Drinking Water And Sanitation Department has published Survey, Design And Construction Of Danpo Bagdwar Rising Main And Other Works (Pumping) Water Supply Consisting The Construction Ofsupplying, Carting, Laying & Jointing Of Rising Main, Supply Main And All Other Civil Appurtenant Works Etc. Complete In Bloc. Submission Date for this Tender is 06-09-2023. Pipe Laying Tenders in almora Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Sep-2023 | Corrigendum for Date | Date | 06-09-2023 |
2 | 06-Sep-2023 | Corrigendum for Date | Other | 06-09-2023 |
Sl. No. | Item Description |
1 | Providing of all materials,Carting from site store to site of work,Lowering into trenches with true to alignment, Laying of API-5L, Jointing by elctric welding process with proper grade of electrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completionof work with testing of pipe line etc comp. |
2 | From Top CWR to CWR Zone-02 API pipe 100mm Dia 3.2mm Thickness |
3 | Excavation of earth for pipeline in following strata lift upto 1.5m lead upto 30m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto distance of 60m from trnches including supply of labour T&P etc all complete |
4 | Soil mixed with boulder and bajri |
5 | Supply of& Fixing of following sizes of valves including carting the same upto side of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect. |
6 | 100mm dia WP 30 kg/sqcm (Sluice valve) |
7 | 100mm dia WP 30 kg/sqcm (Reflux valve) |
8 | 80 mm dia C.I Air valve(Double Acting) |
9 | Supply of all materials, labour and T & P etc. and construction of Valve Chambers |
10 | Sluce/Reflux Valve /Air Valve chamber( 1.2 × 1.2 × 1.2 m) |
11 | Supply of all materials, labour, T & P etc. and Construction ofR.C.C Anchor Block as per type design complete |
12 | Makig2 M wide Briddle path forrising main including hill side cutting and coolie walling of all materials, labour, T & P etc. |
13 | Painting of API Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) |
14 | Supply of all materials, labour, T & P etc. and Construction of Pump House (6X7X5 meter) etc. complete |
15 | Supply of all materials, labour, T & P etc. and Construction of Staff Quarter Type - 1 etc. complete |
16 | Provision of 1.5 m high Boundary Wall in brick masonry including supply of all materials, labour, T&P etc. complete |
17 | Provision of Barbed Wire Fencing through angle iron posts around the water works site |
18 | Provision of 3.6 m wide M.S. Iron Gate with Pillars of following sizes complete |
19 | Provision of Drainage System consisting of following works |
20 | Supply of all materials, labour and T & P etc. and construction of Manhole chambers |
21 | Supply & laying of drainage 250 mm dia. RCC NP2 pipe |
22 | Supply of all materials and construct 150 mm S.C. drain including supply of all labour T&P etc complete |
23 | Protection Work |
24 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
25 | Cement concrete 1:2:4including supply of all materials, labour, T&P etc. complete |
26 | RR Stone Masonry 1:6 including supply of all materials, labour, T&P etc. complete |
27 | Random Rubble Stone Masonry laid dry including supply of all materials, labour, T&P etc. complete. |
28 | Supply of all materials, labour and T & P etc. and construction of R.C.C. Sump / Clear Water Reservoir of 170 KL Capacityas perdesign and drawing including fixing of pipes and fittings including cartage of materials & Chlorinator etc. |
29 | Stage-V (ZONE-1): Centrifugal Pump Clear Water (600 LPM, 200 M Head) |
30 | Electric Motor |
31 | Base Plate |
32 | Fully Auotomatic Auto Transformer Starter |
33 | 250 Amps Main switch with neutral link |
34 | Control Panel |
35 | Power Wiring & Earthing Material |
36 | Main Piping & Valves |
37 | Gauges |
38 | Chain Pulley Block (3 Ton Capacity) |
39 | Tools |
40 | Grease premium quality (High Temprature) |
41 | Heavy duty crimping tool |
42 | Rubber Resistance Sheet (1×2×0.025 M) |
43 | Transformer oil (1 Drum=209 Ltrs) |
44 | Installation & commissioning of Pumping Plants & related acceessories |
45 | Testing :At Works |
46 | At Site |
47 | Painting |
48 | Carting |
49 | Maintenance (one year) |