Paschimanchal Vidyut Vitran Nigam Limited has published Regarding Release 100 Kva ( Hv-1 ) And40 Kva Lmv- 3 New Connection Of Nhai Care Of Ravi Kumar At Toll Plaza, Bhuni, And 18 Kwnew Connection Nhai Care Of Ravi Site Kanker Khera Bypass Sardhana, Meerut Under The Area Of Edsd-Iii, Sardhana Dehat Of Edd-2. Submission Date for this Tender is 28-08-2023. Electrification Work Tenders in Meerut Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Aug-2023 | T94/EDC-II/MT/2023-24_dt_ext | Date | 28-08-2023 |
Sl. No. | Item Description |
1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– |
2 | a) STP pole 11 mtrlong. |
3 | b) 11KV CT /PT Unit |
4 | c) 11 KV Meter cubical |
5 | d) 11 KV XLPE cable size 3x70 sq.mm. |
6 | e) 25 kva to 63 kva t/f |
7 | Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 40 Km. |
8 | Cartage of following material fromJE Store to site of work including loading & unloading at both ends maximum distance up to 20 Km. :– a) STP pole 11 mtr long. |
9 | b) 11KV CT /PT Unit |
10 | c) 11 KV Meter cubical |
11 | d) 11 KV XLPE cable size 3x70 sq.mm. |
12 | e) 25 kva to 63 kva t/f |
13 | Erection ofsection DPPole on STP 11 mtr. long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work with fabrication and fixing all line accessories. |
14 | Erection ofSinglePole on STP 11 mtr/13 mtr . long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work with fabrication and fixing all line accessories. |
15 | Laying lifting stringing of proper sagging of ACSR weasel conductor |
16 | Mounting of 25 kva to 63 kva on double pole with making connection properly. |
17 | Digging the cable trunch |
18 | Laying of 11 KV XLPE cable size 3x70sq.mm. |
19 | Fixing of 11 KV heat shrinkable cable jointing kits |
20 | Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
21 | Grouting of STP poles with Dust, Cement & Stone blast concreting. |
22 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. |
23 | chemical earthing for meter cubical |
24 | Earting of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire. |
25 | Mounting of 11 KV CT/PT Unit on double pole with making connection properly. |
26 | Grouting of 11 KV meter cubical properly |
27 | Providing and fixing stay clamps . |
28 | Providing and fixing Holding clamps . |
29 | Providing and fixing F clamps . |
30 | Providing and fixing GI pipe |
31 | Providing and fixing Bolt and Nuts . |