|
| 1 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directe |
| 2 | Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification |
| 3 | Cement concrete of mix 1:1.5.3 (One cement Two sand four aggregates)M 20 Concrete using 20mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification |
| 4 | Supplying and errecting of Centering charges for sides and soffits of concrete work including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |
| 5 | Cement concrete of mix 1:3:6 (One cement Three sand Six aggregates) using 40mm& 20mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification |
| 6 | Plastering With c m 1.5 mix- 12mm Thick including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |
| 7 | Supplying and Fabrication of steel from approved Firmincluding cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |
| 8 | Supplying And Fixing Bitumen Pad For Expansion Joints12mm Thick including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |
| 9 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directe |
| 10 | Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification |
| 11 | Cement concrete of mix 1:1.5.3 (One cement Two sand four aggregates)M 20 Concrete using 20mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification |
| 12 | Supplying and errecting of Centering charges for sides and soffits of concrete work including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |
| 13 | Cement concrete of mix 1:3:6 (One cement Three sand Six aggregates) using 40mm& 20mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification |
| 14 | Plastering With c m 1.5 mix- 12mm Thick including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |
| 15 | Supplying and Fabrication of steel from approved Firmincluding cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |
| 16 | Supplying And Fixing Bitumen Pad For Expansion Joints12mm Thick including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications |