| 1 | fo|qr forj.k [k.M&tgkWxhjkckn ds dk;Z{ks= esa iw.kZtek ;kstukUrxZr ¼>ViV@fuos”k fe= iksVZy½ ij izkIr vkosnu tSls ;Fkk vkS|ksfxd] okf.kfT;d] ykbZu f”kf¶Vax o fo|qr la;kstu o vU; la;kstu “kh?kz vfr”kh?kz fuxZRk fd;s tkus ds dk;ZA |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 3 | STP 11 mtr Long from E.S.C Bulandshahr to Site |
| 4 | CT/PT unit 10/5Afrom ESC. BSR to site |
| 5 | Piffer ressitant metering cubiclefrom ESC. BSR to site with the help of Crane. |
| 6 | TVM 11 KV |
| 7 | Cable 3x70 sqmm 11 KV XLPEwith the help of Crane. |
| 8 | Carriage 25/63/100 Kva TF |
| 9 | Carriage of All line Material from store to j.e\"s store at as ACSR Weasel conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator & Pin Insulator etc. |
| 10 | Erection ofSingle support including complete 1 I.T.fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Erection ofDouble Pole support including complete 1 I.T.fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Grouting of D/P for installation of CT/PT unit & 250 KVA T/F shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 14 | Mounting & Installation 25/63/100 kva T/F on the double Pole. |
| 15 | Grounting of Stay rod. |
| 16 | Fixing of erathing rod. |
| 17 | Laying of 3x70 sqmm 11KV XLPE cable putting sand around the cable Fixing of bricks in both sides & top and refilling of trench and its proper ramming including providing necessary loop on both sides. |
| 18 | Laying, sagging. Stringing and binding and jumpering of ACSR weisal, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 19 | Mounting CT/PT unit on D/Pwith the help of Crane. |
| 20 | Fixing of Cable Box suitable for 3X70 sqmm 11KV XLPE. |
| 21 | Wrapping of Barbed wire |
| 22 | Providing & Fixing Holding Clamps. |
| 23 | Laying and ABC Cable |
| 24 | Providing & Fixing Stay Clamps. |
| 25 | Providing & Fixing Stay Insulator. |
| 26 | L.T. Clamp. |
| 27 | L.T. Insulator |
| 28 | F. Clamp. |
| 29 | Pipe Earthing as per norms |
| 30 | Providing Nut & Bolts off-size |
| 31 | Installation & Errection of Piffer ressitant metering cubicle . |
| 32 | Extra Milage charges and carriage from PCC/ST Pole & other materialfrom each 10 Km. |
| 33 | Above work shall be done as per UPPCL/RESPO Rules. |