Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 0 days TDR #39323216

Tender For Strengthening Of Existing Infrastructure Of Mtl In Digboi Refinery Township

Issued by Boards / Undertakings / PSU · digboi, Assam
Tender Value
84.64 Lakhs
Estimated cost
Bid Submission
08 Sep 2023
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
digboi → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Strengthening Of Existing Infrastructure Of Mtl In Digboi Refinery Township

BOQ

Name of Work: Strengthening of existing infrastructure of MTL in Digboi Refinery Township.
Sl. No. Item Description
1MTL backside
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed :All kinds of soil.
3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil.
4Extra rates for quantities of works executed: (Note: The extra percentage rate is applicable per metre depth in respect of each item but limited to quantities of work executed in these difficult conditions. The depth which isto be considered for payment, shall be the depth measured from the sub soil water level upto the centre of gravity of the qty executed in difficult condition. The depth shall be reckoned correct to 0.10 m; 0.05m or more shall be taken as 0.10m and less than 0.05m ignored).
5In or under water and/ or liquid mud, including pumping out water as required. Note :Unit \"Metre\"shall be read as \"Metre Depth\" and the Rate indicated is Rs. 20.00 which should be read as 20% per metre depth. Since %age (percentage) is not compatible in SAP, Please convert this item as NON-SAP item while preparation of PR.
6Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. Note: Unit KL stands for \"Kilo Litres\".
7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
8Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
9Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered):
10Depth not exceeding 1.5 m.
11Depth exceeding 1.5 m but not exceeding 3 m.
12Depth exceeding 3 m but not exceeding 4.5 m.
13Brick work withcommon burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
14Cement mortar 1:4 (1 cement : 4 coarse sand).
15Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
16Cement mortar 1:4 (1 cement : 4 coarse sand).
17Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in:
18Cement mortar 1:4 (1 cement : 4 coarse sand).
19Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level:
20Cement mortar 1:3 (1 cement :3 coarse sand).
21Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level :
221:3:6 (1 Cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources).
231:4:8 (1 Cement : 4 coarse sand (Zone-III) dervied from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
24Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level:
25Thermo-Mechanically Treated bars.
26Centering and shuttering including strutting, propping etc. and removal of form for :
27Foundations, footings, bases of columns, etc. for mass concrete.
28Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
29Lintels, beams, plinth beams, girders, bressumers and cantilevers.
30Columns, Pillars, Piers, Abutments, Posts and Struts.
31Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge:
32Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
33Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
34Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
35In cement mortar.
36Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead up to 50 metres.
37Supplying and stacking at site:
3890 mm to 45 mm size stone aggregate.
3963 mm to 45 mm size stone aggregate.
4053 mm to 22.4 mm size stone aggregate.
41Moorum.
42Good earth.
43Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
44Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead up to 50 metres - With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
45Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
46Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
47Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
48Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m: All kinds of soil.
49Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material:
50Beyond 30 cm girth up to and including 60 cm girth.
51Beyond 60 cm girth up to and including 120 cm girth.
52Beyond 120 cm girth up to and including 240 cm girth.
53Above 240 cm girth.
5412 mm cement plaster of mix :
551:4 (1 cement: 4 fine sand).
5615 mm cement plaster on the rough side of single or half brick wall of mix :
571:4 (1 cement: 4 fine sand).
58Neat cement punning.
59Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
60Rough cast plaster up to 10m height above ground level with a mixture of sand and gravel or crushed stone from 6mm to 10mm nominal size, dashed over and including the fresh plaster in two layers, under layer 12mm cement plaster 1:4 (1 cement: 4 coarse sand) and top layer 10mm cement plaster 1:3 (1 cement: 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement - Ordinary cement finish using ordinary cement.
61Pebble dash plaster up to 10m height above ground level with a mixture of washed pebble or crushed stone 6mm to 12.5mm nominal size, dashed over and including fresh plaster in two layers under layer 12mm cement plaster 1:4 (1 cement: 4 coarse sand) and top layer 10mm cement plaster with cement mortar 1:3 (1 cement: 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.
62Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
631:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
64Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :
651:2:4 (1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).
661:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
67Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :
681:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
69Extra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. Note :- The quantity will be calculated by multiplying the depth measured from the sub-soil water level up to centre of gravity of concrete under sub- water level with quantity of concrete in cum executed under sub-soil water. The depth of centre of gravity shall be reckoned correct to 0.1m; 0.05m or more shall be taken as 0.1m and less than 0.05m ignored. The Unit \"Cum\" shall be read as \"Cum per metre depth\".
70Providing and fixing sheet covering over expansion joints with iron screws as per design to match the colour / shade of wall treatment:
71Non-asbestos fibre cement board 6 mm thick as per IS: 1486 - 150mm wide.
72Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. Pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc complete:
73600 mm dia. R.C.C. pipe.
74900 mm dia. R.C.C. pipe.
751200 mm dia RCC pipes (Laying by manual/ mechanical means).
761800 mm dia RCC pipes (Laying by manual/ mechanical means).
77Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
78Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
79Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete:
80Hot finished welded type tubes.
81Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required:
82In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
83Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc. including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc).
84Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site.
85Dry stone pitching 22.5cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20cm including preparing the bedding surface etc. all complete.(Payment for Stone to be made separately).
86Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand).
87Random rubble masonry with hard stone in superstructure above plinth level and up to floor five level, including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at window sills, ceiling level and the like: Cement mortar 1:6 (1 cement : 6 coarse sand).
88Extra for laying stone work in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. Note:- The quantity will be calculated by multiplying the depth measured from sub - soil water level up to the centre to gravity of stone work under sub - water with the quantity of stone work in cum executed under the sub - soil water. The depth of centre of gravity shall be reckoned correct to 0.1m. 0.05m or more shall be taken as 0.1 m and less than 0.05m ignored. The Unit \"M3\" shall be read as \"Cum per metre depth\".
89Providing and laying tactile tile (for vision impaired persons as per standards) of size 300x300x9.8mm having with water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as per direction of Engineer-in-Charge.
90Providing and laying matt finished vitrified tile of size 100x100 x16mm having water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in out door floors such as footpath, court yard multi models etc., laid on 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as direction of Engineer-in-Charge.
91Providing and laying matt finished vitrified tile of size 300x300x 9.8mm having water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in out door floors such as footpath, court yard multi models etc., laid on 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as direction of Engineer-in-Charge.
92Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc. of required strength, thickness & size/shape,made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand,compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineerin-Charge:
9360mm thick Cement Concrete paver block of M-35 grade with approved colour, design & pattern.
94Providing and laying 75mm thick compacted bed of dry brick aggregate of 40mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand including finishing smooth etc. complete as per direction of Engineer-in-charge.
95Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
96Providing and fixing 10x10x7.50 cm Granite stone block hand cut and chisel dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1cement:4 coarse sand) with joints 10mm wide filled with same mortar including ruled pointing etc.complete as per direction of Engineer-in charge.
97Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar including filling the joints with same mortarwith common burnt clay F.P.S. (non modular) bricks:
981:4 (1 cement : 4 coarse sand).
99Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete:
100Size of Tile 600x600 mm.
101Size of Tile 800x800 mm.
102Size of Tile 1000x1000 mm.
103Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer) with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make in all colours & shade in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), including grouting the joint with white cement & matching pigments etc. complete:
104Size of Tile 600x600 mm.
105Size of Tile 800x800 mm.
106Size of Tile 1000x1000 mm.
107Stone tile work for wall lining up to 10 m height with special adhesive over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement with an admixture of pigment to match the stone shade. 8mm thick (mirror polished and machine cut edge) (Cement shall be free issue material):
108Granite stone of any colour and shade.
109Stone tile (polished) work for wall lining over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and cement slurry @ 3.3 kg/sqm including pointing in white cement complete. 8mm thick:
110Granite of any colour and shade.
111Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge: Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent.
112Providing and laying polished granite stone flooring in required design and patterns, in linear as well as culvilinear portions of the building all complete as per the architectural drawings with 18mm thick stone slab over 20mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-charge: Polished Granite stone slab jet black, cherry red, elite brown, cat eye or equivalent
113Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooringcut granite stone of required size and shape of approved shade,colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge - Area less than 0.50 sqm.
114Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm + 0.05 %, total coated thickness with zinc coating 120 gsm as per IS: 277 in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation and should be supplied in single length up to 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55mm) with EPDM seal, complete up to any pitch in horizontal/ vertical or curved surfaces excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
115Applying priming coat with ready mixed primer of approved brand and manufacturer at all heights over steel surfaces like structures, columns, pipes,vessels, tanks etc. as per manufacturers specifications and directions of the Engineering-in- Charge; all complete including cleaning the surface using emery papers/ Power tool cleaning such as ST-2 or ST-3 as per requirement, including all material, consumables, tools, tackles, labour etc but excludingScaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve rquired DFT byapplying more coats (if required) within the relevantSOR item rates.
116HB Zinc phosphate coating primerto achive a minimum DFT of 30-35 microns (1 or more coat of 30-35 micron )
117Supplying and applying various epoxy and other protective intermediate / finish paints of approved brand andmanufacturer at all heights over prepared/primed surface for steel structures, pipelines, tanks, vessels, equipments, concrete floors etc. as per manufacturers specification and directions of Engineer-in-charge all complete including all materials, labours, tools-tackles and consumables etcbut excluding Scaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve required DFTby applying more coats (if required) within the relevant SOR item rates.
118Two pack Acrylic Poly-urethane (PU) to achive aminimum DFT of 40-50microns (one or more coat of40-50 micron).
119Finishing walls with water proofing cement paint of required shade-New work (Two or more coats applied @ 3.84 kg/10 sqm).
120Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete:
121On steel work.
122On concrete work.
123Finishing walls with Acrylic Smooth exterior paint of required shade:
124Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface).
125Old work (One or more coat applied @ 0.90 ltr/10 sqm).
126Finishing walls with textured exterior paint of required shade -New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm.
127Finishing walls with Acrylic Smooth exterior paint of required shade-New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm).
128Finishing walls with water proofing cement paint of required shade :
129Old work (one or more coats applied @ 2.20 kg/10 sqm)over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat.
130Old work (one or more coats @ 2.20 kg/10 sqm) complete.
131Transportation of various materials by Truck (of capacity 9-10 Tonne) for following leads or part thereof including loading, unloading such as cement, sand, debris, metal, earth, refractory, insulation, furniture, plants etc. all such materials from one place to another place including battery area and outside battery area all complete as per the direction of the Engineer-in-Charge: Note: Unit of measurement is EACH, which stands for \"Per Trip\".
132Upto a lead of 1 km.
133Carriage of earth by mechanical transport for following leads or part thereof including loading, unloading and stacking all complete as per the direction of the Engineer-in-Charge (The rates will be applicable to net quantities after deduction of 20 percent for voids):
134Upto a lead of 1 km.
135Lead beyond 1 km but upto 2 km.
1361.5% water & Electricity charges deducti
137PF and EDLI Charges-PF and EDLI charges

AI Tender Summary

OUR REF NO 39323216
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 84.64 Lakhs
LAST DATE 08-09-2023
Authority
Authority Name Indian Oil Corporation Limited
Work Description Strengthening Of Existing Infrastructure Of Mtl In Digboi Refinery Township
Basic Detail
Tender No DRE023L082
Bidding Type Tender
Location
City digboi
State Assam
Key Dates
Publish Date 25 Aug 2023
Submission Date 08 Sep 2023
Open Date 11 Sep 2023
Finance
Tender Value 84.64 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
MTL_Site_Photos.pdf
bbf05d05-ad92-4729-bdd5-6f9d49d0c206.html
Annexures_Section2_DRE023.pdf
Bidders_help_Document_for.pdf
BOQ_180434.xls
FAQs-IOCL-Online-EMD.pdf
GCC_APRIL_2017.pdf
SCC-Commercial-DR-E-tende.pdf
SD_Safety_PPLC_Otherdocs_.pdf
Special_Instructions_to_t.pdf
Tender-Acceptance-Format.pdf
Tendernotice_1.pdf
Tender_Document_Section1_.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 25, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 08, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 11, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

MTL_Site_Photos.pdf

html

bbf05d05-ad92-4729-bdd5-6f9d49d0c206.html

pdf

Annexures_Section2_DRE023.pdf

pdf

Bidders_help_Document_for.pdf

xls

BOQ_180434.xls

pdf

FAQs-IOCL-Online-EMD.pdf

pdf

GCC_APRIL_2017.pdf

pdf

SCC-Commercial-DR-E-tende.pdf

pdf

SD_Safety_PPLC_Otherdocs_.pdf

pdf

Special_Instructions_to_t.pdf

pdf

Tender-Acceptance-Format.pdf

pdf

Tendernotice_1.pdf

pdf

Tender_Document_Section1_.pdf