|
| 1 | Part A DESIGN, ENGINEERING, SUPPLY, INSTALLATION AND COMMISSIONING OF 400 KW SOLAR POWER PLANT WITH BATTERY ENERGY STORAGE SYSTEM WITH 8 YEARS O&M AT VILLAGE Hillour, Pangi VALLEY IN DISTRICT Chamba Rates for the Solar Part (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site) |
| 2 | Supply of SPV Modules as specified in the Tender documents |
| 3 | Supply of Inverters as specified in the Tender documents |
| 4 | Supply of Inverter transformer as specified in the Tender documents |
| 5 | Supply of Panels & Switchgears as specified in the Tender documents |
| 6 | Supply of Module mounting structure as specified in the Tender documents |
| 7 | Spare Modules ( 0.50% of total supply of solar modules) |
| 8 | Mandatory spares excluding modules |
| 9 | Cables ( all DC, LT & HT) |
| 10 | Supply of Balance of Systems for the Solar Part for commissioning of the Plant as specified in tender documents |
| 11 | Part BRates for the BESS Part (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site) |
| 12 | Supply of Battery alongwith the Battery Management System (BMS) as specified in the Tender documents |
| 13 | Supply of Bi-directional inverter (PCS) as specified in the Tender documents |
| 14 | Supply of Inverter transformer as specified in the Tender documents |
| 15 | Supply of Step-up Transformer as specified in the Tender documents |
| 16 | Supply of MV switchgear/RMU as specified in the Tender documents |
| 17 | Supply of Balance of Systems including all the equipments, spares, accessories, earthing, safety & fire fighting system etc excluding BESS part supply above and any other suppliesas specified in tender documents |
| 18 | Part C Rates for installation of Solar Part, Battery Part and other allied activities for successful completion of the400 KW Solar Power Plant With Battery Energy Storage System |
| 19 | Design, Engineering, Supply, Installation & Commissioning and performance testing of the equipments supplied and other services specified in the tender document. |
| 20 | Civil and allied works for construction of Module mounting structure, foundations etc for all the equipment supplied |
| 21 | Freight, Insurance, Loading unloading, storage at site, handling at site for allied works |
| 22 | Part D RATES FOR OPERATION & MAINTENENACE FOR EIGHT YEARS |
| 23 | Operation and Maintenance of the Solar PV Project with BESS for first year |
| 24 | Operation and Maintenance of the Solar PV Project with BESS for second year |
| 25 | Operation and Maintenance of the Solar PV Project with BESS for third year |
| 26 | Operation and Maintenance of the Solar PV Project with BESS for fourth year |
| 27 | Operation and Maintenance of the Solar PV Project with BESS for fifthyear |
| 28 | Operation and Maintenance of the Solar PV Project with BESS for sixthyear |
| 29 | Operation and Maintenance of the Solar PV Project with BESS for seventhyear |
| 30 | Operation and Maintenance of the Solar PV Project with BESS for eigthyear |