1 G.I Piping Works, Fittings Fixtures In Toilet To Master Bed A Type Flat I ) �Carefully Disengaging And Removing The Existing Plumbing / Sanitary Fittings / Fixtures From The Bath Room Including Concealed / Exposed Ci / Gi / P.V.C Pipes With Specials, C.P Brass Fittings, Including Water / Waste Water Connections, Medicine Chests, Mirror, Glass Shelves, Soap Dishes, Traps, Gratings Etc, Shifting And Stacking The Salvageable Items Removed At Place 2 2 Same As Item 1 Above But For B Type Flat With Only Change As Below Approximate Length Of 20Mm Cpvc Pipe Lines Including Water Lines From Geyser? 22.00 Rmt Per Flat 3 3 Tiling And Waterproofing Toilet To Master Bed Room A Type Flat Renovating The Master Bed Room Toilet Comprising The Following ( I ) Carefully Dismantling & Removing Existing Glazed, Ceramic Tile / Kota Stone Flooring Including Bedding Mortar Upto Brick Bat Surface, Removing Loose / Damaged Brick Bat Coba ( If Any ) , Disposing Off And Stacking The Salvageable Items At Place ( S ) Shown By The Engineers Of The Bank Within The Colony Premises, Disposing Off And Carting Away The Debris Out Of The Colony Premise Etc As Directed By The Engineers Of The Bank 4 4 Same As Item 3 Above But For B Type Flat With Only Change As Below Approximate Quantity Of Dado Per Flat ? 22.00 Sqm. Approximate Area Of The Toilet Floor ? 6.00 Sqm. Per Flat 5 5 Pvc Piping Works Sanitary Fittings In Common Toilet A Type Flat G.I P.V.C Piping Works, Plumbing Sanitary Fittings Fixtures In The Common Toilet Comprising The Following I ) �Carefully Disengaging And Removing The Existing Plumbing / Sanitary Fittings / Fixtures From The Bath Room Including Concealed / Exposed Ci / Gi / P.V.C Pipes With Specials, C.P Brass Fittings, Including Water / Waste Water Connections, Medicine Chests, Mirror, Glass Shelves, Soap Dishes, Traps, Gratings Etc, Shifting And Stacking The Salvageable Items Removed At Place ( S ) Shown By The Engineers Of The Bank, Disposing Off And Carting Away The Debris Out Of The Colony Premises Etc Complete As Directed By The Engineers Of The Bank 6 6 Same As Item 5 Above But For B Type Flat With Only Change As Below Approximate Length Of 20Mm Cpvc Pipe Lines Including Water Lines From Geyser? 17.00 Rmt Per Flat 7 7 Tiling And Waterproofing Work In Common Toilet - A Type Flat Providing And Renovating The Common Toilet Comprising The Following ( I ) Carefully Dismantling & Removing Existing Glazed, Ceramic Tile / Kota Stone Flooring Including Bedding Mortar Upto Brick Bat Surface, Removing Loose / Damaged Brick Bat Coba ( If Any ) , Disposing Off And Stacking The Salvageable Items At Place ( S ) Shown By The Engineers Of The Bank Within The Colony Premises 8 8 Same As Item 7 Above But For B Type Flat With Only Change As Below Approximate Quantity Of Dado Per Flat ? 22.00 Sqm. Approximate Area Of The Toilet Floor ? 4.20 Sqm. Per Flat 9 9 Gi Pvc Piping Plumbing Fittings In Study Room Toilet B Type Flat G.I / P.V.C Piping Works, Plumbing / Sanitary Fittings / Fixtures In The Study Room / Guest Room Toilet Comprising The Following I ) �Carefully Disengaging And Removing The Existing Plumbing / Sanitary Fittings / Fixtures From The Bath Room Including Concealed / Exposed Ci / Gi / P.V.C Pipes With Specials, C.P Brass Fittings, Including Water / Waste Water Connections, Medicine Chests, Mirror, Glass Shelves, Soap Dishes, Traps, Gratings Etc 10 10 Renovation Of Servant Room Toilet- B Type Flat Providing And Renovating The Toilet Comprising The Following ( I ) �� Carefully Dismantling & Removing Existing Glazed, Ceramic Tile Flooring Along With Bedding Mortar Upto Brick Bat Surface, Removing Loose / Damaged Brick Bat Coba ( If Any ) , Disposing Off And Stacking The Salvageable Items At Place ( S ) Shown By The Engineers Of The Bank Within The Colony Premises, Disposing Off And Carting Away The Debris Out Of The Colony Premise Etc As Directed By The Engineers Of The Bank. The Dismantling Is To Be Done Exclusively Using Manual Tools And No Breaker Or Any Other Mechanical Tools Shall Be Used. 11 11 Patch Plaster Work Carefully Dismantling & Removing Loose / Damaged Plaster On The Walls In Patches, Suitably Preparing The Surfaces As Instructed, Providing And Rendering Readymade Cement Mortar Plaster Of Required Thickness To Match With The Adjacent Surfaces Including Finishing Plaster With 1 Mm Thick Cement Based Putty Of Approved Make, Necessary Scaffolding, Curing Disposing Off And Carting Away The Debris From The Colony Premises Etc Complete As Instructed By The Bank?S Engineers. 12 12 Structural Repair To Rcc Member Slab / Columns Etc Providing And Repairing The Damaged R.C.C Members Like Columns, Roof Slabs, Beams, Lintels, Loft Slabs Or Any Other R.C.C Members Comprising The Following I ) ��Carefully Dismantling And Removing The Loose / Spalled Plaster And Concrete To Expose The Surface Of The Intact Concrete Surface / Corroded Reinforcement Bars, Using Hammer And Chisel Or Any Other Methods, Thoroughly Cleaning The Exposed Surface Of The Concrete / Reinforcements Using Clean Water / Rust Removers And Wire Brush Etc As Directed 13 13 Upvc Swr ( Type B ) Pipes Providing & Laying Best Quality Rigid Upvc Swr ( Type B ) Pipes Of Approved Make And Of Required Diameter With Supply And Fixing All Types Of Fittings And To Be Laid In Concealed Type Etc. For Drainage Tobath Room, Wash Basin, Washing Machine, Kitchen Sink, Etc. Connection Shall Be Made Up To Nahani Trap, And For Vent Pipe Including Testing For Leakages, Etc. Complete As Directed. 110 Mm Dia 14 14 Same As Item No13 Above But Pipes Of 75Mm Dia Same As Item No.13 Above But Pipes Of 75Mm Dia 15 15 Same As Item No13 Above But Pipes Of 40Mm Dia Same As Item No.13 Above But Pipes Of 40Mm Dia 16 16 Half Brick Masonry Carefully Dismantling The Existing Half Brick Work Along With The Existing Finishes Like Plaster, Embedded R .C. C Band / Lintel, Embedded Reinforcements, Disposing Off And Carting Away The Debris From The Banks Premises Etc As Directed By Banks Engineer. The Rate Shall Include Suitably Propping / Supporting / Protecting ( As Directed By The Banks Engineer ) The Adjacent / Residual Structure To Prevent Any Damage To Them. The Rate Shall Also Include Stacking The Salvageable Items At Location ( S ) Shown By The Banks Engineer Within The Banks Premises And Rebate For Taking Away The Same 17 17 Granite Stone Door Frame And Frp Door Shutter For Toilet Carefully Removing Old Existing Door Shutter With Frame And Stacking The Same At Location As Directed By Banks Engineer. Granite Stone Door Frame: Providing And Fixing Minimum 16 Mm Thick Machine Cut, Mirror Polished Granite Stone In Two Pieces Of 100Mm Wide For Soffit And Jambs Of Toilet Door Opening Of Approximate Size 800Mm X 2100Mm Lapped In Z Pattern By At Least 15Mm Using Synthetic Resin 18 18 Vitrified Tiles Flooring Providing And Laying Vitrified Tiles Flooring By Using Approved Make Vitrified Tiles Of 600�600Mm Size Or Any Other Size And Of Any Shade / Pattern. Tiles Shall Be Set On Cement Mortar Bedding In Cm 1:4 ( 1 Cement: 4 Sand ) Of Minimum Average Thickness Of 25Mm And Floated The Tiles In Grey Cement Paste For Fixing, Joints Of Tile Filled With Approved Tile Grout Mixed With Matching Pigment. 19 19 Vitrified Tiles Skirting Same As Above Item No. 18 But For Skirting Of Size 100 Mm High Of Full Vitrified Files Over Required Thickness Of 12 Mm Backing Coat Cement Mortar 1:4 ( 1 Cement: 4 Sand ) , Including Grouting The Joint With White Cement & Matching Pigments, Corners Shall Be Finished With Bevelled Ioint Etc. Rates Shall Also Include Cutting The Tiles To Required Shape, Wastage, Cleaning, Carting Away The Debris Out Of The Premises. ( Basic Price Of Vitrified Tiles - Ex-Godown At Mumbai Including Gst - Rs.750 / - Per Sqm. ) 20 20 Upvc Variety Sliding Windows Supplying, Fabricating And Fixing In Position As Per Manufacturing Specification Upvc Variety Sliding Windows A ) Carefully Dismantling And Removing The Existing Window Frames, Griils And Shutters Without Using The Vibrator And Cutting Properly With Hand , Shifting And Stacking The Removed Salvageable Items At Location Shown Within The Colony Premises, Disposing Off And Carting Away The Debris Out Of The Colony Premises Including Rebate For Taking Away Old Window Frames & Shutters, Making Good The Damages Done To Old Floor Tiles While Removing Window Frames / Shutters Etc. Complete As Directed By The Engineers Of The Bank. 21 21 Upvc Variety Door ( In Hall Balcony Only ) A ) Carefully Dismantling And Removing The Existing Living Room Door Frame, Shutters And Floor Tiles At Sill / Threshold Without Using The Vibrator And Cutting Properly With Hand, Shifting And Stacking The Removed Salvageable Items At Location Shown Within The Colony Premises, Disposing Off And Carting Away The Debris Out Of The Colony Premises Including Rebate For Taking Away Old Door Frames & Shutters, Making Good The Damages Done To Old Floor Tiles ( If Any ) While Removing Door Frames / Shutters Etc. Complete As Directed By The Engineers Of The Bank 22 22 Aluminium Ventilator System A ) Carefully Dismantling And Removing The Existing Window Frames, Griils And Glass Lovers Etc. Without Using The Vibrator And Cutting Properly With Hand , Shifting And Stacking The Removed Salvageable Items At Location Shown Within The Colony Premises, Disposing Off And Carting Away The Debris Out Of The Colony Premises Including Rebate For Taking Away Old Window Frames & Shutters, Making Good The Damages Done To Old Floor Tiles While Removing Window Frames Etc 23 23 Aluminium Safety Grill Providing & Fixing 40Mm X24mmx 0.95 Mm ( Section 14027 Wt.0.381 Kg / M ) Tubular Outer Frame, ( Horizontal :-2Nos. & Vertical 3 Nos. ) . Fixing Aluminum Grill 7.0Mm Thk As Above Item No. 1 But In 2Nos. Fixed Panels With F* Channel To Tubular Frame And One Middle Section .H. Type In Centre All Aluminum Sections & Grill Will Be Powder Coated In Required Shade Of 50 Micron Thickness In Living Room Balcony. ( Approximate Size 154 X 30 ) 24 24 Internal Painting- One Coat Of Approved Cement Primer Providing And Applying One Coat Of Approved Cement Primer And Two Or More Coats Of Good Quality Plastic Emulsion Paint On The Ceiling / Soffits, Etc. Of Approved Manufacturer And Shade As Per Manufacturer Specifications With Thorough Surface Preparation By Scrapping The Old Paint Surface Using Sand Paper, Filling The Cracks / Depression With Cement Putty Of Approved Make To Make Desire & Smooth Surface Finish Before Paint Application. The Rate Shall Be Inclusive Of Required Scaffolding, Cleaning Of The Stains From Floors, Carting Away The Debris, Etc. Complete As Directed. 25 25 Internal Painting Scrapping The Old Paint Surface Thoroughly Scrapping The Old / Loose Paint Surface Using Sandpaper And Providing & Applying Cement Primer With Filling The Cracks / Depressions With Cementitious Putty Of Approved Make In Two Coats For Desired Thickness For Surface Preparation & Finish Of Walls, Thoroughly Scrapping Each Coat Of Putty To Get Smooth And Uniform Finish 26 26 Internal Painting Coats Synthetic Enamel Paint Providing And Applying Two Or More Coats Of 1St Quality Synthetic Enamel Paint Of Desired Finish Of Approved Manufacture And Shade To Teakwood / Commercial Board Surfaces Of Doors, Windows, Shelves, Meter Box, Wall Surfaces, Etc. Including Surface Preparation, Scrapping, Filling Putty, Application Of Approved Primer, Cleaning, Scaffolding, Carting Away The Debris, Etc. Complete As Directed 27 27 Internal Painting Fresh Polish In Required Number Of Coats Providing And Applying Fresh Polish In Required Number Of Coats Of Approved Tint For Wood Works Including Surface Preparation By Scrapping The Existing Surface With Sand Paper, Filling Of Wax Wherever Required, Levelling And Applying The Polish Uniformly To Give Even And Smooth Surface, Cleaning The Stains From The Surrounding, Taking All The Care For Avoiding Staining The Surrounding Area, Etc. Complete. 28 28 Internal Painting Coats Of Exterior Quality Acrylic Elastomeric Paint Providing & Applying Two Or More Coats Of Approved Make & Shade 1St Quality Exterior Quality Acrylic Elastomeric Paint Over A Coat Of Recommended Primer By The Manufacturer On Old / New Plastered Surfaces, As Per Site Requirement To Walls, Columns, Parapet Walls, Pedestals, Etc. As Per Specification. The Rates Shall Be Including Of Surface Preparation By Through Scrapping 29 29 Internal Painting Fixing In Position Pop Cornice Providing And Fixing In Position Pop Cornice Of Appx. Size 150Mm X 150Mm To Ceiling And Wall Junction Of Approved Design And Pattern With Smooth Pop Material Finish To Joints And Corners To Match The Profile Of Design All Along Its Length ( With Minimum Joints ) . The Rate Shall Be Inclusive Of Required Scaffolding, Site Cleaning Etc. All Complete As Directed By Bank?S Engineer. 30 30 Cgst Enter Total Cgst 31 31 Sgst Enter Total Sgst