Construction Of Terracing , At. Dhanpur, Gat No 1, 2, 3, 4, 5, Watershed No. Te-111 / 02 / 04Talukatalodadist Nandurbar. ( For Open Contractor )
Tender Value
13.38 Lakhs
Estimated cost
Bid Submission
28 Aug 2023
0 days left
EMD
13386
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
dhanpur → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Terracing , At. Dhanpur, Gat No 1, 2, 3, 4, 5, Watershed No. Te-111 / 02 / 04Talukatalodadist Nandurbar. ( For Open Contractor )
BOQ
| Sl. No. | Item Description |
| 1 | Construction ofTERRACING, Dhanpur GatNo. 1 |
| 2 | ( CSR-2023-24) Item No 2/1 :Excavation Iin all kind of soil including boulders upto 0.6m diameter(0.113 cum) for canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lead upto 15 m. and all lifts as directed |
| 3 | Item No 10.5A-1P.No.22 :Additional Lead charges fort excavation by machinery (Per CuM) 15 M to 250M |
| 4 | Provision For Work Insurance Charge at 1% of work cost |
| 5 | Provision For Labour Welfare Fund Charge at 1% of work cost |
| 6 | GST 12 %Charge onTotal Work Cost of Work |
| 7 | SDAO office shahada level expenditure Contigencies at 2 %Charge onTotal Work Cost of Work |
| 8 | Construction ofTERRACING, Dhanpur GatNo. 2 |
| 9 | ( CSR-2023-24) Item No 2/1 :Excavation Iin all kind of soil including boulders upto 0.6m diameter(0.113 cum) for canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lead upto 15 m. and all lifts as directed |
| 10 | Item No 10.5A-1P.No.22 :Additional Lead charges fort excavation by machinery (Per CuM) 15 M to 250M |
| 11 | Provision For Work Insurance Charge at 1% of work cost |
| 12 | Provision For Labour Welfare Fund Charge at 1% of work cost |
| 13 | GST 12%Charge onTotal Work Cost of Work |
| 14 | SDAO office shahada level expenditure Contigencies at 2 %Charge onTotal Work Cost of Work |
| 15 | Construction ofTERRACING, Dhanpur GatNo. 3 |
| 16 | ( CSR-2023-24) Item No 2/1 :Excavation Iin all kind of soil including boulders upto 0.6m diameter(0.113 cum) for canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lead upto 15 m. and all lifts as directed |
| 17 | Item No 10.5A-1P.No.22 :Additional Lead charges fort excavation by machinery (Per CuM) 15 M to 250M |
| 18 | Provision For Work Insurance Charge at 1% of work cost |
| 19 | Provision For Labour Welfare Fund Charge at 1% of work cost |
| 20 | GST 12%Charge onTotal Work Cost of Work |
| 21 | SDAO office shahada level expenditure Contigencies at 2 %Charge onTotal Work Cost of Work |
| 22 | Construction ofTERRACING, Dhanpur GatNo. 4 |
| 23 | ( CSR-2023-24) Item No 2/1 :Excavation Iin all kind of soil including boulders upto 0.6m diameter(0.113 cum) for canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lead upto 15 m. and all lifts as directed |
| 24 | Item No 10.5A-1P.No.22 :Additional Lead charges fort excavation by machinery (Per CuM) 15 M to 250M |
| 25 | Provision For Work Insurance Charge at 1% of work cost |
| 26 | Provision For Labour Welfare Fund Charge at 1% of work cost |
| 27 | GST 12%Charge onTotal Work Cost of Work |
| 28 | SDAO office shahada level expenditure Contigencies at 2 %Charge onTotal Work Cost of Work |
| 29 | Construction ofTERRACING, Dhanpur GatNo. 5 |
| 30 | ( CSR-2023-24) Item No 2/1 :Excavation Iin all kind of soil including boulders upto 0.6m diameter(0.113 cum) for canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lead upto 15 m. and all lifts as directed |
| 31 | Item No 10.5A-1P.No.22 :Additional Lead charges fort excavation by machinery (Per CuM) 15 M to 250M |
| 32 | Provision For Work Insurance Charge at 1% of work cost |
| 33 | Provision For Labour Welfare Fund Charge at 1% of work cost |
| 34 | GST 12%Charge onTotal Work Cost of Work |
| 35 | SDAO office shahada level expenditure Contigencies at 2 %Charge onTotal Work Cost of Work |
AI Tender Summary
Tender Timeline
Aug 21, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedAug 28, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 30, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender