Power Government Departments Closing in 0 days TDR #39266015

Tender For Providing & Erection Of 3-Phase Lt Extension To Reduce Lengthy Services To Sop To Tubewell In Village Saloh-Ghaluwal From Existing Sub-Station And 3-Phase Lt Extension For Sop To Various Tubewells And Interlinking Of Existing Substations At Vil

Issued by Government Departments · gagret, Himachal Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Aug 2023
0 days left
EMD
8156
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
gagret → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Providing & Erection Of 3-Phase Lt Extension To Reduce Lengthy Services To Sop To Tubewell In Village Saloh-Ghaluwal From Existing Sub-Station And 3-Phase Lt Extension For Sop To Various Tubewells And Interlinking Of Existing Substations At Village Ghaluwal And 11 Kv Ht Line & 11 / 0.4 Kv 100 Kva Sub-Station For Sop To Various Tubewells At Village Ghaluwal And 3-Phase Lt Line For Sop To Tubewell From Existing 11 / 0.4 Kv, 250 Kva Substation Sl-2 In Village Saloh Under Esd, Hpsebl Haroli. ( Bid No. Ged-31 / 2023-24 ) Name Of Scheme: Sop To Tubewells Under ( Op ) Circle, Hpsebl, Una ( Phase-Iii

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 26-Aug-2023 Corrigendum for Bid No GED-31/2023-24 Financial Bid 28-Aug-2023

BOQ

Name of Work: Tender for prov. & erection of 3-Phase LT extension to reduce lengthy services to SOP to tubewell in village Saloh-Ghaluwal from existing sub-station and 3-Phase LT extension for SOP to various tubewells and interlinking of existing substations at village Ghaluwal and 11 KV HT line & 11/0.4 KV 100 KVA sub-station for SOP to various tubewells at village Ghaluwal and 3-Phase LT line for SOP to tubewell from existing 11/0.4 KV, 250 KVA substation SL-2 in village Saloh under ESD, HPSEBL Haroli. (Bid No. GED-31/2023-24) Name of scheme: SOP to Tubewells under (OP) Circle, HPSEBL, Una (Phase-III)
Sl. No. Item Description
1Erection Part of3-Phase LT Line(T.S. No 38/2023-24)
2Erection of LT line. Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
3Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
4Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
5Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with 7/3.15 mm Conductor ofNew 3-Ph. L.T Line complete in all respect.
6G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
7Loading of materials LT lines materials on truck at Divisional Store and same material unloading at road head site and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
8Erection Part of3-Phase LT Line(T.S. No 81/2023-24)
9Erection of LT line. Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
10Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
11Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
12Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with 7/3.15 mm Conductor ofNew 3-Ph. L.T Line complete in all respect.
13G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
14Loading of materials LT lines materials on truck at Divisional Store and same material unloading at road head site and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
15Erection Part of3-Phase LT Line(T.S. No 102/2023-24)
16Erection of LT line. Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
17Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
18Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
19Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with 7/3.15 mm Conductor ofNew 3-Ph. L.T Line complete in all respect.
20G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
21Loading of materials LT lines materials on truck at Divisional Store and same material unloading at road head site and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
22Erection Part of 11 KV HT Line(T.S. No 82/2023-24)
23Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
24Erection of S.T Single Pole 9 Mtr. Long for Tapping :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit ,G.O. Switch, Alluminium Paint and ramming & painting of poles complete in all respect.
25Erection of S.T Doule Pole 9 Mtr. Long Dead End Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
26Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
27Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
28Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80mm²) stringing and sagging, binding with insulator complete in all respect.
29Laying of G.I Wire, Stringing,Sagging and binding complete in all respect.
30Erection of GO switch complete in all respect.
31Fixing jumper complete in all respect.
32Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
33Erection Part of 11/0.4 KV, 100 KVA Transformer(T.S. No 82/2023-24)
34Erection of 100 kva S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium PaintAI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 4 Nos., Erection of LT cable, brabed wire and painting, 4 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. (100 kva S/Stn)
35Loading of S/Stn. complete and allied materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site).
36Supply Part 3-Phase LT Line (T.S. No 38/2023-24)
37Prov. RCC muff with concrete filling
38Prov. Eye Hook for earth wire
39Prov.Prov. Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.2 Mtr]
40Prov. Shackle Insulator (16 kN)
41Prov. D-Iron
42Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]
43Prov. L.T Stay wire 7/3.15 @ 6Kg P/set
44Prov. Nut & Bolt off sizes.
45Prov. G.I. Wire 8 SWG
46Prov. Aluminium Paint
47Prov. Red Oxide
48Supply Part Supply Part 3-Phase LT Line(T.S. No 81/2023-24)
49Prov. RCC muff with concrete filling
50Prov. Eye Hook for earth wire
51Prov.Prov. Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.2 Mtr]
52Prov. Shackle Insulator (16 kN)
53Prov. D-Iron
54Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]
55Prov. L.T Stay wire 7/3.15 @ 6Kg P/set
56Prov. Nut & Bolt off sizes.
57Prov. G.I. Wire 8 SWG
58Prov. Aluminium Paint
59Prov. Red Oxide
60Supply Part Supply Part 3-Phase LT Line(T.S. No 102/2023-24)
61Prov. RCC muff with concrete filling
62Prov. Eye Hook for earth wire
63Prov.Prov. Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.2 Mtr]
64Prov. Shackle Insulator (16 kN)
65Prov. D-Iron
66Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]
67Prov. L.T Stay wire 7/3.15 @ 6Kg P/set
68Prov. Nut & Bolt off sizes.
69Prov. G.I. Wire 8 SWG
70Prov. Aluminium Paint
71Prov. Red Oxide
72Supply Part of 11 KV HT Line (T.S. No 82/2023-24)
73Prov. RCC Muff with Concrete filling
74Prov.G.I.Wire No. 8 SWG in mtr.
75Run Through Str. ( ?) Formation on Singlr Pole Str.
76Prov.Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
77Prov.Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
78Prov.Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
79Dead End Str.
80Prov Belt Set Angle Iron (50x50x6) Length 1800mm x2 Nos.
81Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.
82Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos.( ?) Formation
83For G.O. Switch and D.O. Fuse.
84X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4Nos] for supporting DO fuse unit & GO switch
85G.O. Switch Handle Supporting (Channle Iron 75x40x6 mm) Length 460mm
86Prov.Nuts and Bolts of Various Sizes
87Prov.MS Half Clamp
88Prov.MS Full Clamp
89Prov.Barbed Wire
90Prov.Eye/Earth Hook
91Prov. Earth Wire Clamp
92Prov.11kv Disc Insulators complete for double pole str in all respect.
93Prov.11kv Pin Insulator with pincomplete in all respect
94Prov. Stay Wire (7/3.15 mm) (10 kg. per Stay Set)
95Prov.RedOxide (1.5 Ltr. Per Pole)
96Prov.Alluminum Paint
97Prov. 11kv D.O.Fuse unit.
98Prov. 11kv G.O.Switch complete.
99Transformer LT distribution Box & GO Switch fixing Assembly (T.S. No 82/2023-24)
100Prov. RCC Muffs with concerete filling
101Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
102Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
103Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
104Transformer Belting & Knee Bracing
105Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
106Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
107Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
108Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
109Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
110Transformer L.T Distribution Box and GO Switch fixing Assembly
111Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
112Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
113Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
114Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
115Prov. D.O Fuse Unit
116Prov. Surge Arrester, 9 kV Station Class(Porcelain Type)
117Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS,12 kV, 90 kN) including Dead End Clamps etc.)
118Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
119Prov. Pipe Earthing Set
120Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm (900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm) inside .painted /powder coated after primar coating with MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp
121Prov. Half Clamp (M.S. Flat 50X6 mm)
122Prov. Full Clamp (M.S. Flat 50X6 mm)
123Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
124Prov. Aluminium Thimble
125Prov. Aluminium Thimble
126Prov. Barbed Wire
127Prov. LT Cable (3.5 Core) 240 mm² outgoing
128Prov. LT Cable (3.5 Core) 400 mm² Incoming
129Prov. Energy Meter 3-?, 4 wire CT operated Static Tri-Vector meter (CT-300-400/5 A), Accuracy Class: 0.5S, Category-C, DLMS Compliantfor 100 KVA Transformer
130Prov. Aluminium Paint.
131Prov. Red Oxide

AI Tender Summary

OUR REF NO 39266015
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 28-08-2023
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description Tender For Providing & Erection Of 3-Phase Lt Extension To Reduce Lengthy Services To Sop To Tubewell In Village Saloh-Ghaluwal From Existing Sub-Station And 3-Phase Lt Extension For Sop To Various Tubewells And Interlinking Of Existing Substations At Village Ghaluwal And 11 Kv Ht Line & 11 / 0.4 Kv 100 Kva Sub-Station For Sop To Various Tubewells At Village Ghaluwal And 3-Phase Lt Line For Sop To Tubewell From Existing 11 / 0.4 Kv, 250 Kva Substation Sl-2 In Village Saloh Under Esd, Hpsebl Haroli. ( Bid No. Ged-31 / 2023-24 ) Name Of Scheme: Sop To Tubewells Under ( Op ) Circle, Hpsebl, Una ( Phase-Iii
Basic Detail
Tender No GED-31/2023-24
Bidding Type Tender
Location
City gagret
State Himachal Pradesh
Key Dates
Publish Date 26 Aug 2023
Submission Date 28 Aug 2023
Open Date 29 Aug 2023
Finance
Tender Value Ref. Documents
Tender Fee 590
EMD 8156
Exemption Not Available
Document List
377b5364-819c-445e-a7e2-2a4537fd411e.html
Bid.rar
BOQ_116253.xls
Spc.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 26, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 28, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 28, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 29, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

377b5364-819c-445e-a7e2-2a4537fd411e.html

rar

Bid.rar

xls

BOQ_116253.xls

pdf

Spc.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders