Tender For Construction Of Vertical Soakpit 2 At Ponneri Panchayat In Package No.Tn04-02-27/ Aip-2023-24-Sbm(G)-Vsp-Harur Block P27 /Sbm & 15Th Fc 2023-2024 Harur Block
Tender Value
1.41 Lakhs
Estimated cost
Bid Submission
14 Sep 2023
0 days left
EMD
1410
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
harur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Vertical Soakpit 2 At Ponneri Panchayat In Package No.Tn04-02-27 / Aip-2023-24-Sbm ( G ) -Vsp-Harur Block P27 / Sbm & 15Th Fc 2023-2024 Harur Block
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Vertical soakpit 2 at Ponneri Panchayat |
| 2 | Earth work excavationfor foundtion in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and balingout water wherever necessary as per SS 20B |
| 3 | Cement concrete 1:4:8 mix using 40mm Size HBG metal including cost and including cost andconveyance of all materials to sitelabour charges forlaying Consolidation curing etc. |
| 4 | Below Ground Level. Centering Charges inclusive Centering Charges inclusive of all material and labour charges etc., complete as per standard specification. |
| 5 | Cement concrete 1:3:6 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. |
| 6 | Plastering with cement mortar 1:4 mixto 20 mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 7 | Earth work excavation and deposting on bank with in initial lead of 10 m and initial lift of 2 m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 8 | Cement concrete 1:4:8 mix using40mm ISS metal including cost and conveyance of all materials to site labour charges for Mixing , laying and curingetc complete |
| 9 | Supplying and erecting of steelcentring charges inclusive centring charges inclusive ofallmaterials andlabour charges etc., Comptete as per standard specification. |
| 10 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 11 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete |
| 12 | Supplying and filling with rough stone to a height of 0.45m from an approved quarry including all cost and conveyance materials and all labour charges etc., |
| 13 | Supplying and filling with 40mm metal from an approved quarry including all cost and conveyance materials and all labour charges etc., |
| 14 | Supplying and filling with 20mm metal from an approved quarry including all cost and conveyance materials and all labour charges etc., |
| 15 | supplying and filling with char coal including all cost and conveyance of men and materials etc., all complete |
| 16 | supply and filling with 20mm brick jelly from an approved quarry including all cost and conveyance of men and materialsetc., all complete |
| 17 | supply and filling with red gravel from an approved quarry including all cost and conveyance of men and materials etc., all complete |
| 18 | supply and delivery of 110mm dia6Ksc PVC pipe including cost and conveyance to the site etc., all complete |
| 19 | Refilling the basement with excavated earthStandard specification |
| 20 | Supplying and delivery of 1.00 m dia RCC ring including cost and conveyance of men and materials etc., all complete |
| 21 | Supplying and delivery of 1.00 m dia RCC Slab including cost and conveyance of men and materials etc., all complete |
| 22 | Provision for Name Board charges |
| 23 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Sep 02, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedSep 14, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 14, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender