| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead complete as per the direction of Engineer-in-charge. |
| 2 | Earth work excavation in foundation in all kinds of soil or gravelly soil within 50 m initial lead and 1.5 m initial lift including rough dressing and leveling the bed as per thedirection of engineer-in-charge |
| 3 | Conveyance of excavated materials such as rough stone, metal, khoa, chips, sand, surki, quarry bubbish, moorum, laterite stone , washed gravel, fly ash and earth away from the work site by mechanical means including loading and unloading and disposing the same within 5km truck lead as per the direction of Engineer in charge. |
| 4 | Providing & filling manually with selected sand in layers not exceeding 150 mm thick including watering & compacting with all leads and lifts. Including cost, carriage, royalty etc as per the direction of Engineer-in-Charge. |
| 5 | Cement concrete (1:3:6) with 4cm size hard granite crusher broken metal of approved quality free from skin and weathered surface and foreign materials with all leads and delifts incuding cost, conveyance, royalty & taxes etc of all materials, all labour charges, T & P, hires & running charges of all machinaries & equipment as required, watering & curing etc. complete as per direction of Engineer-in-charge. |
| 6 | R.C.C M-25 grade with crushed granite coarse aggregate of size 20 mm down graded mixed with concrete mixer with all leads, lifts and delifts including all cost, conveyance, royalty & taxes etc of all materilas, all labour charges, T&P, hire & running charges of all machinaries & equipment as required, watering & curingetc. complete as per direction of Engineer in charge |
| 7 | Supplying,fitting and placing uncoated HYSD bar reinforcement complete as per drawing & technical specification with all cost and conveyance etc. complete as per direction of Engineer in charge. |
| 8 | Rigid smooth centering and shuttering for RCC works including false works and dismantling them after casting including cost of materials T&P etc. complete as per the direction of Engineer-in-charge(a) R.C.C Walls and fins etc. |
| 9 | Rigid smooth centering and shuttering for RCC works including false works and dismantling them after casting including cost of materials T&P etc. complete as per the direction of Engineer-in-charge(b) R.C.C slabs |
| 10 | 6 mm thick C.P in cm (1:4) including the cost of all materials labour T&P sundries etc complete |
| 11 | Provision of display board |