| 1 | Providing & Fixing Vitrified tiles in floors, treads or steps and landing on 25mm thick bed of c.m. 1:1 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete as per direction of the Engineer-in-charge. Ground Floor |
| 2 | Providing & Fixing Vitrified tiles in floors, treads or steps and landing on 25mm thick bed of c.m. 1:1 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete as per direction of the Engineer-in-charge. First Floor |
| 3 | Vitrified tiles in floors, treads or steps and landingincluding cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete as per direction of the Engineer-in-charge. |
| 4 | Fixing vitrifiedtiles in dados,skirting and riser ofstepson 12 mm thick cement plaster1:3 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete. Ground Floor |
| 5 | Fixing vitrifiedtiles in dados,skirting and riser ofstepson 12 mm thick cement plaster1:3 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete.e as per direction of the Engineer-in-charge. First Floor |
| 6 | Vitrifiedtiles in dados,skirting and riser ofsteps including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete. as per direction of the Engineer-in-charge. |
| 7 | Fixing ceramictiles in dados,skirting and riser ofstepson 12 mm thick cement plaster1:3 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete. Ground Floor |
| 8 | Fixing Ceramictiles in dados,skirting and riser ofstepson 12 mm thick cement plaster1:3 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete.e as per direction of the Engineer-in-charge. First Floor |
| 9 | Ceramictiles in dados,skirting and riser ofsteps including cost of precast tiles,all materials,labour.t&p,all taxes of materials etc complete. as per direction of the Engineer-in-charge. |
| 10 | Painting two coats with synthetic enamel paintto new steel/ wooden surface with a coat of primer including necessary preparation of surface, cost, conveyance,all taxes of all of materials, labour, T&Petc. complete to shape as per direction of the Engineer-in-charge. Ground Floor Steel |
| 11 | Painting two coats with synthetic enamel paintto new steel/ wooden surface with a coat of primer including necessary preparation of surface, cost, conveyance,all taxes of all of materials, labour, T&Petc. complete to shape as per direction of the Engineer-in-charge. First Floor Steel |
| 12 | Providing supplyingfitting and fixing of M.S grill for windows of approved M.S. angles of approved gaugeat site with including cost, conveyance of materials labour, T&P required for the work, including royalty, taxes etc.complete as per direction of the Engineer-in-charge. |
| 13 | Supplying and fitting-fixing of Unplasticised Poly Vinyl Chloride(UPVC) (FENESTA/NCL VEKA LTD.) tHREE tRACK-Three Track-Three Panel sliding window-60-Series duly Manufactured using UPVC reinforced profiles of 108mm x 45mmx 2.5 mm for outer frames and Window Sash of 39mm x 58 mmx2.5 mm capable of mounting single glazing system,structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the window frame shall be fitted with 6mm thick clear tougherned glass of SAINT-GOBAIN make duly fixed with EPDM weathering seal resistant and the system is to be installed using Reinforced Large Coupler at the site using anchor fasteners, sliicon rubber sealand.easy glazing/ deglazing at site etc., including cost and conveyance of all materials assessories, labour charges,materials and product conforming to ASTMD 638-14,EN-477-95 and other applicable codes and standards as per direction of E.I.C |
| 14 | Dismentaling & removing of old damaged window/door& stack at site for reuse with removing debris including all labour, T&P etc.complete |
| 15 | Finishing wall surfaces with Acrylic wall putty (Water based) of approved make and finished smooth and even surfaces to receive painting including cost of all materials taxes, labour T&P etc. and as per direction of E.I.C. -Inside putty (Ground floor) |
| 16 | Finishing wall surfaces with Acrylic wall putty (Water based) of approved make and finished smooth and even surfaces to receive painting including cost of all materials taxes, labour T&P etc. and as per direction of E.I.C. -Inside putty (First floor) |
| 17 | Providing 12mm thick C.P. in C.M.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, T&P required for the work, including royalty etc.complete as per direction of the Engineer-in-charge. |
| 18 | Providing 16mm thick C.P. in C.M.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, T&P required for the work, including royalty etc.complete as per direction of the Engineer-in-charge. |
| 19 | Providing 6mm thick cement plaster in c.m. (1:4) to RCC surface with slury treatmentfinished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. |
| 20 | Providing supplyingfitting and fixing of M.S grill for windows of approved M.S. angles of approved gaugeat site with including cost, conveyance of materials labour, T&P required for the work, including royalty, taxes etc.complete as per direction of the Engineer-in-charge. |
| 21 | Painting two coats with synthetic enamel painttosteel/ wooden surface with a coat of primer including necessary preparation of surface, cost, conveyance,all taxes of all of materials, labour, T&Petc. complete to shape as per direction of the Engineer-in-charge. |
| 22 | Finishing wall with Plastic paint2 coats in approved quality including necessary preparation of surface, costconveyance all taxes of materials, labour, T&Petc. complete to shape as per direction of the Engineer-in-charge. Ground Floor |
| 23 | Finishing wall with Plastic paint2 coats in approved quality including necessary preparation of surface, costconveyance all taxes of materials, labour, T&Petc. complete to shape as per direction of the Engineer-in-charge. First Floor |
| 24 | Provision for Electrification |