Paschimanchal Vidyut Vitran Nigam Limited has published Regarding Release 16 Kw ( Hv-3 ) New Connection Of Nhai Care Of Ravi Kumar At Toll Plaza, Bhuni, And Given New Connection 77 Kw, Lmv-6 18Of M / S Khatu Shyam Bevrage Care Of Smt. Rakhi W / O Sh. Dinesh In Village Madarpura Underthe Area Of Edsd-Iii, S. Submission Date for this Tender is 28-08-2023. Overhead Line Tenders in Meerut Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Aug-2023 | T95/EDC-II/MT/2023-24_dtext | Date | 28-08-2023 |
Sl. No. | Item Description |
1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– |
2 | a) STP pole 11 mtrlong. |
3 | b) 11KV CT /PT Unit |
4 | c) 11 KV Meter cubical |
5 | d) 11 KV XLPE cable size 3x70 sq.mm. |
6 | e) 25 kva t/f |
7 | Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 40 Km. |
8 | Cartage of following material fromJE Store to site of work including loading & unloading at both ends maximum distance up to 20 Km. :– a) STP pole 11 mtr long. |
9 | b) 11KV CT /PT Unit |
10 | c) 11 KV Meter cubical |
11 | d) 11 KV XLPE cable size 3x70 sq.mm. |
12 | e) 25 kva t/f |
13 | Erection ofsection DPPole on STP 11 mtr. long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work with fabrication and fixing all line accessories. |
14 | Erection ofSinglePole on STP 11 mtr/13 mtr . long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work with fabrication and fixing all line accessories. |
15 | Laying lifting stringing of proper sagging of ACSR weasel conductor |
16 | Mounting of 25 kva on double pole with making connection properly. |
17 | Digging the cable trunch |
18 | Laying of 11 KV XLPE cable size 3x70sq.mm. |
19 | Fixing of 11 KV heat shrinkable cable jointing kits |
20 | Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
21 | Grouting of STP poles with Dust, Cement & Stone blast concreting. |
22 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. |
23 | chemical earthing for meter cubical |
24 | Earting of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire. |
25 | Mounting of 11 KV CT/PT Unit on double pole with making connection properly. |
26 | Grouting of 11 KV meter cubical properly |
27 | Providing and fixing stay clamps . |
28 | Providing and fixing Holding clamps . |
29 | Providing and fixing F clamps . |
30 | Providing and fixing GI pipe |
31 | Providing and fixing Bolt and Nuts . |