Himachal Pradesh State Electricity Board-HPSEB has published Estimate For Temporary Diversion Of Water Of Nogli Khad Into Power House Water Conductor System (Open Channel) W.E.F. 01.09.2023 To 30.11.2023 (91 Days). Submission Date for this Tender is 01-09-2023. Canal Construction Tenders in Shimla Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Temporary diversion of water of Nogli khad into Power House water conductor system (Open Channel) by providing boulders/bushes/tree branches, sand filled gunny bags and maintaining water level in old intake structure by operating control structure gate to avoid water spillage by cleaning trash racks provided at various places in water conductor system such as at bell mouth gate, near desilting chamber. The desilting chamber valves should also be cleaned by operation respective valves including clearance of side drains complete in all respects as per the requirement and direction of EIC given time to time. The attendant (s) should be equipped with mobile phone round the clock for the period w.e.f.01.09.2023 to 30.11.2023 (91 days) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail