| 1 | Earthwork in excavation for structures as per drawing and technical specification clause 305.10 including setting out,construction of shoring and bracing ,removal of stumps and other deleterious material and disposed upto a lead of 50 m |
| 2 | Slip clearance (by manual means) of earth and boulder including disposal complete directed by EIC |
| 3 | Cleaning of road side drain including minor slip and disposal of the surplus material |
| 4 | Dressing road side pattries including levelling the patri surface true to roadtemplete i/c filling of the roads side patri complete etc. |
| 5 | White washing of parapet walls of CD work and trunks |
| 6 | Cement washing/ painting including supply of all material, labours,T&P etc. Required for proper completion of the work. One coat |
| 7 | Painting synthetic enamel paint of required shade and manufacturing in/c supply of all |
| 8 | Sweeping and cleaning of existing road surface, removal of loose material like soil, small stone,garbage etc and disposal ofswept material upto 100m in distance i/c its burning if required, i/c cost of material labour and T&P complete |
| 9 | Cleaning of chokedscuppers and catch pits and i/c the disposal of surplusmaterial within road boundry i/c dressing & levelling and ramming for same as directed by E.in C etc complete |
| 10 | As above but full chocked |
| 11 | As above but half chocked |
| 12 | Clearing and grubbing road land including uprooting wild vegetation ,grass,bushes,shrubs,sapling and trees of girth upto 300 mm |
| 13 | Laying and Consolidation of 20mm thick PREMIX CARPET over tack coat with graded approved grit and Maxphalt (Bitumen) i/c heating the paint to the required temprature and mixing in mixualorin hand drum also i/c the cost of all material, labours and T&P. etc. for proper completion of the work with seal coat. |
| 14 | Supply and Stacking of Stone ballast size 53-22.4mm for Top coat in required tamplate etc. i/c all cost of material,labours and T&P etc. |
| 15 | Laying & Consolidation of stone ballast of size 53-22.4mm/63-45mm/90-45mm in Top/Inter /soling coat i/c opening out the stacks,sorting stone ballast,repair patches, in existing road surface with stone ballast , also i/c the cost all material, labours and T&P,lead upto 90m etc. |
| 16 | Hand packed stone filling in back of wallsi/ccost of all materials as per direction of Engineer in charge |
| 17 | R.R. stone masonary with boulder stone in 1:6 cement sand mortar in repairing.new work of walls, drains, parapets and else where required at site including cost of 43 grade cement. For proper completion of the work. |
| 18 | R R Stone masonary laid dry with hard stone (River boulder) in repairing/new work of walls drains,parapets and elsewhere required at site including supply of all material,labour T&P etc. |
| 19 | Making and placing in position of CC bond stone size 0.15x0.15x0.60 m in RR stone masonary including casting,placing,all materials,labour and T&P as per direction of E.I.C |
| 20 | Concrete with cement,coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundation and floors including supply of all materials and etc |
| 21 | providing concrete for plain/reinforced concrete in open foundation complete as per drawing nominal mix 1:2:4 |
| 22 | 15mm thick plaster 1:4 |
| 23 | Reinforcement work for RCC work i/c all cost of labour,T&P and all materials i/c cost of steel for proper completion of work in drain work or elsewhere etc. |
| 24 | REINFORCED CEMENT CONCRETE IN OPEN FOUNDATION RCC M20 |
| 25 | Mild steel iron work in small size such as trusses.built-up sections,gratings,railing and posts work in all sizes of structural steel & MS pipe,brought to required form i/c drilling holes,rebitting or welding where necessary and also i/c supply of steel,bolt,nuts etc. and their fixing requiredfor proper completion of work in repairing or new work. |
| 26 | Transporting and placing in position at site of G.I.Double twisted hexagonal gabions (different sizes) i/c cost of materials,river boulder,labour,tying the open edge with GI wire and T&P required for proper completion of work complete.Gabions shall be supplied by THDC free of cost. |