Tender For Updation Of Pfr Of Devipora Shep.--- 1 Geodetic Survey Of An Area On Different Scales And Preparation Of Topographical Maps In Requisite Scales To Supply Them In Both Soft And Hard Formats With Four Copies Complete, Including Cost Of Manpower, Labour, Surveying Instruments, Camp Equipage, Transportation, Etc, As Per Directions Of Engineer-In-Charge. On Scale Of 1:5, 000 With 2–3 M Contour Intervals: In Moderate To Thick Forest Cover In Flat Hilly / Mountainous Terrain. 2 Cadastral Survey ( Boundary Survey ) Complete Including Cost Of Manpower, Labour, Surveying Instruments, Camp Equipage, Transportation, Etc, As Per Directions Of Engineer-In-Charge 3 Establishment Of Bench Mark Of Standard Specifi Cations Including Its Painting, Engraving Etc Complete Including Cost Of Manpower, Material, Labour, Etc, As Per Directions Of Engineer-In-Charge Including Boundary Blocks 4 Double Levelling Survey For Control Points In Semi Hilly Terrain 5 River Cross Section Survey And Preparation Of Maps In Requisite Scales To Supply Them In Both Soft And Hard Formats With Four Copies Complete, Including Cost Of Manpower, Labour, Surveying Instruments, Camp Equipage, Transportation, Etc, As Per Directions Of Engineer-In-Charge. By Wading In Very Shallow Reaches River Span Up To 100 M 6 Longitudinal River Survey And Preparation Of Maps In Requisite Scales To Supply Them In Both Soft And Hard Formats With Four Copies Complete, Including Cost Of Manpower, Labour, Surveying Instruments, Camp Equipage, Transportation, Etc, As Per Directions Of Engineer-In-Charge.By Wading In Very Shallow Or By Boat In Moderate Depth Reaches Up To 10 Km 7 Providing Retro-Reflective Regulatory Sign Board Of Size 900Mm Diameter Made Out Of 2Mm Thick Aluminum Sheet, Face To Be Fully Covered With High Intensity Encapsulated Lens Type Retro-Reflective Sheeting As Approved By Engineer-In-Charge. Letter, Symbols, Borders, Etc. Will Be As Per Irc:67 With Required Colour Scheme On The Boards And With The High Intensity Grade A. The Aluminum Sheet To Be Riveted To M.S. Frame Of Angle Iron Of Size 40X40x4mm. The Boards Will Be Fixed To 1 No. 50X50mm Square Post Made Of M.S. Angle 50X50x4mm, 4M Long Welded To The Frame With Adequate Anti-Theft Arrangement. Sheet Work To Be Painted With Two Or More Coats Of Synthetic Enamel Paint Over An Under Coat ( Primer ) And Back Side Of Aluminum Sheet To Be Painted With Two Or More Coats Of Epoxy Paint Including Appropriate Priming Coat Complete In All Respects As Perdirections Of Engineer-In-Charge. 8 Hire Charges Of Motor Car With Driver Including Maintenance And Repairing Of Vehicle Including Pol Non-Ac Motor Car ( Sumo / Bolero Or Equivalent ) 9 Providing Ofroom Accomodation For The Survey Personnel During Night Haltduring Ongoing Survey Works 10 Clearing Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Saplings Of Girth Upto 30 Cm Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Upto A Distance Of 50 M Outside The Periphery Of The Area Cleared. 11 Updation Of Exisiting Pfr By Way Of Preperation / Drafting Of Project Feasibility Reportusing The Data Aquired From The Survey Works And The Discharge Data ( To Be Provided By Jkpdc ) Including Power Potential Studies As Per Relevent Guidelines / Standards / Manuals Issued By Mnre / Cea / Ahec ( Whichever Applicable ) 12 Composing / Making Of All Drawings For Preparation Of Pre – Feasibility Report ( Autocad Charges ) : 13 Contour Plan. 14 Site Plan. 15 L-Sections 16 X-Sections Of Water Conductor / Power Canal. 17 Composing Of Photographs Including Front Page. 18 Index Map 19 Aerial Map 20 Editing Charges Of All Drawings 21 Printing Charges Of All Drawings & Computer Typing Including Printouts Of Pages For Preparation Of Pre – Feasibility Report: 22 A3 Printouts ( Site Plan, Contour Plan, & Geological Map ) 23 A0 Printouts ( L-Section ) 24 A4 Printouts ( X-Sections Of Nallah, Weir / Barrage Gate, Water Conductor & Index 25 A3 Solid Printouts ( Aerial View Map ) . 26 Computer Typing Charges Including Printouts. 27 Laser Printing / Photostat Charges 28 Spiral Binding Of Pfr Copies