| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-08-2023 | Corrigendum | Technical Bid | 05-09-2023 |
| 2 | 29-08-2023 | Corrigendum | Date | 05-09-2023 |
| Sl. No. | Item Description |
| 1 | Main Entrance Gate |
| 2 | Excavation Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the 2.8.1 All kinds of soil. PWD LUCKNOW SOR-2020-21,I/P-7.2.8.1/10 |
| 3 | PCC for BaseProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) PWD LUCKNOW SOR-2020-21,I/P-8.4.1.3/12 |
| 4 | FRP GateProviding and Installing FRP Elevation: Items : 4pc Pillar, 1pc Molding, 1pc Name Plate, 2pc Elephant, 2pc Tiger Design Front and Back Side will be Same as per our descision As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As Per Quotation |
| 5 | Forest Rest House Entry Gate |
| 6 | ExcavationEarth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the 2.8.1 All kinds of soil. PWD LUCKNOW SOR-2020-21,I/P-7.2.8.1/10 |
| 7 | PCC for BaseProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) PWD LUCKNOW SOR-2020-21,I/P-8.4.1.3/12 |
| 8 | Brick SolingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per Technical Specification Clause 412 PWD LUCKNOW SOR-2020-21,I/P-25.20.MORD-412 (4.18) /49 |
| 9 | Entry Gate Wooden WorkProviding and Installing Main gate Top covering area including complete wood work with polishing and imborcing name as per drawing and design including all tools and tackles and specification & as directed by engineer incharge. As per Quotation |
| 10 | MS GateProviding and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. 10.5.1 Using M.S. angels 40x40x6 mm for diagonal braces. CPWD SOR-2021 Vol-I ,I/P-10.5/224 |
| 11 | Vehicle Parking |
| 12 | Site CleaningClearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. PWD LUCKNOW SOR-2020-21,I/P-MORD 201(2.1)/47 |
| 13 | Compaction of GroundExtra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). CPWD SOR-2021 Vol-II ,I/P- 16.2/325 |
| 14 | Watchmen Cabin |
| 15 | ExcavationEarth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the 2.8.1 All kinds of soil. PWD LUCKNOW SOR-2020-21,I/P-7.2.8.1/10 |
| 16 | FillingSupplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. CPWD SOR-2021 Vol-I ,I/P- 2.27/95 |
| 17 | PCC for BaseProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) PWD LUCKNOW SOR-2020-21,I/P-8.4.1.3/12 |
| 18 | Brick SolingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per Technical Specification Clause 412. PWD LUCKNOW SOR-2020-21,I/P-25.20.MORD-412(4.18)/49 |
| 19 | Plinth ProtectionMaking plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. CPWD SOR-2021 Vol-I ,I/P- 4.17/112 |
| 20 | Brick work with Mud MortorBrick work with common burnt clay bricks of class designation 7.5 in mud mortar. CPWD SOR-2021 VolI-I ,I/P- 14.25/300 |
| 21 | Plastering with mud mortorMud mortar made with local clay good earth. CPWD SOR-2021 VolI-I ,I/P- 14.24/300 |
| 22 | Flooring for StepsProviding and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser of steps laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).11.47.2 Size of Tile 600x600 mm. PWD LUCKNOW SOR-2020-21,I/P-9.6.1.1/16 |
| 23 | LintelProviding Wood work for Lintel (b ) Sal wood (Cut to Size). UP PWD SOR-2020-21,I/P-28(b)/14 |
| 24 | Door and Window FrameProviding wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Second class teak wood. PWD LUCKNOW SOR-2020-21 ,I/P-9.1.1/19 |
| 25 | Door and Window ShutterProviding and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note- Butt hinges and necessary screws shall be paid separately) 9.5.1 Second class teak wood. PWD LUCKNOW SOR-2020-21 ,I/P-9.5.1/19 |
| 26 | Butt HingesProviding and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. complete: 9.55.1 125x65x2.12 mm. CPWD SOR-2021 Vol-II ,I/P-9.55.1/19 |
| 27 | Door BoltsProviding and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete 9.62.1 300x16 mm. CPWD SOR-2021 Vol-II ,I/P-9.62.1/19 |
| 28 | Tower BoltProviding and fixing ISI marked oxidised M.S. tower boit black finish. (Barrel type) with necessary screws etc complete 9.63 300x10 mm 9.63.1 250x10 mm. CPWD SOR-2021 Vol-II ,I/P-9.63.1/19 |
| 29 | Door HandleProviding and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete_ENTI 9.66.1 125 mm. CPWD SOR-2021 Vol-II ,I/P-9.66.1/19 |
| 30 | Thatch Roofing with Bamboo Support for Security Cabin Providing and Installing Thatch Roofing with Bamboo Support at Site of size 4 M X 4 M. As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As Per Quotation |
| 31 | Tent Area |
| 32 | ExcavationEarth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the 2.8.1 All kinds of soil. PWD LUCKNOW SOR-2020-21,I/P-7.2.8.1/10 |
| 33 | PCC for BaseProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) PWD LUCKNOW SOR-2020-21,I/P-8.4.1.3/12 |
| 34 | Brick SolingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per Technical Specification Clause 412. PWD LUCKNOW SOR-2020-21,I/P-25.20.MORD-412 (4.18)/49 |
| 35 | FillingSupplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. CPWD SOR-2021 Vol-I ,I/P- 2.27/95 |
| 36 | Uncoursed Rubble MasonryRandom rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) CPWD SOR-2021 Vol-I ,I/P- 7.1.1/149 |
| 37 | Steps Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in Cement mortar 1:4 (1 cement: 4 coarse sand) PWD LUCKNOW SOR-2020-21,I/P-9.6.1.1/16 |
| 38 | Flooring - Wooden38 mm thick wood block flooring of first class teak wood laid over 25 mm thick leveling layer of cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 10 mm nominal size) to be paid separately, coated with a thin layer of hot bitumen penetration 80/25 (blown type) @ 2.45 kg per sqm, including fixing blocks in position after dipping in hot bitumen (blown type) up to half depth, planed, levelled smooth and finished complete. CPWD SOR-2021 Vol-I ,I/P- 11.34/240 |
| 39 | Bathroom WallsBrick work with common burnt clay (non modular) bricks of class-150 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement 4 coarse sand) PWD LUCKNOW SOR-2020-21,I/P-9.6.4.1/49 |
| 40 | Bathroom FlooringProviding and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete. CPWD SOR-2021 Vol-I ,I/P- 11.37/240 |
| 41 | Bathroom DadoBrick work with common burnt clay (non modular) bricks of class-150 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement 4 coarse sand) CPWD SOR-2021 Vol-I,I/P-11.37A/241 |
| 42 | Ceiling FanSupply, Installation, Testing and Commissioning of 1200 mm sweep, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. blades, 30 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper winding, Power Factor not less than 0.9, Service Value (CM/M/W) minimum 6.00, Air delivery minimum 210 Cum/Min , 350 RPM (tolerance as per IS : 374-2019), THD less than 10%, remote or electronic regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC Supply, earthing etc. complete as required. CPWD DSR 2022 E&M (I/P - 19.1/72) |
| 43 | Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed steel conduit, with piano type switch, phenolic laminated sheet, suitable size MS box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required.1.1.3 Group C. CPWD DSR 2022 E&M (I/P - 1.1.3/1) |
| 44 | Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit alongwith 1 No. 4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. CPWD DSR 2022 E&M (I/P - 1.12/3) |
| 45 | Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc. as required.1.27.5 8 Module (125mm x 125mm) CPWD DSR 2022 E&M (I/P - 1.27.5/6) |
| 46 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required. 14.15.2 90 mm dia (OD-90 mm & ID-76 mm nominal) CPWD DSR 2022 E&M (I/P - 14.15.2/43) |
| 47 | Installation, testing and commissioning of pre-wired, fluorescent fitting / compact fluorescent fitting of all types, complete with all accessories and tube/lamp etc. directly on ceiling/ wall, including connections with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable and earthing etc. as required. CPWD DSR 2022 E&M (I/P - 1.41/7) Sanitary Installations. |
| 48 | W.C. Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :17.3.1 W.C. pan with ISI marked white solid plastic seat and lid CPWD SOR-2021 Vol-II ,I/P- 17.3.1/356 |
| 49 | Wash BasinProviding and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required:- (a) White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer. CPWD SOR-2021 Vol-II ,I/P- 17.7A/358 |
| 50 | Bottle TrapProviding and fixing CP Brass 32mm size Bottle Trap of approved quality & make and as per the direction of Engineer-in-charge. CPWD SOR-2021 Vol-II ,I/P- 17.22A/360 |
| 51 | Towel RingProviding and fixing PTMT towel ring trapezoidal shape 215 mm long,200 mm wide with minimum distances of 37 mm from wall face with concealed fittings arrangement of approved quality and colour, weighing not less than 88 gms. CPWD SOR-2021 Vol-II ,I/P- 17.72/369 |
| 52 | Bib CockProviding and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 gms. 18.50.1 15 mm nominal bore. CPWD SOR-2021 Vol-II ,I/P- 18.50.1/409 |
| 53 | Stop CockProviding and fixing PTMT angle stop cock 15 mm nominal bore, weighing not less than 85 gms. CPWD SOR-2021 Vol-II ,I/P- 18.63/411 |
| 54 | Water TapProviding and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:17.7.11 Stainless Steel AISI-304(18/8) Wash basin 530x345 mm with single 15 mm C.P. brass pillar tap. CPWD SOR-2021 Vol-II ,I/P- 17.7.11/358 |
| 55 | TENTProviding and Installing of tents OUTER LAYER IS IN PVC 720 GSM IN WATERPROOF, PROOF, UV PROTECTIVE AND ANTIFUNGAL.TOP MIDDLE LAYER IS BLACKOUT.TOP INNER LAYER IS COTTON PRINTED WHICH COTTON IS LINING IN 220 GSM.SIDEWALL OUTER PORTION IS IN CANVAS 450 GSM WHICH IS WATERREPPLENT.MIDDLE LAYER FOR SIDEWALL IS BLACKOUT TO AVOID THE SHADOW (FOR PRIVACY) THIS IS ALSO WATER REPPLENT.INNER LAYER IS IN COTTON PRINTED WHICH IS 220 GSM LINING COTTON.STRUCTURE IS IN M.S WHICH IS FOLDABLE AND PLATE SYSTEM AT THE BOTTOM OF POLES TO FASTEN.WINDOWS WITH WATERPROOF COVER AT OUTDIDE, COTTON CURTAINS AT INSIDE AND MOSQUITO NET IN THE MIDDLE.EXTRA MS PIPES AT THE BOTH THE SIDES WITH COLOUR. DOORS WITH ZIP TO OPEN OR CLOSE FROM BOTH SIDE.ETC. FLAP AT THE BOTTOMQuotation item |
| 56 | Reception Center Work |
| 57 | ExcavationEarth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the 2.8.1 All kinds of soil. PWD LUCKNOW SOR-2020-21,I/P-7.2.8.1/10 |
| 58 | PCC for BaseProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) PWD LUCKNOW SOR-2020-21,I/P-8.4.1.3/12 |
| 59 | Brick SolingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per Technical Specification Clause 412. PWD LUCKNOW SOR-2020-21,I/P-25.20.MORD-412 (4.18)/49 |
| 60 | FillingSupplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. CPWD SOR-2021 Vol-I ,I/P- 2.27/95 |
| 61 | Random Rubble MasonryRandom rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) CPWD SOR-2021 Vol-I ,I/P- 7.1.1/149 |
| 62 | PointingPointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : 13.33.1 Flush/ Ruled pointing. CPWD SOR-2021 Vol-II ,I/P-13.33.1/281 |
| 63 | Brick work with Mud MortorBrick work with common burnt clay bricks of class designation 7.5 in mud mortar. CPWD SOR-2021 VolI-I ,I/P- 14.25/300 |
| 64 | Plastering with mud mortorMud mortar made with local clay good earth.CPWD SOR-2021 VolI-I ,I/P- 14.24/300 |
| 65 | Kota Stone FlooringKota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the stab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement: 4 coarse sand) PWD LUCKNOW SOR-2020-21,I/P-11.26.1/26 |
| 66 | Bathroom FlooringProviding and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete. PWD LUCKNOW SOR-2020-21 ,I/P- 11.37/26 |
| 67 | Bathroom DadoProviding and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shadecomplete. UP PWD SSR 2020 ,I/P-11.37A/26 |
| 68 | Waterproofing Treatment to WC and BathProviding and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured. CPWD SOR-2021 Vol-I ,I/P- 22.6/470 |
| 69 | Door and Window FrameProviding wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Second class teak wood.PWD LUCKNOW SOR-2020-21 ,I/P-9.1.1/19 |
| 70 | Door and Window ShutterProviding and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note- Butt hinges and necessary screws shall be paid separately) 9.5.1 Second class teak wood.PWD LUCKNOW SOR-2020-21 ,I/P-9.5.1/19 |
| 71 | Flush DoorProviding and fixing ISI marked flush door shutters conforming to IS 2202 (Part 1) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 9.21.1 35 mm thick including ISI marked Stainless Steel butt hinges with necessary. PWD LUCKNOW SOR-2020-21 ,I/P-9.21.1/19 |
| 72 | UPVC Door FrameProviding and Fixing factory made uPVC door frame, made of uPVC exturded sections, of size 65 mm x 55 mm with wall thickness 2.0 mm (± 0.2 mm), corners of the door frame to be mitred cut and jointed with plastic brackets and stainless steel screws, reinforcing hinge side vertical of the frames with PVC profile of Size 28 mm x 30 mm having wall thickness 2 mm (±0.2 mm), including providing & fixing 3 nos of 125 mm long stainless steel hinges to the frame, fixing the frame with jamb with required number & size of anchor dash fastners, all complete as per manufacturer\"s specification and direction of Engineer-in-charge. CPWD SOR-2021 Vol-I ,I/P-9.143/207 |
| 73 | UPVC DoorProviding and fixing factory made uPVC white colour casement/casement cum fixed glazed windows comprising of uPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware\"s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge (Single / double glass panes and silicon sealant shall be paid separately) Note For uPVC frame, sash and mullion extruded profiles minus 5% tolerancein shall be made dimension ie in depth & width of profile shall be acceptable Vanation in profile dimension in higher side shall be accepted but no extra payment on this account 9.147 C.2 Casement door with top hung ventilator with 3D and S.S. friction hinges (400 * 19 * 1.9mm) made of (big series) frame 67 * 64 mm, sash 67 x 110 mm & mullion 67 * 80 mm all having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door upto 2.50 sqm) (Openable Door with Top Fix) PWD LUCKNOW SOR-2020-21,I/P-9.147 C1/20 |
| 74 | UPVC VentilatorProviding and fixing factory made uPVC white colour casement/casement cum fixed glazed windows comprising of uPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware\"s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge (Single / double glass panes and silicon sealant shall be paid separately) Note For uPVC frame, sash and mullion extruded profiles minus 5% tolerancein shall be made dimension ie in depth & width of profile shall be acceptable Vanation in profile dimension in higher side shall be accepted but no extra payment on this account Fixed window / ventilator made of (small series) frame 47 x 50 mm & mullion 47 x 68 mm both having wall thickness of 1.9±0.2 mm and single glazing bead of appropriate dimension. (Area upto 0.75 sqm.) PWD LUCKNOW SOR-2020-21,I/P-9.147 B.1/20 |
| 75 | LintelProviding Wood work for Lintel (a ) UP Teak Wood (Cut to Size) UP PWD SOR-2020-21,I/P-28(b)/14 |
| 76 | Butt HingesProviding and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. complete: 9.55.1 125x65x2.12 mm CPWD SOR-2021 Vol-II ,I/P-9.55.1/19 |
| 77 | Door BoltsProviding and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete 9.62.1 (300x16 mm) CPWD SOR-2021 Vol-II ,I/P-9.62.1/19 |
| 78 | Tower BoltProviding and fixing ISI marked oxidised M.S. tower boit black finish. (Barrel type) with necessary screws etc complete 9.63 300x10 mm 9.63.1 250x10 mm CPWD SOR-2021 Vol-II ,I/P-9.63.1/19 |
| 79 | Door HandleProviding and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete_ENTI 9.66.1 125 mm CPWD SOR-2021 Vol-II ,I/P-9.66.1/19 |
| 80 | Electrical WorkCeiling FanSupply, Installation, Testing and Commissioning of 1200 mm sweep, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. blades, 30 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper winding, Power Factor not less than 0.9, Service Value (CM/M/W) minimum 6.00, Air delivery minimum 210 Cum/Min , 350 RPM (tolerance as per IS : 374-2019), THD less than 10%, remote or electronic regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC Supply, earthing etc. complete as required. CPWD DSR 2022 E&M (I/P - 19.1/72) |
| 81 | Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed steel conduit, with piano type switch, phenolic laminated sheet, suitable size MS box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required.1.1.3 Group C. CPWD DSR 2022 E&M (I/P - 1.1.3/1) |
| 82 | Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit alongwith 1 No. 4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. CPWD DSR 2022 E&M (I/P - 1.27.5/6) |
| 83 | Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc. as required.1.27.5 8 Module (125mm x 125mm) CPWD DSR 2022 E&M (I/P - 1.27.5/6) |
| 84 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required.14.15.2 90 mm dia (OD-90 mm & ID-76 mm nominal) CPWD DSR 2022 E&M (I/P - 14.15.2/43) |
| 85 | Installation, testing and commissioning of pre-wired, fluorescent fitting / compact fluorescent fitting of all types, complete with all accessories and tube/lamp etc. directly on ceiling/ wall, including connections with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable and earthing etc. as required. CPWD DSR 2022 E&M (I/P - 1.41/7) |
| 86 | Sanitary InstallationsW.C.Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :17.3.1 W.C. pan with ISI marked white solid plastic seat and lid CPWD SOR-2021 Vol-II ,I/P- 17.3.1/356 |
| 87 | Wash BasinProviding and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required:- (a) White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer. CPWD SOR-2021 Vol-II ,I/P- 17.7A/358 |
| 88 | Bottle TrapProviding and fixing CP Brass 32mm size Bottle Trap of approved quality & make and as per the direction of Engineer-in-charge.CPWD SOR-2021 Vol-II ,I/P- 17.22A/360 |
| 89 | Towel RingProviding and fixing PTMT towel ring trapezoidal shape 215 mm long,200 mm wide with minimum distances of 37 mm from wall face with concealed fittings arrangement of approved quality and colour,weighing not less than 88 gms. CPWD SOR-2021 Vol-II ,I/P- 17.72/369 |
| 90 | Soap Dish HolderProviding and fixing PTMT soap Dish Holder having length of 138mm,breadth 102mm, height of 75mm with concealed fitting arrangements,weighing not less than 106 gms. CPWD SOR-2021 Vol-II ,I/P- 18.65/412 |
| 91 | Bib CockProviding and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 gms. 18.50.1 15 mm nominal bore. CPWD SOR-2021 Vol-II ,I/P- 18.50.1/409 |
| 92 | Stop CockProviding and fixing PTMT angle stop cock 15 mm nominal bore, weighing not less than 85 gms. CPWD SOR-2021 Vol-II ,I/P- 18.63/411 |
| 93 | CPVC PipeProviding and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 18.8.2 20 mm nominal dia Pipes. CPWD SOR-2021 Vol-II ,I/P- 18.8.2/400 |
| 94 | Water TapProviding and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:17.7.11 Stainless Steel AISI-304(18/8) Wash basin 530x345 mm with single 15 mm C.P. brass pillar tap. CPWD SOR-2021 Vol-II ,I/P- 17.7.11/358 |
| 95 | Soak PitConstructing soak pit 1.20x1.20x1.20 m filled with brickbats including S.W. drain pipe 100 mm diameter and 1.20 m long complete as per standard design. CPWD SOR-2021 Vol-II ,I/P- 19.33/445 |
| 96 | Brick ChamberConstructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design:Inside dimensions 500x700 mm and 45 cm deep for pipe line with one or two inlets : 19.30.2.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 CPWD SOR-2021 Vol-II ,I/P- 19.30.2.1/445 |
| 97 | RCC Septic Hume PipeSupply of 1200 RCC Septic hume pipe as per the specification. As Per Quotation |
| 98 | RoofingProviding and Installing Thatch Roofing with Bamboo Support at Site of size 11.20 X 6.4 M. As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As Per Quotation |
| 99 | Cafeteria Repiar Work |
| 100 | Scrapping of Old White WashScrapping old white or colour wash including disposal of refuse as directed by Engineer-In-charge within a distance of 60 meters (200 feet)UP PWD SSR 2020(Chapter 17 Serial no. 18 /58) |
| 101 | Dismantling of Existing PlasterDismantling existing plaster including disposal of refuse as directed by Engineer-In-Charge within a distance of 60.UP PWD SSR 2020(Chapter 17 Serial no. 16 /58) |
| 102 | BrickworkBrick work with common burnt clay (non modular) bricks of class-150 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement 4 coarse sand) PWD LUCKNOW SOR-2020-21,I/P-9.6.4.1/49 |
| 103 | Plaster, Wall PuttyProviding and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. PWD LUCKNOW SOR-2020-21,I/P-13.26/30 |
| 104 | Ceiling Plaster 6mm Celling plaster 1:3 (1 cement : 3 fine sand) cement & fine sand in F.M. not less than 1.25, 1:3 including chiping of RCC surface before ceiling plaster. The cost of including all material, labour T&P and scafolding etc. complete. UP PWD SSR 2020(Chapter 13 Serial no. 13) |
| 105 | Internal Plaster12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.PWD LUCKNOW SOR-2020-21,I/P-13.1/30 |
| 106 | External PlasterWashed stone grit plaster on exterior walls height upto 10 metre above ground level, in two layers, under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square metre, top layer 15 mm cement plaster 1:1/ 2:2 (1 cement: 1/2 coarse sand : 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippings ,complete as per specification and direction of Engineer-in- charge (payment for providing grooves shall be made separately.UP PWD SSR 2020(Chapter 13 Serial no. 19) |
| 107 | Painting, Intarnal PaintingDistempering (first coat) with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over & including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian, paints after thoroughly brushing the surface free from mortar droppings and other foreign matter and also including preparing the surface even with plaster of approved synthetic material and sand papered smooth including cost of all materials. UP PWD SSR 2020 (Chapter 15 Serial no. 13) |
| 108 | External PaintingFinishing walls with Textured exterior paint @ 3.28 Ltr. per 10Sqm of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat.over one coat of primer applied 2.20Ltr 10 Sqm. UP PWD SSR 2020 (Chapter 15 Serial no. 32) |
| 109 | Slab WaterproofingProviding and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations:(a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. (b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement: 5 coarse sand) admixed with water proofing compound conforming to IS: 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1) cement 4 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge including laying glass fibre cloth With average thickness of 120 mm and minimum thickness at khurra as 65 mm. PWD LUCKNOW SOR-2020-21,I/P-22.27.1/41 |
| 110 | Kota Stone FlooringKota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the stab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement: 4 coarse sand) PWD LUCKNOW SOR-2020-21,I/P-11.26.1/26 |
| 111 | Bathroom FlooringProviding and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete. PWD LUCKNOW SOR-2020-21 ,I/P- 11.37/26 |
| 112 | Bathroom DadoProviding and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shadecomplete. UP PWD SSR 2020, I/P-11.37A/26 |
| 113 | Waterproofing Treatment to WC and BathProviding and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured. CPWD SOR-2021 VolI-I ,I/P- 22.6/470 |
| 114 | Door and Window FrameProviding wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Second class teak wood. PWD LUCKNOW SOR-2020-21 ,I/P-9.1.1/19 |
| 115 | Door and Window ShutterProviding and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note- Butt hinges and necessary screws shall be paid separately) 9.5.1 Second class teak wood. PWD LUCKNOW SOR-2020-21 ,I/P-9.5.1/19 |
| 116 | Flush DoorProviding and fixing ISI marked flush door shutters conforming to IS 2202 (Part 1) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 9.21.1 35 mm thick including ISI marked Stainless Steel butt hinges with necessary.PWD LUCKNOW SOR-2020-21 ,I/P-9.21.1/19 |
| 117 | UPVC Door FrameProviding and Fixing factory made uPVC door frame, made of uPVC exturded sections, of size 65 mm x 55 mm with wall thickness 2.0 mm (± 0.2 mm), corners of the door frame to be mitred cut and jointed with plastic brackets and stainless steel screws, reinforcing hinge side vertical of the frames with PVC profile of Size 28 mm x 30 mm having wall thickness 2 mm (±0.2 mm), including providing & fixing 3 nos of 125 mm long stainless steel hinges to the frame, fixing the frame with jamb with required number & size of anchor dash fastners, all complete as per manufacturer\"s specification and direction of Engineer-in-charge. CPWD SOR-2021 Vol-I ,I/P-9.143/207 |
| 118 | UPVC DoorProviding and fixing factory made uPVC white colour casement/casement cum fixed glazed windows comprising of uPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware\"s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge (Single / double glass panes and silicon sealant shall be paid separately) Note For uPVC frame, sash and mullion extruded profiles minus 5% tolerancein shall be made dimension ie in depth & width of profile shall be acceptable Vanation in profile dimension in higher side shall be accepted but no extra payment on this account 9.147 C.2 Casement door with top hung ventilator with 3D and S.S. friction hinges (400 * 19 * 1.9mm) made of (big series) frame 67 * 64 mm, sash 67 x 110 mm & mullion 67 * 80 mm all having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door upto 2.50 sqm) (Openable Door with Top Fix) PWD LUCKNOW SOR-2020-21,I/P-9.147C2/20 |
| 119 | UPVC VentilatorProviding and fixing factory made uPVC white colour casement/casement cum fixed glazed windows comprising of uPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware\"s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge (Single / double glass panes and silicon sealant shall be paid separately) Note For uPVC frame, sash and mullion extruded profiles minus 5% tolerancein shall be made dimension ie in depth & width of profile shall be acceptable Vanation in profile dimension in higher side shall be accepted but no extra payment on this account Fixed window / ventilator made of (small series) frame 47 x 50 mm & mullion 47 x 68 mm both having wall thickness of 1.9±0.2 mm and single glazing bead of appropriate dimension. (Area upto 0.75 sqm.) PWD LUCKNOW SOR-2020-21,I/P-9.147 B.1/20 |
| 120 | LintelProviding Wood work for Lintel (a ) UP Teak Wood (Cut to Size) UP PWD SOR-2020-21,I/P-28(b)/14 |
| 121 | Butt HingesProviding and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. complete: 9.55.1 125x65x2.12 mm. CPWD SOR-2021 Vol-II ,I/P-9.55.1/19 |
| 122 | Door BoltsProviding and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete 9.62.1300x16 mm CPWD SOR-2021 Vol-II ,I/P-9.62.1/19 |
| 123 | Tower BoltProviding and fixing ISI marked oxidised M.S. tower boit black finish. (Barrel type) with necessary screws etc complete 9.63 300x10 mm 9.63.1 250x10 mm. CPWD SOR-2021 Vol-II ,I/P-9.63.1/19 |
| 124 | Door HandleProviding and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete_ENTI 9.66.1 125 mm. CPWD SOR-2021 Vol-II ,I/P-9.66.1/19 |
| 125 | Electrical WorkWiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed steel conduit, with piano type switch, phenolic laminated sheet, suitable size MS box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc. as required.1.1.3 Group C. CPWD DSR 2022 E&M (I/P - 1.1.3/1) |
| 126 | Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single core cable in surface/ recessed medium class PVC conduit alongwith 1 No. 4 sq. mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. CPWD DSR 2022 E&M (I/P - 1.12/3) |
| 127 | Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc. as required.1.27.5 8 Module (125mm x 125mm) CPWD DSR 2022 E&M (I/P - 1.27.5/6) |
| 128 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required. 14.15.2 90 mm dia (OD-90 mm & ID-76 mm nominal) CPWD DSR 2022 E&M (I/P - 14.15.2/43) |
| 129 | Installation, testing and commissioning of pre-wired, fluorescent fitting / compact fluorescent fitting of all types, complete with all accessories and tube/lamp etc. directly on ceiling/ wall, including connections with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable and earthing etc. as required. CPWD DSR 2022 E&M (I/P - 1.41/7) |
| 130 | Ceiling FanSupply, Installation, Testing and Commissioning of 1200 mm sweep, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) Motor, class of insulation: B, 3 nos. blades, 30 cm long down rod, 2 nos. canopies, shackle kit, safety rope, copper winding, Power Factor not less than 0.9, Service Value (CM/M/W) minimum 6.00, Air delivery minimum 210 Cum/Min , 350 RPM (tolerance as per IS : 374-2019), THD less than 10%, remote or electronic regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C (max.), insulation resistance more than 2 mega ohm, suitable for 230 V, 50 Hz, single phase AC Supply, earthing etc. complete as required. CPWD DSR 2022 E&M (I/P - 19.1/72) |
| 131 | Interpretation Centre Work |
| 132 | Interpretation CenterProviding and installing of Interpretation Center of Wooden base sheesham wood 1/2 inch with 3mm clear A-Cast Acrylic (Reverse UV - Printing with white layer) & SS piller (3x3x42)inch with plate As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As per Quotation |
| 133 | Renovation of Well Work |
| 134 | 3Hp Pump Providing and Supplying 3Hp Pump as per Specification. As per Quotation |
| 135 | PVC PipeU-PVC pipes (working pressure 4 kg / cm²) Rubber (Seal) Ring 110 mm dia. CPWD SOR-2020-21, Vol I I/P-7191/45 |
| 136 | PVC Pipe ClipsProviding and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete.12.43.2 110 mm. CPWD SOR-2020-21, Vol I I/P-12.43.2/263 |
| 137 | MS AngleStructural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. CPWD SOR-2020-21, Vol I I/P-10.1/224 |
| 138 | PaintingPainting 1st coat over priming coat (butexcludingcost of priming coat) on steel and other metal surfaces upto 10cm width or girth or small articles not exceeding 0.10 Sq.M. in area with superior synthetic enamel such as Luxol 3, Hi gloss Apcolite, Superlac, Dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other foreign matter sand papering and scrapping including cost of all materials, labour, tools and plants etc. required for proper completion of work. UP PWD SSR 2020(Chapter 15 Serial no. 02) |
| 139 | Childrens Play Equipments |
| 140 | Children\"s PlaySupply & Installation of Roto Multi Play Fun System - 125\" HT. GI SQ. DECK WITH HOUSE CANOPY – 01 NO. GI SQUARE DECK : THE SIZE OF THE SQUARE PLATFORM SHOULD BE MINIMUM 1150 MM X 1150 MM AND IS MADE UP OF GI. ROTO HOUSE CANOPY - HOUSE CANOPY IS MADE UP OF LLDPE ROTOMOULDED PLASTIC.THIS IS IN SHAPE OF HOUSE ROOF. HOUSE CANOPY SIZE WILL BE MINIMUM – 1500MM X 1600MM. 5\" HT. GI STAIRCASE – 01 NO5\" HT. FRP ROCK CLIMBER – 01 NO.5\" HT. ROTO WAVE SLIDE – 01 NO. DOUBLE SLIDE ENTRY – 01 NO.. THE MINIMUM SIZE HAS TO BE 930 X 250 X 60 MM.CROSS & ZERO RAILING – 01 NO.THE MINIMUM SIZE OF THE CROSS & ZERO RAILING SIZE MUST BE 1120 X 920 X 60 MM. THE MINIMUM SIZE OF THE CROSS & ZERO DRUM SHOULD BE 190 X 170 X 540 MM.DOUBLE POST SWING – 01 NO.SPARROW – 01 NO. SPARROW IS MADE UP OF LLDPE PLASTIC IN ROTATIONAL MOULDING PROCESSES. THE MINIMUM SIZE OF THE SAPRROW SHOULD BE 640 X 690 X 30 MM. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly. As per Quotation |
| 141 | \"Supply & Installation of The Crystal Maze : The Crystal maze is made up of 15 NB G.I. pipe B-Class ISI mark. The pipes are connected with 150 mm dia x 5mm thick centre and side support is made up of 40 NB G.I. pipe. The connecting bolts are covered with nylon bolt cap. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly etc. Complete.\" As per Quotation |
| 142 | \"Supply & Installation of Platform Merry Go Round : The Platform of merry go round consists of non-skid type aluminium chequered plate of 14 SWG. The ring on which the chequered plate is based is made out of 25 NB GI pipes. The support below the chequered plate is of 40 x 40 x 5 and 25 x 25 x 5 GI angle. The whole structure is mounted on heavy-duty bearing shaft permanently lubricated with water sealant. The stand of merry go round platform is made out of 80 NB GI pipes. Railing is made up of 20 NB GI B-Class pipe. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly etc. Complete.\" As per Quotation |
| 143 | \"Supply & Installation of 7\" Ht. Roto Zig Zag Slide :The module is made up of LLDP plastic. The inside dimension of the slide will be 420 mm. The length of the slide will be 3825 mm. This is a double wall slide, having 5-6 mm thickness on each wall. Slide will be in two or multi-colour. Slide modules has internal stiffeners for strength & rigidness. Ladder main frame is made up of 25 NB B-Class ISI make G.I pipe & hand rail of 20 NB B-Class ISI make G.I. pipe. The platform is made up of 14 SWG G.I. sheets with anti-skid for firm foot grip. The triangular steps are of 16 SWG G.I. sheets. Slide support is made up of 40 NB G.I pipe. Platform support is made up of 80 NB GI pipe. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly etc. Complete.\" As per Quotation |
| 144 | Supply & Installation of 8\" Lg. Roto Crawling Tunnel : Tunnel is made up of LLDPE plastic in rotational moulding process which is non-ageing, non-toxic and have U.V. stabilizers for colour resistance. Diameter of tunnel should be 760 mm. LLDPE plastic entry panel is provided for safe entry in to tunnel. Length of tunnel will be 2.4 mtr. Long. Support is made op if 80 NB G.I pipe b class ISI mark. It is connected with 20 NB G.I pipe and clamp made up nylon 66. Support pipe is covered with nylon pipe end cap. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly etc. Complete. As per Quotation |
| 145 | Supply & Installation of 5\" Ht Net Rock Climber : Net rock climber frame is made up of 40 NB GI B-Class pipe. Net is made up of 19 dia PP rope. Ball clamps are made up of nylon. Rock climber is made up of FRP having inbuilt M.S angle frame. Rock holds are made up of nylon. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly etc. Complete. As per Quotation |
| 146 | Supply & Installation of Balancing Bridge :Balancing bridge side frame is made up of 40 NB G.I pipe Side support is made up of 40 NB G.I pipe.9 no of float made up of LLDEP plastic is fixed on 12 mm dis wire rope. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly etc. Complete. As per Quotation |
| 147 | Providing and Installation of Double Swing for Garden. As per Quotation |
| 148 | Supply & Installation of Standard See Saw :Lever is made up of 25 NB GI pipes & 20 NB G.I B- class pipe and fitted on stand made up of 50 NB GI pipes B-class ISI mark. All welded joints are properly grounded and coated with an epoxy sealant for rust resistance. All sharp edges and corners are properly ground before painting. Powder coat done by first coat of primer – Jotun brand 40-50 micron thickness and top coat of pure polyester powder with 70- 80 micron thickness. Roto moulded plastic seats which is non-ageing, non-toxic and have U.V stabilizers for colour resistance. The bearing used shall be heavy duty pedestal ball bearing. The item includes all necessary acessories, fixtures and equipments required for installation of entire assembly etc. Complete. As per Quotation |
| 149 | Adventure sports |
| 150 | Rock ClimbingProviding and Installing Rock Climbing for Kids of FRP, Wall Size Wall Size H-24xW-12 Feet Panel Size & Thickness – 1x1 Meter / 10mm (Wall Mount) @1800/- Per SQFTwith Support Tower of 24 ft X 10 ft X 8ft with foundation and sub-frames As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As per Quotation |
| 151 | Low Rope CourseProviding and Installing Low Rope Course with Activity Size – H-10 x L-20 FeetIron – MS Iron Tube 70mmPP Rope – 12mmSteel Wire - 10-12mm As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As per Quotation |
| 152 | Commando Net WallProviding and Installing Commando Net Wall of Net Size – W-10 x L-30 x H-15 FeetIron – MS Iron Tube 70mmPP Rope – 12mm As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As per Quotation |
| 153 | Tyre Net Wall Providing and Installing Tyre Net Wall of size Activity Size – H-10 x W-10 FeetIron – MS Iron Tube 70mmUsed Tyre – 17 Inch As directed by Engineering incharge includingtools and tackles as per drawing and specifications. As per Quotation |
| 154 | Lawn Area |
| 155 | Cast-in-Situ Cement Concrete M 20 Kerb.Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per Clause 408. PWD LUCKNOW SOR-2020-21 MORTH 804(8.1),I/P-26.17/57 |
| 156 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20%: one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) CPWD Horiticulture-2020,I/P-2.13/84 |
| 157 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). CPWD Horiticulture-2020,I/P-2.2/83 |
| 158 | Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment). CPWD Horiticulture-2020,I/P-2.3/83 |
| 159 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). CPWD Horiticulture-2020,I/P-2.25/87 |
| 160 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately).In rows 5 cm apart in both directions. CPWD Horiticulture-2020,I/P-2.10/83 |
| 161 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) Shrubs Plant. CPWD Horiticulture-2020,I/P-2.57.2/101 |
| 162 | Providing and stacking of Duranta Golden, having ht.15 to 20 cm bushty shape with fresh and healthy leaves in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. CPWD Horiticulture-2020,I/P-6.12/155 |
| 163 | Ficus panda of height 30-45 cm. with 3-4 branches and healthy foliage in polybag of size 20 cm. CPWD Horiticulture-2020,I/P-10369/49 |
| 164 | Providing and stacking of Nerium oleander (kaner) of height 60-75 cm. with 5-6 branches in poly bags of size 25 cm as per direction of the officer-in-charge. CPWD Horiticulture-2020,I/P-8.49/181 |
| 165 | Providing and stacking of Michelia champa (Golden Champa) of height 90- 105 cm. in earthen pots of size 25 cm as per direction of the officer-in-charge. CPWD Horiticulture-2020,I/P-7.55/167 |
| 166 | Cane Bench |
| 167 | Cane Benches:Cane Garden Bench (Product Details Material: Indian Cane And Malaysian Rattan Color: Natural Cane Tone with Clear Touch Wood Finish Dimensions Height: 17 inches Length: 5Feet Width: 16inches) As per Quotation |
| 168 | Bio - Toilet |
| 169 | ExcavationEarth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the 2.8.1 All kinds of soil. PWD LUCKNOW SOR-2020-21,I/P-7.2.8.1/10 |
| 170 | PCC for BaseProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) PWD LUCKNOW SOR-2020-21,I/P-8.4.1.3/12 |
| 171 | Brick SolingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per Technical Specification Clause 412. PWD LUCKNOW SOR-2020-21,I/P-25.20.MORD-412(4.18)/49 |
| 172 | Brick work in Foundation and PlinthBrick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in Cement mortar 1:4 (1 cement: 4 coarse sand) PWD LUCKNOW SOR-2020-21,I/P-9.6.1.1/ 16 |
| 173 | Plastering for Brickwork15 mm cement plaster 1:3 (1 cement 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall. PWD LUCKNOW SOR-2020-21,I/P-13.10/30 |
| 174 | Bio ToiletProviding and installing of Bio toilet with MS CONTAINOR Size: 18x6x8 ft , Height 8 ftWestern Style : 2 NosUrinal : 4 NosWith Complete Plumber FittingInside Wooden Work on WallsBase in PlywoodGents Toilet MS CONTAINOR Size: 9x6x8 ftLadies Toilet3 Western CommodWith Complete Plumber FitingAs directed by Engineering incharge includingtools and tackles as per drawing and specifications. As per quotation |
| 175 | RO & Water Coolers for drinking water arrangement for visitors |
| 176 | ExcavationEarth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the 2.8.1 All kinds of soil. PWD LUCKNOW SOR-2020-21,I/P-7.2.8.1/10 |
| 177 | PCC for BaseProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: 1.4:8 (1 cement: 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size) PWD LUCKNOW SOR-2020-21,I/P-08.4.1.8/12 |
| 178 | Brick SolingLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per Technical Specification Clause 412. PWD LUCKNOW SOR-2020-21,I/P-25.20.MORD-412(4.18)/49 |
| 179 | Earth FillingSupplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete. PWD LUCKNOW SOR-2020-21,I/P-07.2.27/10 |
| 180 | Brick Work Below PlinthBrick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in 9.6.1.1 Cement mortar 1:4 (1 cement: 4 coarse sand) PWD LUCKNOW SOR-2020-21,I/P-9.6.1.1/16 |
| 181 | External Plaster Washed stone grit plaster on exterior walls height upto 10 metre above ground level, in two layers, under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square metre, top layer 15 mm cement plaster 1:1/ 2:2 (1 cement: 1/2 coarse sand : 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippings ,complete as per specification and direction of Engineer-in- charge (payment for providing grooves shall be made separately. UP PWD SSR 2020(Chapter 13 Serial no. 19) |
| 182 | Finishing walls with one coat of waterproof cement paint of approved quality on previously old treated surface with this paint to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powder material including curing and cost of allmaterials. PWD LUCKNOW SOR-2020-21,I/P-15.26/55 |
| 183 | Water Cooler Providing and Installing water Cooler. 1.USHA “SS 150/150” Water Cooler Specifications: Complete Stainless Steel Body Cooling 150 liters/ hour Storage Capacity 150 liters 2.3 stage Filter with steel frame. As per Quotation |
| 184 | Approach Roads |
| 185 | Site CleaningClearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. PWD LUCKNOW SOR-2020-21,I/P-MORD 201(2.1)/47 |
| 186 | EarthworkConstruction of Subgrade with Material Obtained from Borrow Pits (For Carted Earth Work) Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m.transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 PWD LUCKNOW SOR-2020-21,I/P-MORD 301.5 (3.4) /48 |
| 187 | Supplying ,Laying of Stone aggregate for WBMSuppying ,Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. CPWD SOR-2021 Vol-II ,I/P- 16.3/325CPWD SOR-2021 Vol-II ,I/P- 16.4/325 |