Power Boards / Undertakings / PSU Closing in 0 days TDR #39282907

Tender For Annual Maintenance Of Railway Track Stagei Ii At Ghtp Lehra Mohabbat

Issued by Boards / Undertakings / PSU · lehra, Punjab
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Sep 2023
0 days left
EMD
1.54 Lakhs
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
lehra → Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Maintenance Of Railway Track Stagei Ii At Ghtp Lehra Mohabbat

BOQ

Name of Work: Annual Mtc. of Railway track (Stage-I & II) at GHTP, Lehra Mohabat
Sl. No. Item Description
1Part-I =Track of stage-I
2Routine mtc. of B.G track length of about 23.67 kms including its 52 Nos. points and x-ingsand level x-ings involving the following operations to be performed during the month in order to keep the entire Rly. Track in fit & running conditions for movement of trains at all times.a) Patrolling of entire length of 23.67 kms track for identification and rectification of track, tightening of all loose fittings such as keys, bolts, jaws etc.b) Shallow screening/overhauling of BG track (Average qty. = 635 Mtr. Per month) including its points and X-ings to provide effective drainage of water from the track and disposal of screened muck to suitable site as decided by Er-in-charge within the plant area as per IRPWM. c) Through packing of B.G track (Average qty. = 1295 Mtr. Per month) including its points and X-ings observing all stipulations complete as per IRPWM.d) Mtc. of points and crossings (52 Nos.) by cleaning, overhauling, greasing etc. twice a month.e) Mtc. of level x-ing by overhauling in running condition of track including graphiting etc. as per requirement. f) Removal of burr metal from track by chisel by deploying hammer man.g) Up keeping the dead ends.h) Pick up slacks of low joints to maintain track geometry.i) Maintaining curves and re-alignment by string method.j) Maintaining gaps at fish plated joints & Oiling and graphiting etc. (Average qty. =280 Joints Per month).k) Providing & maintaining katcha /pacca drains in railway yard for quick drainage of rain water from railway track.l) Extensive patrolling of track during monsoons.m) Routine cleaning of railway track by removing of grass / wild growth from track and around up to 90 cm from toe of ballast to keep it free from grass/ wild growth manually/ by using pesticides as per requirement. n) Upkeep of sign boards / signals etc. as per railway standards.o) Drilling of holes & cutting of rails as per requirement.p) Spreading the ballast when required. q) Replacement of rails, sleepers, points & crossings which are worn out & damaged.
3Repair of tongue rail points and crossing by welding, grinding and making to its original Specification/ dimension. It includes the cost of labour for dismantlement of tongue rail, points and crossing, its welding to make it in original shape and geometry by grinders and refixing/ realignment to match the original geometry/ level of rail track complete.
4(a) Tongue Rails
5(b) Crossings
6Supply of skilled and unskilled labour, machinery as per requirement/ directions of Er. In charge to undertake take the following mentioned items of work as and when required.a) Changing of sleepers damaged or unserviceable at any time.b) Changing of rails 52 kg including transportation from store to site.c) Fixing check rails.d) Cutting of rails with hexa blades.e) Drilling holes in 52kg rails (29 mm to 31mm)f) Realignment of rail damaged due to derailmentg) For attending any allied works.The above labour/ machinery will be deployed only in emergent condition such as derailment/accident/other emergent repairs. All T&P, consumables etc. shall be arranged by the contractor at his own cost, so the contractor should quote rates accordingly.
7Skilled workers
8Unskilled workers
9Tractor with or without trolley
10Hydra Crane
11Part-II= Supply of Material:-
12Supplying and stacking of graded stone ballast of approved size as per railway speciation of 63mm ballast in GHTP railway yard at different locations as directed by Engineer Incharge.
13Supply of bolts and nuts (25mm dia) of various sizes & length as per Railway standards as detailed below:-i) 525 mm long ii)400 mm long iii) 350 mm long iv) 300 mm long v)250 mm long vi) 210 mm long Note:- Size & No. of bolts may vary as per requirement.
14Supply of safety locks with chain, lock pin Complete set as per railway standard provided at site
15Supply of safety lock bolt 25mm dia size, length 210mm per railway standard provided at site
16Grease- Servo Gem EP-1
17Part-III (Track of stage-II)
18Routine mtc. of B.G track length of about 5.5 kms approx. of stage-II including its 21 Nos. points and x-ingsand level x-ings involving the following operations to be performed during the month in order to keep the entire Rly. Track in fit & running conditions for movement of trains at all times.a) Patrolling of entire length of 5.5 kms track of stage-II for identification and rectification of track, tightening of all loose fittings such as keys, bolts, jaws etc.b) Shallow screening/overhauling of BG track (Average qty. = 150 Mtr. Per month) including its points and X-ings to provide effective drainage of water from the track and disposal of screened muck to suitable site as decided by Er-in-charge within the plant area as per IRPWM. c) Through packing of B.G track (Average qty. = 300 Mtr. Per month) including its points and X-ings observing all stipulations complete as per IRPWM.d) Mtc. of points and crossings (21 Nos.)by cleaning, overhauling, greasing etc. twice a month.e) Mtc. of level x-ing by overhauling in running condition of track including graphiting etc. as per requirement.f) Removal of burr metal from track by chisel by deploying hammer man.g) Up keeping the dead ends.h) Pick up slacks of low joints to maintain track geometry.i) Maintaining curves and re- alignment by string method.j) Maintaining gaps at fish plated joints & Oiling and graphiting etc. (Average qty. =90 Joints Per month). k) Providing & maintaining katcha/ pacca drains in railway yard for quick drainage of rain water from railway track. l) Extensive patrolling of track during monsoons. m) Routine cleaning of railway track by removing of grass / wild growth from track and around up to 90 cm from toe of ballast to keep it free from grass/ wild growth manually/ by using pesticides as per requirement.n) Upkeep of sign boards / signals etc. as per railway standards.o) Drilling of holes & cutting of rails as per requirement.p) Spreading the ballast when required. q) Replacement of rails, sleepers, points & crossings which are worn out & damaged.

AI Tender Summary

OUR REF NO 39282907
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 25-09-2023
Authority
Authority Name Punjab State Power Corporation Limited
Work Description Annual Maintenance Of Railway Track Stagei Ii At Ghtp Lehra Mohabbat
Basic Detail
Tender No 118/CCMC-265/2023-24
Bidding Type Tender
Location
City lehra
State Punjab
Key Dates
Publish Date 23 Aug 2023
Submission Date 25 Sep 2023
Open Date 27 Sep 2023
Finance
Tender Value Ref. Documents
Tender Fee 1180
EMD 1.54 Lakhs
Exemption Not Available
Document List
DNIT.pdf
NIT.pdf
5a16cce4-9f6f-429d-b691-6786393e70f9.html
BOQ_221416.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 23, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 25, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 27, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

DNIT.pdf

pdf

NIT.pdf

html

5a16cce4-9f6f-429d-b691-6786393e70f9.html

xls

BOQ_221416.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender