| 1 | Description of items and specification ofwork to be excuted. |
| 2 | Erection of metallic / tubular scaffolding for detail drawing and documentation (cup & lock type M.S tubes, M.S challies, M.S. clamps) consisting of two rows of vertical secured or leashed together with horizontal and diagonal bracing and connecting to the structure at convenient point for better stability surrounding the Sikharaand propping of critical areas to provide effective supports before commencement of taking out / dismantling operationswith essential safety features (safety belt and helmet etc. ) for the workmanship etc. complete. (Labour work only) |
| 3 | Earth work excavation layer by layer including side and bottom dressing, by manually within a lead of 50 m. and disposal of unwanted soil by mechanical transportation 5km away from site. (Labour work only) |
| 4 | Providing and laying lime concretewith 50% lime mortar 1:1:1 (1:lime, 1:surkhi, 1 c. sand ) mix with belgiri solution and stone aggregate of 20 mm nominal size including compaction curing etc. complete. (Labour work only) |
| 5 | Providingand layingstoneflooring using new stone 75mm thick local sand stone in place of missing / cracked /decayed stones as per original pattern complete over a layer of 30mm thick lime mortar(1:lime :1surkhi: 1sand) matching with original etc.complete. (Labour work only) |
| 6 | Removal ofout of plumb/ hanging / disturbed / stone beam, brackets/ capital, pillars, kakchasan, asana patta, vedika stone member etc. by appropriate techniques i.e using Derrik pole with chain pullyblock / including stacking them properly over wooden members , numbering etc. very carefully to avoid any misshaping and without causing any damage to the stone members/ beam/ structure etc.complete. (Labour work only) |
| 7 | Supply/ procurement of good quality marble stone blocks in place of missing stones of required size {sanwar/ummar quarry} including dressing and finishing for use at broken/ cracked / missing portion / locations etc. complete. (Labour work only) |
| 8 | Provision for careful mending the cracked / damaged heavy marble stone blocks by appropriate techniques using stainless steel pins / dowels / clamps with epoxy solution mixed with stone dust of same stone including drilling holes, cutting channel, finishing etc. complete. (Labour work only) |
| 9 | Restoration of Beam, kakchasan stone members, Lintel, Slab, Kakchasan, Bracket, Circular Bracket, Asan, Dasa (sanwar/ummar quarry) in place of cracked/missing/decayed stones, medium carved/ molding work of existing old pattern.as per original design / pattern fixing with stainless steel cramps /pins and 30 mm thick lime mortar(1:lime :1surkhi: 1sand) matching with original etc. complete. (Labour work only) |
| 10 | Recess pointing on floor and temple portion with lime surkhi mortar 1:1:1 (1:lime, 1:surkhi, 1 c. sand ) mix with colour pigment to match with original etc complete. (Labour work only) |
| 11 | Provision forcarved and ornamental design on new stone and made geometric pattern according to the original architectural member of pipaji temple such as capital, kakchasan , vedika, assan patta including make hole for fixing copper clamp/dowels etc. complete. (Labour work only) |
| 12 | Provision for searching out from dumped/mixed heavy architectural members and lifting with chain pully and stacking separately heavy architectural stone member of shikra in proper manner for reuse shikra stone members. (Labour work only) |
| 13 | Provision for initial reassembling of sorting and lifting sand stone blocks of shikharaby trial and error method with the help of conjectural drawing & photo documentation and the assess the quantum of missing/mending work of structure and complete for its final restoration work. (Labour work only) |
| 14 | Provision for 1st class brick masonry with clay (from near thadoli village) mortar for support to the different part of shikhar architectural member under the process of preparation of dummy part of shikhar etc. complete. (Labour work only) |