Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Ofmaterial, Design, Erection, Testing, Commissioning,For Shifting Of Ht/Lt Lines & Dtrs From The Proposed Extension Site Of Kangra Airport Under Esd, No.I, Hpsebl, Kangra.Ed Kangra (Seop-30/2023-24).. Submission Date for this Tender is 01-09-2023. Electrification Work Tenders in kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | 11 KV HT LINE |
2 | Prov. Steel Tublar Pole 9 Mtrs. Long |
3 | Prov. RCC Muff of 2000 mm length |
4 | Prov. ACSR 7/4.26mm2 (100MM2) |
5 | Prov. G.I.Wire 8 No.SWG |
6 | Prov. A.I. Knee Bracing Set 2X(750X50X50) mm for single Pole |
7 | Prov. A.I.For earth wire (1600x50x50)mm |
8 | Prov. A.I.For earth wire (2500x50x50)mm |
9 | Prov. C.I./ F.G. X-Arm (1500X100X50) mm for single Pole |
10 | Prov. C.I./ F.G. X-Arm (2400X100X50) mm for Double Pole |
11 | Prov. A.I.Bracing Set 2X(4200X50X50) mm for Double Pole |
12 | Prov. 11 kV Pin Insulator with Pin Helically formed fitting |
13 | Prov. Disc insulator set (Cleaves and Tong) Helically formed fitting |
14 | Prov. HT Stay Set complete including Guy Assembly Helicallyfitting |
15 | Prov. Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set) |
16 | Prov. HT Earthing setfor Steel Pole/Pcc Pole |
17 | Prov. Danger Plate(250X200X1.6 mm) |
18 | Prov. M.S. Nuts and Bolts (Off Sizes) |
19 | Prov. Top Clamp for Pole (M.S. Flat 50x6) |
20 | Prov. Barbed Wire |
21 | Prov. Aluminium Paint |
22 | Prov. half Clamp ( M.S. Flat50X6 mm ) |
23 | Prov. Full Clamp ( M.S. Flat50X6 mm ) |
24 | Prov. Eye Hook Bolt |
25 | Erection charges |
26 | Transportation charges |
27 | Dismentlementcharges |
28 | 3PhaseLT LINE |
29 | Prov. S.T. Pole 9mtr long |
30 | Prov.RCC muff |
31 | Prov. LT (AAAC) conductor 7/3.15mm(50mm2) |
32 | Prov. G.I.Wire 8 No.SWG |
33 | Prov.LT Stay Set |
34 | Prov. Stay wire 7/3.15mm |
35 | Prov.Shakle Insulator |
36 | Prov. D-Iron |
37 | X-Arm Clamp |
38 | Prov. C.I.X-arm (600x75x40 ) |
39 | Prov. Egg Insulator |
40 | Prov.Eye Hook Bolt |
41 | Prov. Nut & Bolt off Size |
42 | Prov. Aluminium paint |
43 | Prov.Spriel PVC Spacer |
44 | Prov. GI Reel |
45 | Erection charges |
46 | Transportation charges |
47 | Dismentlementcharges |
48 | 100 KVA S/Stn |
49 | Prov. S/T Pole9Mtr. W/L200 kg |
50 | Prov. RCC Muff of 2000 mm length |
51 | Prov. C.I. X-Arm (2800X125X65 mm) for Transformer base |
52 | Prov. C.I. X-Arm (2800X100X50 mm) for incommer line |
53 | Prov. C.I (460X125X65 mm) for supporting Main Channel of T/F and GO Switch (3Nos.) |
54 | I)A.I (2800X50X50 mm) |
55 | II) A.I (460X35X35 mm) |
56 | Prov. C.I. for Fuse Unit/AB Switch & GO Switch (2800X75X40 mm) 4 Nos. |
57 | Prov. A.I X Arm for Lightning Arrestor & distribution panel box (3x2800X50X50 mm) |
58 | Prov. C.I.(2800x75x40)mm for CT/PT unit (2NO.) |
59 | Prov. C.I.(1500x75x40)mm for CT/PT unit (2NO.) |
60 | Prov. MSAI (50x50x6)mm length 1500mm CT/PT unit (2NO.) |
61 | Prov. G.O.Switch 400 A |
62 | Prov. D.O.Fuse |
63 | Prov. Lightning Arrestors |
64 | Prov. Disc Insulator Fitting |
65 | Prov. Stay Set complete |
66 | Prov. Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set) |
67 | Prov. AAAC 7/3.15mm for eathing |
68 | Prov. Pipe Earthing |
69 | Prov. LT Distribution Panel Box with MCCB(160A,10KA,4P,1No.) &SFU(32A,5 No.rewirable) |
70 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
71 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
72 | Prov. M.S. Nuts and Bolts (Off Sizes) |
73 | Prov. aluminum Thimble |
74 | Prov. aluminum Thimble |
75 | Prov. Lead-Tin Solder (60:40) |
76 | Prov. Solder Flux |
77 | Prov. Danger Plate |
78 | Prov. Barbed Wire |
79 | Prov. LT Cable Aluminum 3.5 core, 120mm2 |
80 | Prov. Shackle insulator for earthing |
81 | Prov. Control cable(12 core). |
82 | Prov. Aluminium Paint. |
83 | Prov.chain link fencing L/S |
84 | Tpt. Charges |
85 | Erection Charges complete in all respect. |
86 | Dismantalment Charges for existing S/Stn |
87 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail