | Anti climbing device with clamps |
| 12 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
| 13 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 14 | Survey, Supply, Transportation, Carriage, Erection,Testing and Commissioning for Erection of 11 KV line on 9 mtr. PCC poles, 50mm² ACSR Rabbit Conductor at CETP Site-I Battal Ballian Udhampur. |
| 15 | 9 mtr. Long PCC Pole (PCC-WL-300 kg) |
| 16 | GI V Cross -arm with top Bracket including clamps |
| 17 | GI Channel X-arm including clamps and Angle for braces |
| 18 | 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp vertical |
| 19 | 50mm² ACSR Rabbitconductor |
| 20 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 21 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75KVPositive and 80 KV Negative, creepage distance 320mm with fitting |
| 22 | Galvanized Nuts and Bolts |
| 23 | Danger Plates with Clamps |
| 24 | Anti climbing device with clamps |
| 25 | Earthing complete byGI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm |
| 26 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
| 27 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 28 | Survey,supply, Transportation, Carriage, Erection,Testing and Commissioning for Erection of 120mm² LT ABC on 9 mtr. PCC pole for 250 KVA Sub station at CETP Stage-I (Battal Ballian Udhampur) |
| 29 | 9 mtr. Long PCC poles (PCC-WL-300 Kg) |
| 30 | 120mm² AB(LT) cable (3x120+1x16+1x70mm²) XLPE (1.1 KV, 3+1C, Al) |
| 31 | Suspension/Tension clamp with eye hook |
| 32 | Straight through cable jointing kit |
| 33 | Galvanized Nuts and Bolts. |
| 34 | Danger Plates with Clamps |
| 35 | Anti climbing device with clamps |
| 36 | Insulating piercing connectors |
| 37 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
| 38 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 39 | Survey, Supply, Transportation, Carriage, Erection,Testing and Commissioning for Stabilization/improvement of 11 KV line on 9 mtr. PCC poles, 50mm² ACSR Rabbit Conductor at CETP Site-I Battal Ballian Udhampur. |
| 40 | 9 mtr. Long PCC Pole (PCC-WL-300) |
| 41 | 11 mtr. Long poles (ST-410 SP56) |
| 42 | GI V Cross -arm with top Bracket including clamps |
| 43 | GI Channel X-arm including clamps and Angle for braces |
| 44 | 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp vertical |
| 45 | 50mm² ACSR Rabbitconductor |
| 46 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
| 47 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75KVPositive and 80 KV Negative, creepage distance 320mm with fitting |
| 48 | Galvanized Nuts and Bolts |
| 49 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
| 50 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 51 | PG Clamps |
| 52 | Survey, Supply, Transportation, Carriage, Erection,Testing and Commissioning for Stabilization/improvement of LT Line of 3 Phase 5 wire LT 100mm ACSR Dog conductor line on 9 mtr. PCC poles at CETP Stage-I Battal Ballian Udhampur. |
| 53 | 9 mtr. Long PCC Pole (PCC-WL-300 Kg) |
| 54 | GI U-Clamps for Shackle insulator |
| 55 | 100mm² ACSR Dog Conductor |
| 56 | LT Shackle insulator |
| 57 | Galvanized Nuts and Bolts. |
| 58 | Danger Plates with Clamps |
| 59 | Anti climbing device with clamps |
| 60 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
| 61 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 62 | Survey,Supply, Transportation, Carriage, Erection,Testing and Commissioning for installation of 250 KVA Substationalongwith CT/PT unit & Trivector meter at CETP Site-I Battal Ballian Udhampur |
| 63 | 11/0.433 KV, 3-phase distribution Transformer 250 KVA with Bimetallic Terminal Connectors Energy Level-2 CopperWound, & with LV Cable box having detachable Aluminium Gland plate |
| 64 | Gapless surge Arrestor, 9 kv, 10 KA , LA with polymer housing stn. Type |
| 65 | 11 KV GO AB Switch 3 phase, 3 pole, 200 Amp, vertical |
| 66 | 11 KV Horn gap fuse set 3 phase 200 A |
| 67 | 400mm² 1.1 KV Grade, PVC insulated stranded conductor FRLS Type |
| 68 | 9 mtr. Long ST pole (ST-410 SP33) |
| 69 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75Positive and 80 KV Negative, creepage distance 320mm with fitting |
| 70 | GI Channel /Angle/flat of sizes including clamps |
| 71 | Galvanized Nuts and Bolts. |
| 72 | Earthing of sub stn. Excavation of earth pit of dia 650mm & depth 3000mm installation of earthing pipe of 40mm Nominal bore & 4mm wall thickness & length 2.5 mtr. Long as per IS 1239. G.I Strip for neutral earthing of size 25mmx3mmfor connection of transforemr body, GO Set & lightening arrestor as per IS 2629/85, GI Nuts & bolts refilled with earth enhancement materials and earth chamber with RCC Slab cover |
| 73 | 11 KV Polymer composite pin insulator, 12 KV, 5KN Lightening impulse 75 KV Positive and 80 KV Negative, creepage distance 320mm |
| 74 | LT distribution box for 250 KVA DTR with MCCB for incomer and SFU\"s for outgoing circuits |
| 75 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 76 | Danger Plates with Clamps |
| 77 | GI Barbed wire for Anticlimbing |
| 78 | 3-phase HT Trivector meter with CT PT Unit |
| 79 | 10 Core cable for CT/PT unit of 2.5mm (PVC) |
| 80 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
| 81 | Painting of ST poles 9 mtr. long with 1 coat of Red oxide & 2 coat of Al. paint |